| Date |
Text |
| 2021-08-25 11:00:57 | 08/25/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. ON SHEET S-1 WOULD YOU PLEASE PROVIDE SLAB REPAIR |
| | DETAIL FOR REVIEW. SHOW THE WIDTH OF THE REPAIR, THE |
| | MINIMUM THICKNESS OF THE CONCRETE TO BE REPLACED, AND |
| | THE PSI OF THE CONCRETE. SHOW THE SIZE AND LENGTH OF |
| | THE DOWELS, THE MINIMUM EMBEDMENT DEPTH INTO THE |
| | EXISTING SLAB, AND THE SPACING OF THE DOWELS IN THE |
| | CENTER. THE REPAIR SHALL ALSO INCLUDE TERMITE TREATMENT |
| | OF THE SOIL AND THE REQUIRED VAPOR BARRIER OVER THE |
| | SOIL. A COPY OF THE TERMITE CERTIFICATE SHALL BE ONSITE |
| | FOR A FINAL INSPECTION. |
| | |
| | 2. ON SHEET P-1; |
| | A. THE WASHING MACHINE SHUT OFF VALVES SHALL BE |
| | ACCESSIBLE WITHOUT MOVING OF THE UNITS AND WITHIN REACH |
| | PER THE 2020 FBC SEC. R 2903.9.3. |
| | |
| | B. HOT WATER LINES UNDERGROUND NOT IN CONDITION SPACE |
| | NEED TO BE INSULATED WITH A MINIMUM R-3 PER THE 2020 |
| | FBC SEC. RE 403.5.3. |
| | |
| | C. THE WASHING MACHINE SHUT OFF VALVES SHALL BE |
| | ACCESSIBLE WITHOUT MOVING OF THE UNITS AND WITHIN REACH |
| | PER THE 2020 FBC SEC. R 2903.9.3. |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION, |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |