| 2022-03-02 10:13:18 | 02/25/22 2ND PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. DONE. |
| | |
| | 2. DONE. |
| | |
| | 3. ON SHEET AT-05A; |
| | |
| | A. DONE. |
| | |
| | B. DONE. |
| | |
| | C. DONE. |
| | |
| | D. DONE. |
| | |
| | E. NOT DONE TO NEW LOCATION AS DESCRIBED DOES NOT MATCH |
| | YOU REQUEST OR YOUR RESPONSE. WOULD YOU PLEASE CORRECT |
| | PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | ON THAT SAME DRAWING FOR THE ACCESSIBLE WATER FOUNTAIN, |
| | IT SHOWS KNEE AND TOE CLEARANCES OF 2'-4" BUT NEEDS TO |
| | BE AT 2'-3". THE SPOUT HEIGHTS WOULD ALSO BE REQUIRED |
| | PER THE 2020 FBC ACC SEC. 306, 307, & 602.2, COMPLIANCE |
| | WITH 2020 FBC ACC SEC. 307.2 PROTRUSION LIMITS. WOULD |
| | YOU PLEASE SHOW THE WATER CLOSET FLUSH CONTROL LOCATION |
| | PER THE 2020 FBC SEC. 604.6 FLUSH CONTROLS? HANDICAP |
| | WATER CLOSET FLUSH CONTROL SHALL BE HAND OPERATED OR |
| | AUTOMATIC AND SHALL BE 36" INCHES MAXIMUM ABOVE THE |
| | FINISH FLOOR PER THE 2020 FBC ACC SEC. 604.9.5. |
| | |
| | 4. DONE. |
| | |
| | 5. ON SHEET A3-01; |
| | |
| | A. DONE. |
| | |
| | B. DONE. |
| | |
| | C. DONE. |
| | |
| | D. DONE. |
| | |
| | E. DONE. |
| | |
| | 6. ON SHEET A3-08; |
| | |
| | A. DONE. |
| | |
| | B. DONE. |
| | |
| | 7. DONE. |
| | |
| | 8. ON SHEET A8-01A; |
| | |
| | A. UNDER THE FAIR HOUSING DESIGN MANUAL, PLEASE LABEL |
| | THE TYPE OF UNIT FOR (A) OR (B) CONFIGURATION PER THE |
| | WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | NEW COMMENT, THE RESPOND IS NOTED BUT PLEASE LABEL AS |
| | SPECIFICATION B ON PLANS. |
| | |
| | B. DONE |
| | |
| | C. DONE. |
| | |
| | D. DONE, |
| | |
| | 9. ON SHEET A8-01A.1; |
| | |
| | A. DONE |
| | |
| | B. DONE |
| | |
| | C. DONE. |
| | |
| | D. ON GENERAL NOTES # 6 REFERS TO BATHROOM CABINETRY |
| | DETAILS, AND THE SHEET NUMBER IS UNAVAILABLE. ALSO, THE |
| | CABINET NEEDS TO BE 34" PER SPECIFICATION (B) PER THE |
| | FAIR HOUSING DESIGN MANUAL. WOULD YOU PLEASE CORRECT |
| | DETAIL 5 PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS? |
| | FOR THIS PAGE AND THE COMMENTS 10-14, PLEASE CORRECT ON |
| | THESE PAGES. WOULD YOU PLEASE CHANGE PER THE WPB |
| | AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS? |
| | |
| | 10. ON SHEETS A8-01B AND A8-01B.1, PLEASE REFER TO THE |
| | COMMENTS ABOVE. |
| | |
| | 11. ON SHEETS A8-01C AND A8-01C.1, PLEASE REFER TO THE |
| | COMMENTS ABOVE. |
| | |
| | 12. ON SHEETS A8-01D AND A8-01D.1, PLEASE REFER TO THE |
| | COMMENTS ABOVE. |
| | |
| | 13. ON SHEETS A8-01E AND A8-01E.1, PLEASE REFER TO THE |
| | COMMENTS ABOVE. |
| | |
| | 14. ON SHEETS A8-01F AND A8-01F.1, PLEASE REFER TO THE |
| | COMMENTS ABOVE. |
| | |
| | 15. ON SHEET A8-02A; |
| | |
| | A. UNDER THE FAIR HOUSING DESIGN MANUAL, PLEASE LABEL |
| | THE TYPE OF UNIT FOR (A) OR (B) CONFIGURATION PER THE |
| | WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | IN REFERENCE TO THE COMMENTS, PLEASE LABEL THE PAGE FOR |
| | SPECIFICATION B PER THE WPB AMENDMENTS TO THE FBC SEC. |
| | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | B. IT SHOWS TWO BATHROOMS THAT LOOK LIKE SPECIFICATION |
| | B, AND ONLY ONE NEEDS TO COMPLY WITH TYPE B. IF THIS IS |
| | WHAT WILL TAKE PRECEDENCE, PLEASE CHANGE. WOULD YOU |
| | PLEASE SHOW ONE AND LABEL IT PER THE WPB AMENDMENTS TO |
| | THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | NEW COMMENT, PLEASE NOTE ON THIS PAGE PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | C. ON GENERAL NOTES, # 6 REFERS TO BATHROOM CABINETRY |
| | DETAILS, AND THE SHEET NUMBER IS UNAVAILABLE. WOULD YOU |
| | PLEASE RESPOND TO THE REFERENCE # TO PAGE A8-18? WOULD |
| | YOU PLEASE CORRECT PER THE WPB AMENDMENTS TO THE FBC |
| | SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS? |
| | |
| | D. DONE |
| | |
| | E. DONE. |
| | |
| | F. DONE. |
| | |
| | 16. ON SHEET A8-02A.1; |
| | |
| | A. DONE. |
| | |
| | B. DONE. |
| | |
| | C. IT SHOWS ELEVATION FOR CABINET, AND IT SEEMS THAT |
| | THESE ARE B TYPE UNITS. WOULD YOU PLEASE SHOW THE 34" |
| | TO THE TOP OF THE CABINET FOR THE CORRESPONDING DETAIL? |
| | A REFERENCE TO ANOTHER PAGE WILL NOT CORRECT THE |
| | COMMENT. WOULD YOU PLEASE CORRECT THIS PAGE PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | D. ON GENERAL NOTES, # 6 REFERS TO BATHROOM CABINETRY |
| | DETAILS, AND THE SHEET NUMBER IS UNAVAILABLE. PLEASE |
| | PROVIDE THE RESPONSE THE REFERENCE # TO PAGE A8-18. |
| | WOULD YOU PLEASE CORRECT PER THE WPB AMENDMENTS TO THE |
| | FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS? |
| | |
| | 17. ON SHEETS A8-02B AND A8-02B.1, PLEASE REFER TO THE |
| | COMMENTS ABOVE. |
| | |
| | 18. ON SHEETS A8-02C AND A8-01C.1, PLEASE REFER TO THE |
| | COMMENTS ABOVE. |
| | |
| | 19. ON SHEETS A8-03A AND A8-03#A.1, PLEASE REFER TO THE |
| | COMMENTS ABOVE. |
| | |
| | 20. DONE. |
| | 21. ON SHEET A8-40; |
| | |
| | A. DONE. |
| | |
| | 22. ON SHEETS E1-08 AND E1-08 A, IT SHOWS AN OVERLAY |
| | OVER THE RESTROOM AND THE SINKS. WOULD YOU PLEASE |
| | CORRECT PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS? |
| | THE RESPONSE REFERS TO E3-02, AND IT IS STILL |
| | INCORRECT. WOULD YOU PLEASE CORRECT PER THE WPB |
| | AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS? |
| | |
| | 23. ON SHEET P0-00; |
| | |
| | A. DONE. |
| | |
| | B. DONE. |
| | |
| | C. DONE. |
| | |
| | 24. ON SHEET P0-01; |
| | |
| | A. DONE. |
| | |
| | B. DONE. |
| | |
| | C. DONE. |
| | |
| | D. DONE. |
| | |
| | E. DONE. |
| | |
| | F. DONE. |
| | |
| | H. DONE. |
| | |
| | 25. ON SHEET P0-02; |
| | |
| | A. WOULD YOU PLEASE SHOW AND LABEL ALL PIPE VENTED |
| | THROUGH THE ROOF FOR THIS PAGE PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | B. THERE ARE EXPANSION FITTING; PLEASE PROVIDE THE |
| | STANDARD FOR THE TYPE OF MATERIAL USED PER THE 2020 FBC |
| | TABLE 702.4 PIPE FITTINGS. WOULD YOU PLEASE PROVIDE THE |
| | MANUFACTURER'S INSTALLATION INSTRUCTIONS? A TEST TEE |
