| 2022-01-27 14:16:06 | OFFICE BUILD OUT |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) PLEASE SHOW THE DOORS LOCATED IN THE FIRE RATED |
| | WALLS TO BE FIRE RATED PER FBC 716 (SUCH AS DOORS |
| | 17029, 18075, 18074, 18070, 18069, 18068) |
| | |
| | 2) ACCESSIBLE RESTROOMS - DRAWING A0-00D - PLEASE SHOW |
| | THE DIMENSION OF THE TOILET PAPER HOLDER FROM THE FACE |
| | OF THE TOILET TO THE CENTER OF THE TOILET PAPER HOLDER |
| | - FBC A 604.7 DISPENSERS. |
| | TOILET PAPER DISPENSERS SHALL COMPLY WITH 309.4 AND |
| | SHALL BE 7 INCHES (180 MM) MINIMUM AND 9 INCHES (230 |
| | MM) MAXIMUM IN FRONT OF THE WATER CLOSET MEASURED TO |
| | THE CENTERLINE OF THE DISPENSER. |
| | |
| | 3) ACCESSIBLE RESTROOM - DRAWING A0-00D - FOR THE |
| | MIRROR PLEASE SHOW THE DIMENSION FROM THE FINISHED |
| | FLOOR TO THE REFLECTIVE SURFACE FBC A 603.3 MIRRORS. |
| | MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS SHALL |
| | BE INSTALLED WITH THE BOTTOM EDGE OF THE REFLECTING |
| | SURFACE 40 INCHES (1015 MM) MAXIMUM ABOVE THE FINISH |
| | FLOOR OR GROUND. |
| | |
| | 4) ACCESSIBLE RESTROOM - DRAWING A0-00D - THE VERTICAL |
| | GRAB BAR SHOWN IS NOT A REQUIREMENT OF THE FBC |
| | ACCESSIBILITY - PLEASE SHOW THE 12 INCH CLEARANCE ABOVE |
| | THE VERTICAL GRAB BAR PER FBC A 609.3 THE SPACE BETWEEN |
| | THE GRAB BAR AND PROJECTING OBJECTS ABOVE SHALL BE 12 |
| | INCHES (305 MM) MINIMUM. |
| | |
| | 5) PLEASE PROVIDE THE ROOF TOP MECHANICAL SCREENING |
| | DETAILS FROM A DESIGN PROFESSIONAL TO MEET THE WIND |
| | LOADS FBC 1609 |
| | |
| | 6) ROOF TOP SCREENING DETAILS MAY BE DEFERRED |
| | SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON THE |
| | CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT |
| | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |