Plan Review Notes For Permit 21080871
Permit Number 21080871
Review Stop B
Sequence Number 1
Notes
Date Text
2021-10-14 09:06:08REMODEL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH 2017 WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE SHOW THE REQUIRED FIRE CLASSIFICATIONS FOR
 THE WALL FINISHES, CEILING FINISHES AND FLOORING
 FINISHES FBC CHAPTER 8
  
 2) DRAWING A0.3 THE EFFICIENCY UNIT MARKED -
 "ACCESSIBLE SHOWER UNIT" - IS NOT MARKED CORRECTLY - IT
 IS NOT THE ACCESSIBLE UNIT - PLEASE CORRECT.
  
 3) PLEASE PROVIDE COMPLETE (FRONT PAGE AND THE
 INSTALLATION INSTRUCTIONS) PRODUCT APPROVALS FOR THE
 NEW EXTERIOR WINDOWS, EXTERIOR DOORS AND ROOFING
 SYSTEM.
  
 4) ALL PRODUCT APPROVALS AND SHOP DRAWINGS NEED TO BE
 REVIEWED AND MARKED APPROVED BY THE DESIGNER OF RECORD.
 FBC WPB 107.3.4
  
 5) PLEASE SHOW IF BUILDING IS SPRINKLERED OR NON
 SPRINKLERED FBC CHAPTER 5
  
 6) DRAWING C5.0 - ACCESSIBLE PARKING SPACE SHOULD SHOW
 AS 12 FOOT WIDE. FBC ACCESSIBILITY 502.2
  
 7) FOR THE FLOORING OTHER THAN CARPET PLEASE PROVIDE
 THE FOLLOWING ACOUSTICAL TEST REPORTS -
  
 MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO
 DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST
 REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE
 MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT)
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90..
 PROVIDE A COPY OF THE TEST REPORT. (A DROP CEILING
 SHOULD NOT BE INCLUDED IN THE FLOOR/CEILING ASSEMBLY
 DESCRIPTION UNLESS THE UNIT MATCHES THE TESTED DROP
 CEILING DESCRIPTION)
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. PROVIDE A COPY OF THE TEST REPORT. (A DROP
 CEILING SHOULD NOT BE INCLUDED IN THE FLOOR/CEILING
 ASSEMBLY DESCRIPTION UNLESS THE UNIT MATCHES THE TESTED
 DROP CEILING DESCRIPTION)
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS
 ATTACHED TO THE FLOORING)
  
 8) WHEN ASKING TO DEFER ITEMS SUCH AS PRODUCT APPROVAL
 OR SHOP DRAWINGS FOR WINDOWS, EXTERIOR DOORS, ROOFING,
 RAILING, ETC. PLEASE PROVIDE A DEFERRED SUBMITTALS LIST
 ON THE DRAWINGS - FBC WPB 107.3.4.1 DEFERRED
 SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED
 SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN
 THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION
 AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL
 WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL
 ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING
 OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS
 ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE
 BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL
 ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW
 THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A
 NOTATION INDICATING THAT THE DEFERRED SUBMITTAL
 DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL
 CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED
 SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE
 DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE
 BUILDING OFFICIAL.
  
  