| 2021-10-21 08:09:24 | 10/21/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. ON SHEET A1.0 |
| | |
| | A. IN THE BREAK ROOM 111 AND THE GALLERY AREA 115 SHOWS |
| | A SINK, WOULD YOU PLEASE GIVE THE DIMESONS 30 INCHES BY |
| | 48 INCHES PER THE 2020 FBC ACC SEC. 305 CLEAR FLOOR OR |
| | GROUND SPACE. |
| | |
| | B. THERE IS AN ELEVATION OF THE BREAK ROOM 110 A-1, BUT |
| | THE ELEVATION SHOWS THE COUNTER TO AT THREE FEET INCHES |
| | MAXIMUM AND IT NEEDS TO BE AT 2 FEET 10 INCHES PER THE |
| | 2020 FBC ACC SEC. 606.3. |
| | |
| | C. THE SINK IN THE GALLERY SHOWS A CLEAR FLOOR SPACE |
| | BUT NO DETAIL FOR THE COUNTER HEIGHT; THIS SHOULD BE AT |
| | 34 INCHES MAXIMUM PER THE 2020 FBC ACC SEC. 606.3. |
| | WOULD YOU PLEASE PROVIDE DETAIL ON THIS PAGE OR GIVE A |
| | REFERENCE PER THE WPB AMENDMENTS TO THE FBC SEC. |
| | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | D. THERE IS A SAUNA IN ROOM 110, AND MECHANICAL IS |
| | REQUESTING MANUFACTURERS SPECIFICATION. PLEASE PROVIDE |
| | INFORMATION IF IT IS A STEAM UNIT AND NEEDS HOT WATER |
| | OR A DRAIN PER THE WPB AMENDMENTS TO THE FBC SEC |
| | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | |
| | 2. ON SHEET P01; |
| | |
| | A. IT SHOWS SANITARY ON THE FLOOR. WOULD YOU PLEASE |
| | SUBMIT A SLAB REPAIR DETAIL FOR REVIEW? SHOW THE WIDTH |
| | OF THE REPAIR, THE MINIMUM THICKNESS OF THE CONCRETE TO |
| | BE REPLACED, AND THE PSI OF THE CONCRETE. SHOW THE SIZE |
| | AND LENGTH OF THE DOWELS, THE MINIMUM EMBEDMENT DEPTH |
| | INTO THE EXISTING SLAB, AND THE SPACING OF THE DOWELS |
| | IN THE CENTER. THE REPAIR MAY ALSO INCLUDE TERMITE |
| | TREATMENT OF THE SOIL AND THE REQUIRED VAPOR BARRIER |
| | OVER THE EARTH. A COPY OF THE TERMITE CERTIFICATE SHALL |
| | BE ONSITE FOR A FINAL INSPECTION IF APPLICABLE. |
| | |
| | B. IT SHOWS A WASHING MACHINE THAT WILL REQUIRE A LINT |
| | TRAP; PLEASE SUPPLY DETAILS OR NOTES PER THE 2020 FBC |
| | SEC. 1003.6. A MODEL HLT-1176 IS USED A LOT IN OUR |
| | MUNICIPALITY, AND YOU ARE WELCOME TO USE THIS ONE OR |
| | ONE SIMILAR. HTTPS://STRIEMCO.COM/WP-CONTENT/UPLOADS/20 |
| | 20/03/6010-6025-001-01-HLT-HLB.PDF . |
| | |
| | C. THE SERVICE SINK (MOP SINK) SURROUNDING THE WALL |
| | SHALL BE A NON-ABSORBENT SURFACE IN ACCORDANCE WITH THE |
| | 2020 FBC BUILDING SEC. 1210.2.2 AND 2020 FBC SEC. P |
| | 310.3. WOULD YOU PLEASE MAKE A NOTE ON THIS SHEET? |
| | |
| | 3. ON SHEET P02; |
| | |
| | A. WOULD YOU PLEASE SHOW THE COLD WATER FOR THE |
| | RESTROOMS AND THE WATER FOUNTAIN PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. IF COLD WATER EXISTS, PLEASE SHOW AND LABEL |
| | IT. |
| | |
| | B. WOULD YOU PLEASE SHOW THE HAMMER ARRESTORS ON THE |
| | WASHING MACHINE PER THE 2020 FBC P 604.9. |
| | |
| | C. WOULD YOU PLEASE PUT A NOTE NEXT TO THE WATER HEATER |
| | FOR DETAIL ON SHEET P-4 PER THE WPB AMENDMENTS TO THE |
| | FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | D. THERE ARE HOT WATER LINES IN THE GROUND AND NOT IN |
| | CONDITION SPACE, SO THEY NEED TO BE INSULATED WITH A |
| | MINIMUM R-3 PER THE 2020 FBC SEC. RE 403.5.3. |
| | |
| | E. THE WATER LINES TO THE SINK IN THE GALLERY FOR THE |
| | RECIRCULATING MANIFOLD OF THE HOT WATER LINES SHALL BE |
| | SUPPLIED TO THE SOURCE; PLEASE REFER TO THE 2020 FBC |
| | ENERGY CODE TABLE C404.5.1. MAXIMUM ALLOWABLE PIPE |
| | LENGTH METHOD. |
| | |
| | F. RECIRCULATING SYSTEM, THE PIPING SHALL BE INSULATED |
| | IN ITS ENTIRETY, INCLUDING THE SUPPLY AND RETURN PIPING |
| | OF A CIRCULATING WITH A MIN 1-INCH-THICK PER C404.4 (A) |
| | INSULATION OF PIPING. |
| | |
| | G. ON A GENERAL NOTE, # 3 REFERS TO MIAMI DADE. WOULD |
| | YOU PLEASE DELETE PER THE WPB AMENDMENTS TO THE FBC |
| | SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS? |
| | |
| | H. WOULD YOU, PLEASE SHOW THE SOURCE LOCATION OF THE |
| | WATER SERVICE WITH A FULL OPEN VALVE AND A BACKFLOW |
| | DEVICE INTO THE BUILDING AS REQUIRED PER THE 2020 FBC |
| | SEC. 606.1 (2) LOCATION OF FULL-OPEN VALVES AND 608.1 |
| | GENERAL. |
| | |
| | 4. ON SHEET P04; |
| | |
| | A. FOR DETAIL P13, WOULD YOU PLEASE SHOW THE RELIEF |
| | LINE DUMPING NOT MORE THAN 6 INCHES ABOVE AND NOT LESS |
| | THAN TWO TIMES THE DISCHARGE PIPE DIAMETER ABOVE THE |
| | FLOOR OR FLOOD LEVEL RIM OF THE WASTE RECEPTOR OR INTO |
| | THE DRAIN PAN SERVING TANK PER THE 2020 FBC SEC P |
| | 504.6. |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |