| 2021-10-13 11:57:42 | 1ST REVIEW FBC-2020 FUEL GAS |
| | PERMIT- 21080871 |
| | 10/13/2021 |
| | |
| | CODES IN EFFECT: |
| | FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020 |
| | FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION |
| | 2020 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) SHEET P2.4: PROVIDE A COMPLETE GAS RISER DRAWING |
| | THAT INCLUDES ALL NEW AND EXISTING GAS PIPING AND |
| | APPLIANCES IN THE BUILDING- SECTIONS 401.3 & 401.4 FBC |
| | FG. THE CURRENT SHOWS ONLY PIPING TO THE DRYERS. REFER |
| | TO SECTIONS 402.1, 402.2 & 402.3 FBC FG. THE RISER |
| | SHALL INDICATE: |
| | A) TYPE OF GAS- NATURAL OR LP. |
| | B) DELIVERY PRESSURE AT THE METER. |
| | C) TOTAL BTU LOAD AND INDIVIDUAL APPLIANCE BTU LOADS. |
| | D) TYPES AND SIZES OF PIPING. |
| | E) TOTAL DEVELOPED LENGTH OF THE SYSTEM FROM THE METER |
| | TO THE MOST REMOTE APPLIANCE OUTLET. |
| | F) BRANCH AND CUT PIPE LENGTH MEASUREMENTS. |
| | G) LOCATIONS OF REGULATORS, SHUTOFF VALVES, AND PIPE |
| | UNIONS. |
| | H) OUTLET PRESSURES AT REGULATORS. |
| | I) LOCATIONS OF DRIPS AND SEDIMENT TRAPS. |
| | J) LOCATIONS AND TYPES OF PIPE SLEEVES. |
| | K) PIPE SIZING TABLES. |
| | |
| | 2) P0.2 & P2.4: PLEASE SHOW THE LOCATIONS OF THE |
| | REGULATORS, TEE FITTINGS, AND PIPE UNIONS- SECTIONS |
| | 410.2, 410.2(5,6, &7). LIST THE MAKES AND MODELS OF THE |
| | REGULATORS AND SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | MARKED UP OR HIGHLIGHTED TO SHOW THE SELECTED MODELS, |
| | THE MAX INLET AND OUTLET SIZE AND PRESSURES ETC. |
| | |
| | 3) P0.2: SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION MANUALS FOR THE WATER HEATERS- SECTION |
| | 624.1 FBC FG. THE CURRENT PLANS DO NOT PROVIDE ENOUGH |
| | INFORMATION TO PERFORM A COMPLETE REVIEW OF THE WATER |
| | HEATERS INCLUDING REQUIRED CONDENSATE DISPOSAL, AND |
| | COMBUSTION AIR AND VENTING PLANS- SEE COMMENTS 4, 5, & |
| | 6 BELOW. |
| | |
| | 4) P0.1, P2.4: INDICATE THE TYPES AND SIZES OF |
| | CONDENSATE PIPING FROM THE WATER HEATER AND SHOW THE |
| | PIPING RUNS FOR THE WATER HEATERS TO THE FLOOR SINK- |
| | SECTION 307.2 & 307.3 FBC FG. PLEASE NOTE THAT A |
| | NEUTRALIZING DEVICE MAY BE REQUIRED TO PROTECT THE |
| | DRAINAGE SYSTEM FROM CORROSIVE WASTE. PLEASE REVIEW THE |
| | MANUFACTURER'S RECOMMENDATIONS. |
| | |
| | 5) P0.2 & P2.4: PROVIDE COMBUSTION AIR CALCULATIONS FOR |
| | THE GAS WATER HEATERS- SECTION 304.1 FBC FG. THE PLAN |
| | SHOWS (2) EXISTING 24X16 INCH OPENINGS. REFER TO |
| | SECTION 304.6.1 FBC FG AND PROVIDE AN ELEVATION DETAIL |
| | TO SHOW THE REQUIRED OPENING LOCATIONS. PLEASE NOTE THE |
| | WATER HEATER DIAGRAM SHOWS A 3-INCH COMBUSTION AIR |
| | INTAKE DUCT ELBOW. |
| | |
| | 6) P2.4: PROVIDE A VENTING PLAN FOR THE WATER HEATERS |
| | INCLUDING A DIAGRAM THAT SHOWS THE TYPE AND SIZE OF |
| | VENT DUCTS, LENGTHS OF VENT CONNECTORS, RISERS, VENT |
| | TRUNKS AND TOTAL VENT RUN MEASUREMENT TO THE |
| | TERMINATION CAP ON THE ROOF. CLARIFY HOW THE SYSTEM WAS |
| | SIZED AND SUBMIT MANUFACTURER?S SPECIFICATIONS FOR ALL |
| | COMPONENTS- SECTIONS 503.1 & 624.1 FBC FG. THE DETAIL |
| | SHALL SHOW THE ROOF FLASHING AND THIMBLE- SECTION |
| | 503.6.6 AND ALL REQUIRED CLEARANCES- 503.6.4. |
| | |
| | 7) P0.1 & P2.4: INDICATE THE MAKES AND MODELS OF THE |
| | DRYERS AND SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION MANUALS. THE CURRENT PLANS DO NOT PROVIDE |
| | ENOUGH INFORMATION TO PERFORM A COMPLETE REVIEW OF THE |
| | DRYERS INCLUDING REQUIRED COMBUSTION AIR AND VENTING |
| | PLANS- SEE COMMENTS 8 & 9 BELOW. |
| | |
| | 8) P2.4: PROVIDE COMBUSTION AIR CALCULATIONS FOR THE |
| | GAS-FIRED DRYERS AND INDICATE HOW THE AIR WILL BE |
| | PROVIDED- SECTION 304.1 FBC FG. |
| | |
| | 9) P2.4: PROVIDE A GAS DRYER EXHAUST DIAGRAM INDICATING |
| | THE TYPE AND SIZE OF EXHAUST DUCTS, TOTAL RUN LENGTH OF |
| | THE SYSTEM, AND TERMINATION LOCATION- SECTION 614.1 FBC |
| | FG. SHOW THE LOCATION OF REQUIRED CLEANOUTS- 614.3 AND |
| | PROVIDE TERMINATION CAP DETAILS- 614.4 FBC FG. |
| | |
| | 10) P0.1: NEW GAS PIPE PENETRATIONS OF THE EXISTING |
| | SLAB WILL REQUIRE FIRESTOPPING TO SEAL THE ANNULAR |
| | SPACE AROUND THE PIPING. PROVIDE A UL TESTED AND |
| | APPROVED FIRESTOPPING ASSEMBLY DETAIL ON THE PLAN- |
| | SECTION 714.4.1.2 FBC B. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | |