| Date |
Text |
| 2022-02-03 10:22:27 | PLAN |
| | REVIEW COMMENTS |
| | 4400 BEACON CIRCLE |
| | 2 STORY OFFICE BUILDING |
| | BUSINESS OCCUPANCY |
| | TYPE II-B CONSTRUCTION, SPRINKLERED |
| | FLOOD ZONE: X |
| | 21,081 GROSS SQ-FT |
| | GROUND FLOOR ELEVATION: 16.0' NAVD88 |
| | |
| | 2ND REVIEW: FBC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) RESOLVED. |
| | |
| | 2) RESOLVED. |
| | |
| | 3) [NOT RESOLVED.] SUBMIT A PLAN FOR SAFEGUARDS DURING |
| | CONSTRUCTION AND MOT. FBC CHAPTER 33 |
| | |
| | 4) RESOLVED. |
| | |
| | 5) RESOLVED. |
| | |
| | 6) RESOLVED. |
| | |
| | 7) RESOLVED. |
| | |
| | 8) RESOLVED. |
| | |
| | 9) RESOLVED. |
| | |
| | 10) RESOLVED. |
| | |
| | 11) RESOLVED. |
| | |
| | 12) [DEFERRED.] ON SHEET G003, THERE IS A HEADING |
| | "PROVISO DEFERRED SUBMITTAL". AMONG THE ITEMS THAT ARE |
| | LISTED FOR DEFERRED SUBMITTAL ARE PRODUCTS REGULATED BY |
| | DBPR RULE 9N-03, WHICH INCLUDES EXTERIOR DOORS, |
| | WINDOWS, STOREFRONTS, MULLIONS, WALL LOUVERS, ROOFING |
| | MATERIALS, ETC. IF YOU WISH TO DEFER THESE ITEMS IT IS |
| | NOT REQUIRED THAT YOU SUBMIT THEM PRIOR TO RECEIVING |
| | THE PERMIT. THEY DO HAVE TO BE SUBMITTED AND APPROVED |
| | BEFORE THEY ARE INSTALLED. FBC AMENDMENTS 107.3.4.1 |
| | DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| | DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| | THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | 13) [DEFERRED.] THE PRODUCT APPROVALS THAT WERE |
| | SUBMITTED HAVE NOT BEEN REVIEWED AND APPROVED IN |
| | WRITING BY THE DESIGNER OF RECORD FOR THIS PROJECT. FBC |
| | AMENDMENTS 107.3.4 |
| | |
| | 14) [DEFERRED.] THE PRODUCT APPROVALS FOR THE ROOFING |
| | AND PV RACKS ONLY HAVE THE COVERSHEETS. THE EVALUATION |
| | REPORT AND INSTALLATION INSTRUCTIONS WITH THE DESIGN |
| | PRESSURES ARE MISSING. THE SPECIFIC ROOF COVERING |
| | ASSEMBLIES AND THE DESIGN PRESSURES ARE REQUIRED TO BE |
| | CIRCLED OR HI-LITED IN THE PRODUCT APPROVAL. ENHANCED |
| | FASTENING CALCULATIONS MAY BE REQUIRED. FBC AMENDMENTS |
| | 107.2.1 |
| | |
| | 15) [DEFERRED.] FOR ALL OF THE PRODUCT APPROVALS, |
| | SPECIFY ( HI-LITE OR CIRCLE) THE SPECIFIC ITEMS AND |
| | THEIR MAXIMUM DESIGN PRESSURES IN THE APPROVALS. FBC |
| | AMENDMENTS 107.2.1 |
| | |
| | 16) [DEFERRED.] SUBMIT PRODUCT APPROVALS OR SITE |
| | SPECIFIC ENGINEERING FOR THE PRE-FAB METAL CANOPY SHOWN |
| | IN DETAIL #3 ON SHEET A605. FBC AMENDMENTS 107.3.4 |
| | |
| | 17) THE VALUATION FOR THIS PROJECT HAS BEEN INCREASED |
| | FROM $3,800,000.00 TO $4,498,264.00 BASED ON THE |
| | CURRENT ICC VALUATION DATA. 21,081 SQFT X $213.38 = |
| | $4,498,263.78. FBC AMENDMENTS 109.3 |
| | |
| | DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE LIST ON |
| | PLAN SHEET G003 (MAY NOT BE A COMPLETE LIST); DOCUMENTS |
| | SHOWING COMPLIANCE INCLUDING SHOP DAWINGS ARE TO BE |
| | REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | (ARCHITECT OR ENGINEER FOR PRODUCT APPROVALS AND OTHER |
| | SPECIFICATION DOCUMENTS, STRUCTURAL ENGINEER OF RECORD |
| | APPROVAL AND REVIEW IS REQUIRED FOR DELEGATED |
| | ENGINEERING). SUBMITTAL, REVIEW AND APPROVAL ARE |
| | REQUIRED PRIOR TO INSTALLATION. |
| | |
| | COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY |
| | DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING |
| | DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION. |
| | CONFIRM COMPLIANCE WITH PRESSURES SHOWN ON SHEET S010 |
| | PRIOR TO SUBMITTAL. IF PRODUCT APPROVAL OFFERS OPTIONS, |
| | INDICATE OPTION PROPOSED, ESPECIALLY IF NOT ALL OPTIONS |
| | COMPLY WITH MINIMUM DESIGN PRESSURES. |
| | |
| | SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE |
| | REQUIRED FOR: |
| | LIGHT POLES/SITE LIGHTING |
| | FIRE ALARM |
| | FIRE SPRINKLER |
| | LOW VOLTAGE |
| | ACCESS |
| | LANDSCAPING |
| | IRRIGATION |
| | PARKING LOT |
| | SWIMMING POOLS AND SPAS |
| | GENERATORS |
| | BDA SYSTEMS |
| | ALL OTHER ITEMS OTHER THAN BMEP |
| | |
| | CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM |
| | SAT-SUN |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |