| Date |
Text |
| 2021-11-09 16:07:07 | PLAN REVIEW / NFIP |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/SFP306 |
| | INSPECTOR BN4338 |
| | BUILDING OFFICIAL BU1635 |
| | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | CITY ORDINANCE NO. 4658-16 |
| | |
| | 4TH REVIEW |
| | |
| | |
| | NOTICE: PROVIDE A CONSTRUCTION DRAWING ELEVATION |
| | CERTIFICATE. |
| | |
| | PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARD AREA |
| | (SFHA). IT IS LOCATED IN FLOOD ZONE AE WITH BASE FLOOD |
| | ELEVATIONS OF 6.0 FEET AND 7.0 FEET NAVD. |
| | MAIN DWELLING UNIT IS LOCATED IN FLOOD ZONE AE 7 . BFE |
| | IS 7.0' NAVD. DFE SHALL NOT BE LESS THAN 9.0 FEET NAVD. |
| | FREE STANDING CABANA/GARAGE IS LOCATED IN FLOOD ZONE AE |
| | 6. BFE IS 6.0' NAVD. DFE SHALL NOT BE LESS THAN 8.0' |
| | NAVD. |
| | |
| | |
| | NOTICE: |
| | |
| | 3 ELEVATION CERTIFICATES (EC) ARE REQUIRED |
| | |
| | A CONSTRUCTION DRAWING ELEVATION CERTIFICATE IS |
| | REQUIRED AT TIME OF PERMIT APPLICATION. |
| | |
| | A BUILDING UNDER CONSTRUCTION ELEVATION CERTIFICATE IS |
| | REQUIRED AT PLACEMENT OF 1ST FLOOR. |
| | SUBMIT TO BUILDING DEPARTMENT FOR REVIEW. |
| | |
| | A FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS |
| | REQUIRED AND SHALL BE SUBMITTED FOR REVIEW AND APPROVAL |
| | PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. |
| | NOTE: YOU MAY SUBMIT THIS EC FOR REVIEW AFTER FINAL |
| | GRADE AND PLACEMENT OF EQUIPMENT SERVICING THE |
| | BUILDING. |
| | |
| | |
| | NOTICE: A SEPERATE PERMIT AND ELEVATION CERTIFICATE ARE |
| | REQUIRED FOR THE MAIN RESIDENCE. (SEE PERMIT 21060673) |
| | |
| | NOTICE: PROVISO ON PLAN PAGE S-1.1 |
| | |
| | NOTICE: PRINT HOLD FOR CONSTRUCTION DRAWING EC |
| | |
| | NOTICE: C/O HOLD FOR FINISHED CONSTRUCTION EC |
| | |
| | NOTICE: COMMENTS TO BE ADDED TO INSPECTION SCREEN AFTER |
| | INSPECTION HOLDS REMOVED. |