| 2021-10-25 14:52:15 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | 1) SHEET A0 -17 - THERE IS AN INDICATION OF COMMENT Z1 |
| | 1HR WATER CURTAIN EQUIVALENT. |
| | |
| | THERE IS A DOUBLE DOOR ALSO INDICATED WHICH CAN NOT BE |
| | WITHIN THE PROPOSED RATED WALL WITH A WINDOW SPRINKLER. |
| | |
| | THIS IS A MIS-APPLICATION OF A WATER CURTAIN. |
| | |
| | 8.15.26* SPRINKLER-PROTECTED GLAZING. |
| | |
| | WHERE SPRINKLERS ARE USED IN COMBINATION WITH GLAZING |
| | AS AN ALTERNATIVE TO A REQUIRED FIRERATED |
| | WALL OR WINDOW ASSEMBLY, THE SPRINKLER-PROTECTED |
| | ASSEMBLY SHALL COMPLY WITH THE |
| | FOLLOWING: |
| | (1) SPRINKLERS SHALL BE LISTED AS SPECIFIC APPLICATION |
| | WINDOW SPRINKLERS UNLESS THE STANDARD |
| | SPRAY SPRINKLERS ARE SPECIFICALLY PERMITTED BY THE |
| | BUILDING CODE. |
| | (2) SPRINKLERS SHALL BE SUPPLIED BY A WET-PIPE SYSTEM. |
| | (3) GLAZING SHALL BE HEAT-STRENGTHENED, TEMPERED, OR |
| | GLASS CERAMIC AND SHALL BE FIXED. |
| | (4) WHERE THE ASSEMBLY IS REQUIRED TO BE PROTECTED FROM |
| | BOTH SIDES, SPRINKLERS SHALL BE |
| | INSTALLED ON BOTH SIDES OF THE GLAZING. |
| | (5) THE USE OF SPRINKLER-PROTECTED GLAZING SHALL BE |
| | LIMITED TO NON-LOAD-BEARING WALLS. |
| | (6) THE GLAZED ASSEMBLY SHALL NOT HAVE ANY HORIZONTAL |
| | MEMBERS THAT WOULD INTERFERE WITH UNIFORM |
| | DISTRIBUTION OF WATER OVER THE SURFACE OF THE GLAZING, |
| | AND THERE SHALL BE NO OBSTRUCTIONS |
| | BETWEEN SPRINKLERS AND GLAZING THAT WOULD OBSTRUCT |
| | WATER DISTRIBUTION. |
| | (7) THE WATER SUPPLY DURATION FOR THE DESIGN AREA THAT |
| | INCLUDES THE WINDOW SPRINKLERS SHALL |
| | NOT BE LESS THAN THE REQUIRED RATING OF THE |
| | ASSEMBLYAPPLICATION OF A WINDOW SPRINKLER WHICH CAN BE |
| | USED PER NFPA 13 |
| | |
| | PLEASE REVIEW AND CORRECT |
| | |
| | |
| | |
| | 2) SHEET A0 -18 - THERE IS AN INDICATION OF COMMENT Z3 |
| | AREA OF REFUGE |
| | |
| | I AM NOT UNDERSTANDING THIS COMMENT OF WHAT IT |
| | REPRESENTED PURPOSE. |
| | |
| | FOR CLARIFICATION PURPOSES, WHAT IS THE CODE REFERNCE |
| | FOR THE REQUIERMENT? |
| | |
| | WHAT IS THE INTENT OF THE COMMENT/OCCUPANCY AND THIS |
| | PROPOSED AREA OF REFUGE? |
| | |
| | |
| | 3) SHEET SP-001 - THE FIRE SPRINKLE SYSTEM SHALL BE |
| | MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS |
| | |
| | ALL FIRE SPRINKLER WORK. INCLUDING DEMO, SHALL BE DONE |
| | UNDER SEPARATE PERMITS & SHOP DRAWINGS. |
| | |
| | PLEASE ENSURE COMPLIANCE AND PROVIDE A NOTE OF |
| | ACKNOWLEDGMENT TO THE SHEET. |
| | |
| | |
| | |
| | 4) SHEET SP-001 - THE FIRE ALARM SYSTEM SHALL BE |
| | MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS |
| | |
| | ALL FIRE ALARM WORK. INCLUDING DEMO, SHALL BE DONE |
| | UNDER SEPARATE PERMITS & SHOP DRAWINGS. |
| | |
| | PLEASE ENSURE COMPLIANCE AND PROVIDE A NOTE OF |
| | ACKNOWLEDGMENT TO THE SHEET. |
| | |
| | |
| | |
| | 5) ELECTICAL SHEETS INFORMATION - IF THERE IS ANY |
| | PROPOSED CARD READERS/ACCESS CONTROL ON ANY FLOOR IT |
| | SHALL BE INSTALLED UNDER SEPARATE PERMITS & SHOP |
| | DRAWINGS. |
| | |
| | IF APPLICABLE, PROVIDE A NOTE OF ACKNOWLEDEMENT. |
| | |
| | |
| | |
| | 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | 7) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |