| 2023-04-04 09:44:01 | BUILDING REVIEW APPROVED WITH PROVISO: |
| | 1- REVISE "CONSTRUCTION DRAWINGS" ELEVATION |
| | CERTIFICATE: A) THE LATITUDE SPECIFIED ON ITEM A5 NEED |
| | TO PROVIDE AT LEAST 5 DECIMAL PLACES OR BETTER AS |
| | REQUIRED BY THEE FEMA ELEVATION CERTIFICATE PUBLISHED |
| | INSTRUCTIONS. B)GARAGE SQUARE FOOTAGE DOESN'T MATCH |
| | PLANS. C)REVISE TOTAL NET AREA OF FLOOD OPENINGS TO |
| | MATCH PLANS AND PRODUCT APPROVAL. D)THE BASE FLOOD |
| | ELEVATION SPECIFIED ON ITEM B9 IS INCORRECT. E)ATTACHED |
| | GARAGE ELEVATION SPECIFIED ON ITEM C2(D) TO MATCH PLANS |
| | ENGINEER OF RECORD PLANS. F)LOWEST ADJACENT (FINISHED) |
| | GRADE AND HIGHEST ADJACENT (FINISHED) GRADE ARE NO |
| | SHOWN ON SURVEY WITH PROPOSED STRUCTURE. UNABLE TO |
| | VERIFY. G)SURVEYOR NEEDS TO DATE ELEVATION CERTIFICATE |
| | WITH CURRENT DATE. ELEVATION CERTIFICATE WAS REVISED |
| | BUT SAME DATE WAS SHOWN. |
| | |
| | 2- PRODUCT APPROVAL DEFERRAL: A)INSWING ENTRY DOORS. |
| | B)INSWING SIDE DOOR #4. C)SLIDING GLASS DOORS. |
| | D)OVERHEAD GARAGE DOOR. E)CASEMENT WINDOWS. F)SINGLE |
| | HUNG WINDOWS. G)FIXED WINDOWS. H)HORIZONTAL ROLLER |
| | WINDOWS. I)WINDOW MULLIONS (NOTE: NEED TO SPECIFY |
| | MULLION SIZE. J)HURRICANE SHUTTERS IF DOORS AND WINDOWS |
| | DON'T HAVE IMPACT GLAZING. AND, PROVIDE COMPLETE |
| | INSTALLATION SCHEDULE. K)SHINGLES. L)PEEL & STICK |
| | SHINGLES UNDERLAYMENT SPECIFIED ON PLANS. |
| | M)RIDGE VENTS AS SPECIFIED ON PLANS. N)FLOOD VENTS AS |
| | SPECIFIED ON PLANS. |
| | |
| | 3- ENGINEER OF RECORD TO SPECIFY PROPOSED FINISH FLOOR |
| | ELEVATION OF GARAGE. |
| | |
| | |