| 2022-01-24 11:51:23 | 1. PLEASE CHECK CONFLICT WITH STORM LINE TO REMAIN |
| | ALONG LAKEVIEW AVENUE AND THE PROPOSED STREET TREES |
| | (SHEET C-200) |
| | 2. PLEASE CHECK CONDLICT WITH STORM LINE ON SOUTH SIDE |
| | OF CHURCH AND THE PROPOSED TREES (SHEET C-400) |
| | 3. PLEASE PROVIDE AN OUTLINE OF EXISTING ELEVATION OVER |
| | THE PROPOSED STREET SECTIONS TO COMPARE THE DIFFERENCE |
| | BETWEEN EXISTING SIDEWALK/CURB/PLANTING ELEVATION AND |
| | PROPOSED. |
| | 4. SHEET C-702 SHALL BE RENAMED AS VALET OPERATIONS ARE |
| | NOT PERMITTED WITHIN THE PORTE COCHERE ALONG LAKEVIEW |
| | AVENUE. |
| | 5. PLEASE DISCUSS THE POSSIBILITY TO EXTEND THE FLAGLER |
| | DRIVE MEDIAN TO PROVIDE BETTER PROTECTION TO |
| | PEDESTRIANS CROSSING FROM NE CORNER OF PROJECT. HIGH |
| | VISIBILITY PEDESTRIAN STRIPING SHALL BE PROVIDED. SHEET |
| | C-800. |
| | 6. PLEASE EXPLAIN HOW THE DIAGRAM SHOWING OPEN/ |
| | ENCLOSED AREA IN THE GARAGE (SHEET LS-001) WILL IMPACT |
| | THE LOCATION OF THE GREEN SCREEN WITH PLANT MATERIAL |
| | PROPOSED FOR THE GARAGE. |
| | 7. PLEASE EXPLAIN HOW THE TWO SPACES NORTH OF THE RAMP |
| | ON THE 2ND FLOOR WORK. THEY DON'T SEEM TO HAVE A DRIVE |
| | AISLE. |
| | 8. PLEASE DIMENSION THE PARKING GARAGE TO CONFIRM |
| | COMPLIANCE WITH DRIVE AISLE WIDTH AND PARKING SPACE |
| | WIDTH AND LENGHT. |
| | 9. PLEASE REMOVE WHEEL STOPS FROM THE TANDEM PARKING |
| | SPACES. |
| | 10. PLEASE INLCUDE CALL OUT MATERIALS ON FACADE |
| | DRAWINGS. |
| | 11. AMOUNT OF LOVERS INCLUDED AT THE GROUND LEVEL |
| | DIFFERS FROM THE DAC APPROVAL. DAC APPROVAL INCLUDED |
| | SPANDREL GLASS TO HIDE UTILITY ROOM OR NON-ACIVE |
| | USES.PLEASE ADJUST OR JUSTIFY CHANGE. |
| | 13. SECTIONS IN SHEET A-250, A-251 AND A-252 SHALL |
| | INCLUDE THE SIDEWALK ELEVATION, PLANTING AREA AND |
| | TRAVEL LANES. |
| | 14. DAC APPROVAL INCLUDED A STEP DOWN DESIGN FOR THE |
| | RESTAURANT PATIO. PROPPOSED DESIGN IS A SINGLE LEVEL |
| | LOCATED 3'-6" ABOVE THE PARK LEVEL, BREAKING THE |
| | RELATIONSHIP BETWEEN THE RESTAURANT OUTDOOR DINING AND |
| | THE PARK ORIGINALLY PROPOSED. |
| | 15. PLEASE PROVIDE SPEC DETAILS FOR FIXTURE ELC AND |
| | ELC2 SPECIFIED AS THE STREET FIXTURE (NOT LISTED IN |
| | SHEET E-330) . FURTHER DISCUSSION NEEDED REGARDING THE |
| | FIXTURES AND POLES TO MATCH SURROUNDING. |
| | 16. PLEASE PROVIDE GENERAL PROJECT DATA INFORMATION ON |
| | THE SITE PLAN SHEET, INCLUDING SITE AREA, ALLOWABLE |
| | GBA, PROPOSED GBA FOR OFFICE, RESTAURAN + CHUCH, |
| | PARKING SPACES REQUIRED/PROVIDED PER NET AREA, BIKE |
| | PARKIGN REQUIRED/PROVIDED. |
| | 17. PLEASE SUBMIT ZONING SUPPORTING INFORMATION TO |
| | CONFIRM COMPLIANCE WITH MINIMUM SETBACKS, MAX BUILDING |
| | FOOTPRINT, PLANAR BREAKS ETC (AS INCLUDED IN SITE PLAN |
| | APPROVAL). |
| | 18. A SEPARATE LANDSCAPE PERMIT SHALL BE SUBMITTED |
| | INCLUDING ALL CALCULATIONS TO CONFIRM COMPLIANCE WITH |
| | PUBLIC AND PRIVATE OPEN SPACE REQUIREMENTS. |
| | 19. PLEASE PROVIDE DETAIL INFORMATION REGARDING THE |
| | GREEN LIVING SCREEN PROPOSED FOR THE PARKING GARAGE. |
| | 20. PLEASE PROVIDE INFORMATION REGARDING COMPLIANCE |
| | WITH REQUIRED TDMS FOR THE OBD. |
| | 21.PLEASE PROVIDE INFORMATION TO CONFIRM THE PROJECT IS |
| | CONDUCTING THE PROCESS FOR LEED GOLD CERTIFICATION |
| | REQUIRED FOR THE OBD INCENTIVE. |
| | 22. PLEASE PROVIDE INFORMATION REGARDING THE PROPOSED |
| | PEDESTRIAN CROSSING ENHANCEMENTS AT THE PROJECT |
| | CORNERS. |
| | 23. PLEASE PROVIDE INFORMATION TO CONFIRM APPROVAL FROM |
| | FDOT FOR THE IMPROVEMENTS WITHIN THE LAKEVIEW AND |
| | OKEECHOBEE ROW. |
| | 24. PROPERTY SHALL BE RE-PLATTED. |
| | FOR ADDITIONAL INFORMATIONS PLEASE CONTACT ANA MARIA |