| 2021-10-23 12:14:54 | 3RD REVIEW FBC-2020 GAS |
| | PERMIT-21090829 |
| | 10/23/2021 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC P- FLORIDA PLUMBING CODE SEVENTH EDITION 2020 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE SEVENTH EDITION |
| | 2020 |
| | FBC FG- FLORIDA FUEL GAS CODE SEVENTH EDITION 2020 |
| | FBC B- FLORIDA BUILDING CODE SEVENTH EDITION 2020 |
| | FBC M- FLORIDA MECHANICAL CODE SEVENTH EDITION 2020 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SEVENTH |
| | EDITION 2020 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SEVENTH EDITION |
| | 2020 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SEVENTH |
| | EDITION 2020 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1. THE ENGINEER WHO PREPARED THE TANK TIE-DOWN DETAILS |
| | SHALL PROVIDE AN ELECTRONIC SIGNATURE AND SEAL THE |
| | DOCUMENT- FL. STATUTE 471.025 & FLORIDA ADMINISTRATIVE |
| | CODE SEC. 61G15-23.005. THE ONE SUBMITTED IT BELONGS TO |
| | ENGPLANS LLC, AND IT CLEARLY SAYS IT SHALL NOT BE |
| | REPRODUCED IN A HOLE OR PART. THE COPY OF THE TIE-DOWN |
| | IS NOT ACCEPTABLE. VISIT |
| | HTTPS://WWW.ENGINEERINGEXPRESS.COM/ THEY MAY BE ABLE TO |
| | PROVIDE THIS DOCUMENT. |
| | |
| | 2. CLEARLY INDICATE ON THE SURVEY IF THE SHELL FOR THE |
| | TANK IS 18 IN. BELOW GRADE HOW FAR FROM THE DRIVEWAY |
| | PER THE NFPA 58 SECTION 6.8.6.1? |
| | |
| | 3. THERE IS A GRILL ON THE LP SYSTEM DOWN STREAM OF THE |
| | GENERATOR AND NOT IN THE CALCULATION OR SHOWN ON THE |
| | ISOMETRIC WOULD YOU PLEASE CORRECT BY ADDING IT WITH |
| | THE BTU'S AND THE LOCATION PER THE WPB AMENDMENTS TO |
| | THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | 4. WOULD YOU PLEASE PROVIDE HOW LP TANK IS TIE-DOWN AND |
| | WHAT METHOD, IF YOU ARE USING STRAPS OR CABLE, IF CABLE |
| | HOW IS IT PROTECTED FOR THE LP TANK AND APPURTENANCES |
| | PER NFPA 58, BELOW GROUND IT SHALL BE ANCHORED PER NFPA |
| | 58 SEC.3-2.2.7 (H). SHOW THE DEPTH OF THE LP GAS |
| | CONTAINER BELOW GRADE TO COMPLY WITH NFPA 58 SEC. |
| | 6.6.6.1. |
| | MAY VISIT HTTPS://WWW.ENGINEERINGEXPRESS.COM/ THEY MAY |
| | BE ABLE TO PROVIDE THIS DOCUMENT. |
| | |
| | 5. WOULD YOU PLEASE PROVIDE A GAS RISER DIAGRAM PER THE |
| | WPB AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) |
| | RESIDENTIAL GAS. |
| | |
| | 6. SHOW AND LABEL TANK, REGULATORS, UNIONS, SHUT-OFF |
| | VALVES, THE PIPE USED, DISTANCE, LINE SIZE, AND |
| | PRESSURE. |
| | |
| | 7. SUBMIT MANUFACTURES SPECIFICATIONS FOR THE GRILL AND |
| | GENERATOR PER THE 2020 FBC RES. SEC.G2408.1. |
| | |
| | 8. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. 2017 FBC FUEL GAS SEC.410.1 OR 2017 FBC |
| | FUEL GAS RES. SEC. G2421.1. |
| | |
| | 9. THE GENERATOR SHALL BE ONE FOOT SIX INCHES (1?-6?) |
| | FROM THE HOUSE, FIVE (5?-0?) FROM THE PROPERTY LINE, |
| | EXHAUST SHALL BE TEN (10?-0?) FROM ANY OPENING UNLESS |
| | OTHERWISE STATED IN THE MANUFACTURES SPECIFICATION |
| | INSTRUCTIONS. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | ATELYO BELISLE |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6695 |
| | |
| | |
| | |