| 2021-12-09 15:03:55 | NEW BUILDING |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | 1) PLEASE PROVIDE A SOIL REPORT (GEOTECHNICAL REPORT). |
| | |
| | 2) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE |
| | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS, EXTERIOR |
| | DOORS, EXTERIOR GLASS BLOCKS, ROOFING SYSTEMS, ETC. - |
| | ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED |
| | APPROVED BY THE BUILDING DESIGNER OF RECORD FBC 107.3.4 |
| | |
| | 3) ACCESSIBLE RESTROOMS - PLEASE STATE THAT THE MIRROR |
| | DIMENSIONS ARE FROM THE FINISHED FLOOR TO THE |
| | "REFLECTIVE SURFACE" FBC A 603.3 MIRRORS. |
| | MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS SHALL |
| | BE INSTALLED WITH THE BOTTOM EDGE OF THE REFLECTING |
| | SURFACE 40 INCHES (1015 MM) MAXIMUM ABOVE THE FINISH |
| | FLOOR OR GROUND. |
| | |
| | 4) DRAWING A-5.20 DETAIL NUMBER 8 STAIR SECTION - |
| | PLEASE SHOW THE BOTTOM STAIR HANDRAIL EXTENSION TO |
| | SLOPE DOWN PER FBC 1014.6 HANDRAIL EXTENSIONS. |
| | HANDRAILS SHALL RETURN TO A WALL, GUARD OR THE WALKING |
| | SURFACE OR SHALL BE CONTINUOUS TO THE HANDRAIL OF AN |
| | ADJACENT FLIGHT OF STAIRS OR RAMP RUN. WHERE HANDRAILS |
| | ARE NOT CONTINUOUS BETWEEN FLIGHTS, THE HANDRAILS SHALL |
| | EXTEND HORIZONTALLY NOT LESS THAN 12 INCHES (305 MM) |
| | BEYOND THE TOP RISER AND CONTINUE TO SLOPE FOR THE |
| | DEPTH OF ONE TREAD BEYOND THE BOTTOM RISER. |
| | |
| | 5) PLEASE SHOW HAND RAILS TO RETURN TO A WALL, GUARD OR |
| | THE WALKING SURFACE - FBC 1014.6 |
| | |
| | 6) SEPARATE PERMITS ARE REQUIRED FOR THE EXISTING |
| | BUILDING ADDITIONS (EXISTING BUILDING IS A SEPARATE |
| | BUILDING), EXTERIOR SIGNS, SITE LIGHTING, SIDE WALKS - |
| | PLEASE ACKNOWLEDGE THIS. |
| | |
| | 7) ROOFING SYSTEMS, WINDOW AND DOOR PRODUCT APPROVALS, |
| | ETC. - MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS TO |
| | BE DEFERRED ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 |
| | DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| | DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| | THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED |
| | SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| | REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL |
| | WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |
| | |
| | 8) PLEASE PROVIDE A SURVEY. |
| | |