| | MAY BE REQUIRED ABOVE EACH FITTING IF AGREED FOR |
| | TESTING PURPOSES. WOULD YOU PLEASE SHOW ON ISOMETRIC? |
| | |
| | THE CHIEF PLUMBING INSPECTOR REVIEWED THIS ITEM, AND |
| | THIS IS HIS COMMENT. |
| | |
| | FOR WOOD FRAME CONSTRUCTION, YES. FOR CONCRETE/STEEL |
| | CONSTRUCTION, THEY WOULD NEED TO STATE THE NEED FOR IT. |
| | PER THESE MANUFACTURER?S INSTRUCTIONS, THIS PRODUCT IS |
| | ONLY REQUIRED FOR WOOD FRAME. THERE ARE SOME CASES |
| | WHERE IT IS NEEDED FOR CONCRETE/STEEL CONSTRUCTION, BUT |
| | THEY WOULD NEED TO STATE THE NEED AND USE OF THE |
| | PRODUCT SPECIFICALLY FOR EACH APPLICATION. TYPICALLY |
| | THEY CAN SHOW THAT THE MANUFACTURER OF THE PVC OR CPVC |
| | REQUIRES EXPANSION CONTROL. CPVC CAN ONLY RUN SO FAR IN |
| | A STRAIGHT LINE UNTIL IT GETS AN EXPANSION LOOP, BUT |
| | THAT IS FOR CPVC. (PER MANUFACTURER?S INSTRUCTIONS) |
| | |
| | 308.8 EXPANSION JOINT FITTINGS. EXPANSION JOINT |
| | FITTINGS SHALL BE USED ONLY WHERE NECESSARY TO PROVIDE |
| | FOR EXPANSION AND CONTRACTION OF THE PIPES. EXPANSION |
| | JOINT FITTINGS SHALL BE OF THE TYPICAL MATERIAL |
| | SUITABLE FOR USE WITH THE TYPE OF PIPING IN WHICH SUCH |
| | FITTINGS ARE INSTALLED. |
| | |
| | C. DONE. |
| | |
| | D. WOULD YOU PLEASE PROVIDE A CONDENSATE RISER AND SIZE |
| | IN ACCORDANCE WITH THE 2020 FBC SEC [M]314.2.2 DRAIN |
| | PIPE MATERIALS AND SIZES. PLEASE NOTE THAT IF |
| | CONDENSATE IS NOT VENTED THROUGH THE ROOF, IT CANNOT |
| | TERMINATE IN-WALL DUE TO CONDENSATE LINES THAT HAVE A |
| | P-TRAP AND ARE UNDER 2020 FBC M307.2.4 AND P1002.1. |
| | EACH TRAP SHALL BE VENTED TO PERMIT THE ADMISSION OR |
| | EMISSION OF AIR SO THAT THE SEAL OF ANY FIXTURE TRAP |
| | SHALL NOT BE SUBJECTED TO A PRESSURE DIFFERENTIAL OF |
| | MORE THAN 1 INCH OF WATER COLUMN PER THE 2020 FBC |
| | SECTION 901.2 TRAP SEAL PROTECTION. THEY CANNOT |
| | TERMINATE IN A WALL AS IT HAS NO NEGATIVE OR POSITIVE |
| | PRESSURE TO ALLOW IT TO HAVE A DIFFERENTIAL OF ONE-INCH |
| | WATER COLUMN. YOU MAY VENT IN THE A/C PLENUM, BUT IT |
| | HAS TO BE CPVC AS THE FLAME INDEX DOES NOT ALLOW PVC. |
| | WOULD YOU PLEASE PROVIDE DETAIL? |
| | |
| | IN REFERENCE TO THE RESPONSE, THE P TRAP MAY BE |
| | REQUIRED FOR THE PROTECTION AGAINST RODENTS INTO THE |
| | UNIT. |
| | |
| | F. DONE. |
| | |
| | G. DONE. |
| | |
| | 26. ON SHEET P1-00H; |
| | |
| | A. DONE. |
| | |
| | B. DONE. |
| | |
| | C. DONE. |
| | |
| | 27. ON SHEET P1-01A AND P1-01B, |
| | |
| | A. DONE WITH NEW COMMENT?WOULD YOU PLEASE SHOW THE |
| | FIRST FLOOR SANITARY AND ITS CORRESPONDING SANITARY |
| | RISER TO MATCH P0-02 PER THE WPB AMENDMENTS TO THE FBC |
| | SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | A NEW COMMENT WOULD YOU PLEASE PROVIDE THE PAGE FOR THE |
| | CIVIL DRAWING CONTINUATION PER THE WPB AMENDMENTS TO |
| | THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | B. DONE. |
| | |
| | C. DONE. |
| | |
| | D. DONE. |
| | |
| | E. THERE IS A 6" MANUAL FSP W/ FDV THAT MENTIONS F/1, |
| | AND I COULD NOT FIND A DETAIL. DOES THIS INCUR A FLOOR |
| | DRAIN, AND IF SO IT NEEDS TO BE CAST IRON AS IT IS IN |
| | THE FIRE-RATED STAIRWELL? |
| | |
| | NEW COMMENT, PLEASE NOTE ON PLANS PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | 28. ON SHEETS P1-02 A AND P1-02B, THE WATER RISERS NEED |
| | TO SHOW THE SHUT-OFF VALVES AND THEIR ACCESS PANEL |
| | OUTSIDE THE UNIT. WOULD YOU PLEASE PROVIDE PER THE WPB |
| | AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS? |
| | |
| | THE QUESTION IS THE VALVE IS OUT OF THE UNIT OR IN THE |
| | UNIT. IF IN THE UNIT WILL BE ACCESSIBLE BY MAINTENANCE, |
| | SHOW THE LOCATION AND ACCESS TO THEM. WOULD YOU PLEASE |
| | CLARIFY PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS? |
| | |
| | 29. DONE. |
| | |
| | 30. ON SHEET P1-09A AND P1-09B; |
| | |
| | A. DONE, |
| | |
| | B. DONE. |
| | |
| | C. DONE. |
| | |
| | D. DONE. |
| | |
| | E. DONE. |
| | |
| | 31. ON SHEET P3-01; |
| | |
| | A. DONE. |
| | |
| | B. HOT WATER LINES LOOPED FOR THE RECIRCULATING SYSTEM |
| | ARE NOT IN A CONTINUOUS LOOP; THEY ARE TEES IN MANY |
| | LOCATIONS. THERE IS A REQUIREMENT IN THE FLORIDA ENERGY |
| | CODE SEC. C404.6.1. THERE IS A TABLE THAT LIMITS THE |
| | DISTANCE BETWEEN THE SOURCE AND THE OUTLET; PLEASE |
| | REFER TO TABLE 404.5.1 FOR THE MAXIMUM ALLOWABLE PIPE |
| | LENGTH METHOD AND SIZE ACCORDANTLY. |
| | |
| | C. DONE. |
| | |
| | D. DONE. |
| | |
| | E. DONE. |
| | |
| | F. DONE WITH COMMENT?IT SEEMS THAT A JANITOR'S SINK IS |
| | REQUIRED, AND ONE IS NOT PRESENT FOR THE ASSEMBLY TYPE. |
| | WOULD YOU PLEASE PROVIDE ONE PER THE WPB AMENDMENTS TO |
| | THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | THE MOP SINK IS NOT DRAWN IN ON THE PLAN. WOULD YOU |
| | PLEASE CORRECT PER THE WPB AMENDMENTS TO THE FBC |
| | SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS? |
| | |
| | G. DONE. |
| | |
| | 32. ON SHEET P3-02; |
| | |
| | A. WOULD YOU PLEASE SHOW THE CLEAR FLOOR SPACE AS |
| | REQUESTED IN THE ARCHITECTURAL COMMENTS. |
| | |
| | B. WOULD YOU PLEASE SHOW THE CLEAR FLOOR SPACE OF 30" X |
| | 48" IN THE LAVS OF THE AMENITY WOMEN'S AND MEN'S PER |
| | THE 2020 FBC SEC. ACC 305.3. |
| | |
| | C. DETAIL TWO; WOULD YOU PLEASE SHOW THE CLEAR FLOOR |
| | SPACE OF 30" X 48" IN THE LAVS OF THE AMENITY WOMEN'S |
| | AND MEN'S PER THE 2020 FBC SEC. ACC 305.3. |
| | |
| | NEW COMMENTS; WOULD YOU PLEASE SHOW THE FOLLOWING |
| | COMMENTS OR PUT A NOTE ON THIS PAGE TO REFERENCE A3-20 |
| | PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 33. DONE. |
| | |
| | 34. DONE. |
| | |
| | PLEASE FEEL FREE TO SET UP A MEETING OR CONTACT ME ON |
| | ANY OF THE COMMENTS BY PHONE OR ZOOM MEETING IF YOU |
| | LIKE TO PREVENT FURTHER REVIEWS. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | WEST PALM BEACH AMENDMENTS 2017 FBC CHAPTER; UPON |
| | REQUEST. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |