| Date |
Text |
| 2021-12-21 17:07:36 | 1. PLEASE PROVIDE A COMPLETE SITE PLAN INDICATING THE |
| | MINIMUM SETBACKS, SIDEWALK WIDTH, PLANNING AREAS, TREE |
| | LOCATIONS, BIKE RACKS AND BENCHES. |
| | 2. PLEASE EXPLAIN THE DIFFERENCE IN GBA BETWEEN THE |
| | APPROVED 424,004 SF IN THE SITE PLAN DOCUMENTS AND THE |
| | 368,240 SF LISTED IN THE BUILDING PERMIT SET. |
| | 3. PLEASE ADJUST THE SETBACK TABLE IN SHEET A0-002 AS |
| | IT LISTS A SIDE SETBACK OF 157?. |
| | 4. FULLY ENCLOSED STORAGE ON THE GROUND FLOOR COUNTS AS |
| | PART OF THE GBA. |
| | 5. PLEASE EXPLAIN THE PUBLIC OPEN SPACE DIAGRAM IN |
| | SHEET A0-005. IT DOES NOT MATCH APPROVED SITE PLAN. |
| | 6. PLEASE PROVIDE A FA?ADE DIAGRAM TO CONFIRM |
| | COMPLIANCE WITH TRANSPARENCY REQUIREMENT AS MEASURED |
| | ACCORDING TO SEC 94-109 OF THE ZLDRS. |
| | 7. A TURN AROUND SPACE SHALL BE PROVIDED FOR THE GROUND |
| | FLOOR DEAD END PARKING. |
| | 8. PARKING STALLS WITH A COLUMN OR WALL LOCATED NEXT TO |
| | DOOR OPENING AREA SHALL BE WIDENED BY 1 FOOT. |
| | 9. ALL MECHANICAL EQUIPMENT ON ROOF SHALL BE |
| | CONSOLIDATED/GROUP AS MUCH AS POSSIBLE AND SCREENED |
| | WITH A SCREEN AS TALL AS THE EQUIPMENT MAKING IT AN |
| | INTEGRAL PART OF THE OVERALL BUILDING DESIGN. |
| | 10. SOUTH ELEVATION DOES NOT SEEM TO MATCH APPROVED |
| | SITE PLAN ELEVATION WITHIN THE PARKING GARAGE AREA. |
| | PLEASE ADJUST. |
| | 11. PLEASE EXPLAIN THE REASON WHY THE TOP LEVEL OF THE |
| | PARKING GARAGE IS NOW A 12? FINISHED FLOOR TO FINISHED |
| | FLOOR. AMENITY DECK HEIGHT WAS REDUCED FROM 14? TO 12? |
| | AND THAT SEEMS TO AFFECT THE PROPORTIONS AND SEPARATION |
| | OF BASE AND TOWER. |
| | 12. GROUND FLOOR WINDOW OF SOUTH END RESIDENTIAL UNIT |
| | HAS BEEN CHANGED FROM APPROVED. PLEASE ADJUST. |
| | 13. SITE PLAN APPROVAL INCLUDED AN EYE BROS-CANOPY |
| | TURNING THE CORNER FROM NORTH FA?ADE TO EAST AT THE |
| | RETAIL LEVEL. PLEASE JUSTIFY WHY IT WAS REMOVED. |
| | 14. LOADING ENTRANCE ALONG CLEARWATER DRIVE SHALL |
| | INCLUDE AN OPAQUE DECORATIVE GATE. |
| | 15. LANDSCAPE DRAWINGS SHALL BE REMOVED FROM THIS |
| | PERMIT AND SUBMITTED UNDER A SEPARATE LANDSCAPE PERMIT. |
| | 16. PLEASE INDICATE THE LOCATION OF THE MICROMOBILITY |
| | STATION. |
| | 17. SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS |
| | DRIVEWAY. PLEASE PROVIDE SECTIONS OR DETAILS TO CONFIRM |
| | COMPLIANCE. |
| | 18. PLEASE PROVIDE CROSS SECTION OF THE SIDEWALK LEVEL |
| | TO CONFIRM GRADES ARE MET. |
| | 19. PLEASE PROVIDE OPEN SPACE DIAGRAM TO MATCH APPROVED |
| | SITE PLAN. |
| | 20. PLEASE PROVIDE PHOTOMETRICS FOR THE GROUND FLOOR |
| | PUBLIC REALM AND CONFIRM COMPLIANCE WITH THE REQUIRED |
| | CITY STANDARD LIGHT FIXTURE. |
| | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| | APONTE AT 561-822-1439 |
| | |