| Date |
Text |
| 2021-10-26 11:04:21 | ELEVATION CERTIFICATE |
| | REVIEW COMMENTS |
| | 145 BLOOMFIELD DRIVE |
| | |
| | 1ST REVIEW: FBC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE LATITUDE AND LONGITUDE FOR ITEM A5 ARE INCORRECT |
| | AND ARE REQUIRED TO BE AT LEAST 5 DECIMAL PLACES. |
| | CHANGE TO LATITUDE 26.65871 AND LONGITUDE -80.04876. |
| | |
| | 2) FOR ITEM A7 THE BUILDING DIAGRAM NUMBER SHOULD BE 1B |
| | FOR A RAISED SLAB ON GRADE. |
| | |
| | 3) THE PLANS SPECIFY THE ATTACHED GARAGE IS 535 SQFT. |
| | ITEM A9 A) HAS 500 SQFT. |
| | |
| | 4) THERE ARE (4) FLOOD OPENINGS SPECIFIED ON THE PLANS |
| | AND SHOWN IN THE PHOTOGRAPHS. ITEM A9 B) LISTS 0. |
| | |
| | 5) A9 C) LISTS THE NET AREA OF FLOOD OPENINGS AS 0.0 |
| | SQIN. SHEET A-1.0 OF THE PLANS HAS CALCULATIONS |
| | SPECIFYING THAT 7448 SQIN OF NET OPENING AREA WILL BE |
| | PROVIDED. |
| | |
| | 6) IN ITEM B3 THE 2-LETTER STATE ABBREVIATION SHOULD BE |
| | ENTERED. FLORIDA SHOULD NOT BE SPELLED OUT. |
| | |
| | 7) THE DATE OF THE FIRM IN ITEM B6 IS INCORRECT. THE |
| | CORRECT DATE IS 10-05-2017. |
| | |
| | 8) THE EFFECTIVE DATE OF THE FIRM PANEL IN ITEM B7 IS |
| | ALSO INCORRECT. THE CORRECT DATE IS 10-05-2017. |
| | |
| | 9) THE FLOOD ZONES IN B8 SHOULD BE X500 & AE. |
| | |
| | 10) FINISHED CONSTRUCTION IS MARKED IN ITEM C1. THE |
| | PHOTOS DO NOT APPEAR TO SHOW THAT THE GRADING AROUND |
| | THE BUILDING IS COMPLETE WHICH IS REQUIRED FOR THE |
| | FINAL E. C. |
| | |
| | 11) ITEM C2 D) LISTS THE ELEVATION FOR THE TOP OF |
| | GARAGE SLAB AS 6.6 FT. THE TIE IN SURVEY SPECIFIES THE |
| | GARAGE ELEVATION AS 6.21' FT. THESE ELEVATIONS NEED TO |
| | BE CONSISTENT. |
| | |
| | 12) ITEM C2 E) LISTS THE LOWEST ELEVATION OF THE |
| | EQUIPMENT SERVICING THE BUILDING AS 7.5 FT. THE |
| | EQUIPMENT IS REQUIRED TO BE AT OR ABOVE THE DFE WHICH |
| | IS 8' NAVD. |
| | |
| | 13) THE METHOD USED TO DETERMINE LATITUDE AND LONGITUDE |
| | IS TO BE INDICATED IN THE COMMENTS AREA OF SECTION D. |
| | |
| | 14) SUBMIT THE SPECIFICATIONS, EVALUATION REPORT, |
| | PRODUCT APPROVAL, ETC. FOR THE FLOOD OPENINGS THAT WERE |
| | USED. THE PHOTOS APPEAR TO SHOW DIFFERENT FLOOD VENTS |
| | THAN THE GREENHECK LOUVERS THAT ARE SPECIFIED ON THE |
| | PLANS. |
| | |
| | 15) NEW PHOTOS OF THE BUILDING SHOWING THE FINISH |
| | GRADES ARE REQUIRED. |
| | |
| | 16) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH |
| | OF THE REVIEW COMMENTS HAS BEEN ADDRESSED. |
| | |
| | |