| 2022-07-15 09:24:24 | NEW HI RISE OFFICE BLDG. |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) DRAWING G-011 - STAIRWELLS SHOULD NOT HAVE THE NOTES |
| | - " FLOOD VENTS", " AREA BELOW THE DFE BUT ABOVE THE |
| | BFE" - I BELIEVE THAT ALL THE STAIRWELLS HAVE BEEN |
| | RAISED TO THE DFE. |
| | |
| | 2) DRAWING G-011 - RED LINE DRAWN FOR THE "WALLS |
| | ENGINEERED FOR FLOOD LOADS" - SHOULD INCLUDE THE |
| | EXTERIOR WALL ALONGSIDE THE EXTERIOR RAMP WHERE THE FF |
| | INSIDE IS ALSO LOW - (COULD THE FLOOD DOOR BE USED AS |
| | THE EXTERIOR DOOR? WHICH WILL DO AWAY WITH FLOOD VENTS |
| | AND USING 2 FLOOD DOORS.) |
| | |
| | 3) DRAWING LS-118 - THE FIRE SERVICE ELEVATOR LOBBY - |
| | PART OF THE WALLS DO NOT SHOW AS FIRE RATED. |
| | |
| | 4) DRAWING G-006 - BUILDING ZONING DATA - FLOOD ZONE |
| | SHOWN IS INCORRECT. |
| | |
| | 5) DRAWING LS-101 - STAIR "C" SHOWS A WALL IN THE PATH |
| | OF EGRESS - AND IT IS UNCLEAR AS TO WHAT THE EXTERIOR |
| | DOOR OPENS TO (STAIR?). |
| | |
| | 6) DRAWING A-031 - STAIR FLOOR SLAB ELEVATIONS SHOULD |
| | MATCH ELEVATIONS SHOWN ON DRAWING G-011. |
| | |
| | 7) DRAWING A-733 - DETAIL 2 - STAIR "C" FF NEEDS TO |
| | MATCH G-011 |
| | |
| | 8) DRAWING A-233 - DETAIL 2 - STAIR "C" FF NEEDS TO |
| | MATCH G-011 |
| | |
| | 9) DRAWING A-356 - DETAIL 3 - NEEDS TO MATCH DRAWING |
| | G-011 |
| | |
| | 10) DRAWING A - 357 - STAIR "D" - DETAIL 1 - NEEDS TO |
| | MATCH DRAWING G-011 |
| | |
| | 11) PLEASE PROVIDE PRODUCT APPROVALS, ICC VALUATIONS OR |
| | ENGINEERING TEST REPORTS FOR THE FLOOD VENTS AND FLOOD |
| | DOORS - OTHER THAN MANUFACTURES DATA. |