| Date |
Text |
| 2022-01-25 07:06:06 | PLAN |
| | REVIEW COMMENTS |
| | 2ND REVIEW: FBC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) SUBMIT PRODUCT APPROVALS FOR THE STOREFRONT, |
| | STOREFRONT WINDOWS AND THE STOREFRONT DOOR. FBC 107.3.4 |
| | - PROVIDE TWO SETS OF PRODUCT APPROVALS FOR THOSE |
| | PRODUCTS WHICH ARE REGULATED BY FAC 61G20-3.001 PER |
| | FLORIDA STATUTE 553.842 (5) THAT HAVE BEEN REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD. PROVIDE |
| | TWO COMPLETE PRODUCT APPROVALS WITH FL OR NOA NUMBERS |
| | INCLUDING INSTALLATION INSTRUCTIONS AND MAXIMUM DESIGN |
| | PRESSURES FOR EACH OF THE DIFFERENT ROOFING MATERIALS, |
| | WINDOW (GLASS TYPES), STRUCTURAL MULLIONS AND EXTERIOR |
| | DOOR TYPES. ONLY ONE SET IS REQUIRED TO BE UPLOADED FOR |
| | ELECTRONICALLY SUBMITTED DOCUMENTS. |
| | |
| | 2) IF THE STOREFRONT GLAZING IS NOT IMPACT RATED SUBMIT |
| | THE PRODUCT SPPROVALS AND INSTALLATION INSTRUCTIONS FOR |
| | THE IMPACT PROTECTION DEVICES. FBC 1609.1.2 |
| | |
| | 3) SUBMIT PRODUCT APPROVALS FOR THE ROLL UP DOOR. FBC |
| | 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS FOR |
| | THOSE PRODUCTS WHICH ARE REGULATED BY FAC 61G20-3.001 |
| | PER FLORIDA STATUTE 553.842 (5) THAT HAVE BEEN REVIEWED |
| | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| | |
| | 4) [ DUE TO THE OPENING MODIFICATION AND STOREFRONT |
| | DOORS AND WINDOWS BEING INSTALLED WITHOUT PERMITS, THE |
| | COST OF ALL OF THE MATERIALS, LABOR, OVERHEAD AND |
| | PROFIT FOR THIS PROJECT IS REQUIRED FOR THE VALUATION |
| | AMOUNT.] THE VALUATION STATED ON THE PERMIT APPLICATION |
| | OF $2300.00 IS TOO LOW FOR THIS PROJECT. THE COSTS OF |
| | ALL MATERIALS, LABOR, ENGINEERING FEES, OVERHEAD AND |
| | PROFIT NEED TO BE INCLUDED IN THE VALUATION. BUILDING |
| | PERMIT VALUATION. FOR PERMITTING PURPOSES, VALUATION OF |
| | FBC 109.3 BUILDINGS AND SYSTEMS SHALL BE TOTAL |
| | REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC, |
| | PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE |
| | WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 5) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH |
| | OF THE REVIEW COMMENTS HAS BEEN ADDRESSED. |
| | |
| | |
| | |
| | |
| | |