| Date |
Text |
| 2021-11-24 15:54:37 | NEW COMMERCIAL BUILDING |
| | |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) PLEASE SHOW THE TERMITE PROTECTION REQUIREMENT PER |
| | FBC 1816 |
| | |
| | 2) PLEASE PROVIDE A SITE PLAN SHOWING THE FOLLOWING |
| | INFORMATION 107.2.5 SITE PLAN. THE CONSTRUCTION |
| | DOCUMENTS SUBMITTED WITH THE APPLICATION FOR PERMIT |
| | SHALL BE ACCOMPANIED BY A SITE PLAN SHOWING TO SCALE |
| | THE SIZE AND LOCATION OF NEW CONSTRUCTION AND EXISTING |
| | STRUCTURES ON THE SITE, DISTANCES FROM LOT LINES, THE |
| | ESTABLISHED STREET GRADES AND THE PROPOSED FINISHED |
| | GRADES, DEPICTING THE PROPOSED LOT DRAINAGE AND, AS |
| | APPLICABLE, FLOOD HAZARD AREAS, FLOODWAYS, AND DESIGN |
| | FLOOD ELEVATIONS; AND IT SHALL BE DRAWN IN ACCORDANCE |
| | WITH AN ACCURATE AND INCLUDED ON A BOUNDARY LINE |
| | SURVEY. (PLEASE PROVIDE CUT SECTIONS FOR ANY PROPOSED |
| | WATER RETAINING SWALES) |
| | |
| | 3) PLEASE PROVIDE A SURVEY. |
| | |
| | 4) PLEASE PROVIDE A SOIL REPORT (GEOTECHNICAL REPORT) |
| | AS LISTED ON THE DRAWINGS. |
| | |
| | 5) PLEASE PROVIDE THE EIFS DETAILS OR THE PRODUCT |
| | APPROVAL FOR THE EIFS EXTERIOR WALL SYSTEM. |
| | |
| | 6) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE |
| | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVAL FOR THE EXTERIOR DOORS, WINDOWS, |
| | LOUVERS, ROOFING SYSTEMS, EXTERIOR WALL CLADDING, ETC. |
| | - ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED |
| | APPROVED BY THE BUILDING DESIGNER OF RECORD FBC WPB |
| | 107.3.4 |
| | |
| | 7) DRAWING A650 - PLEASE SHOW THE DOOR MANEUVERING |
| | CLEARANCE (18' BESIDE THE LATCH SIDE OF THE DOOR) TO |
| | EXIT THE FAMILY RESTROOM (107) FBC ACCESSIBILITY |
| | 404.2.4 |
| | |
| | 8) ACCESSIBLE RESTROOMS - THE 18' VERTICAL GRAB BAR |
| | BESIDE THE TOILET IS NOT REQUIRED PER THE FBC |
| | ACCESSIBILITY - PLEASE SHOW THE 12' CLEARANCE ABOVE THE |
| | HORIZONTAL GRAB BAR PER FBC ACCESSIBILITY 609.3 THE |
| | SPACE BETWEEN THE GRAB BAR AND PROJECTING OBJECTS ABOVE |
| | SHALL BE 12 INCHES (305 MM) MINIMUM. |
| | |
| | 9) A RESIDENT/SPECIAL INSPECTOR IS REQUIRED FOR THE |
| | TILT WALLS AND STEEL JOIST, STEEL COLUMNS INSPECTIONS - |
| | PLEASE READ AND FILL OUT THE REQUIRED DOCUMENTS PER THE |
| | "GUIDELINES AND POLICIES FOR PROJECTS CONCERNING |
| | THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS". |
| | YOU CAN E MAIL ME AND ASK FOR A COPY. |
| | |
| | 10) PLEASE SHOW STORAGE RACKS ATTACHMENT TO THE |
| | FOUNDATION AND COMPLIANCE WITH FBC 2209.1 STORAGE |
| | RACKS. |
| | THE DESIGN, TESTING AND UTILIZATION OF STORAGE RACKS |
| | MADE OF COLD-FORMED OR HOT-ROLLED STEEL STRUCTURAL |
| | MEMBERS SHALL BE IN ACCORDANCE WITH RMI/ANSI MH 16.1. |
| | WHERE REQUIRED BY ASCE 7, THE SEISMIC DESIGN OF STORAGE |
| | RACKS SHALL BE IN ACCORDANCE WITH SECTION 15.5.3 OF |
| | ASCE 7. |
| | |
| | 11) ALL WOOD ROOF AND WALL SHEATHING SHOULD BE SHOWN AS |
| | FIRE RETARDANT PER FBC 603.1 |
| | |
| | 12) DEFERRED SUBMITTALS WILL NEED TO BE LISTED ON THE |
| | DRAWINGS. FBC WPB 107.3.4.1 DEFERRED SUBMITTALS. FOR |
| | THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE |
| | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| | SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE |
| | TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |