2022-01-11 11:08:29RESIDENTIAL (R3) ADDITION, SECOND BUILDING REVIEW
 COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #21080730
  
 NOTE:
 BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO
 MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER
 THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID
 CONFLICTS/DELAYS. REVISION FEES MAY APPLY. CONTRACTOR
 TO ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME
 OR IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT
 ISSUANCE.
  
 ****ALL DRAWINGS NEED TO BE PROPERLY SIGNED AND SEALED
 BEFORE PROVISO.
  
  
 ORIGINAL COMMENT:
 1- DRAWINGS WERE NOT SIGNED AND SEALED BY THE ARCHITECT
 AND ENGINEER OF RECORD. ALL DRAWINGS NEED TO BE SIGNED
 AND SEALED AS REQUIRED BY CHAPTER 481 F.S. AND CHAPTER
 471 F.S. WHEN SUBMITTING DRAWINGS/DOCUMENTS FOR PUBLIC
 RECORDS.
 SUBMIT DRAWINGS ELECTRONICALLY WITH
 ARCHITECT'S/ENGINEER'S DIGITAL SIGNATURE OR PROVIDE
 HARD COPY PLANS WITH ARCHITECT'S ORIGINAL SEAL AND
 SIGNATURE.
  
 RESPONSE:
 THE FOLLOWING DRAWINGS WERE NOT SIGNED & SEALED: C-01,
 SP-01, A-00, A-02, A-03, A-04, S1, S3, S4, S5.
  
 2- OK.
 3- OK.
 4- OK.
  
 5-PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC
 61G20-3.001 FOR
 (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED
 SUBMITTAL. PROVIDE COMPLETE INFORMATION FOR REVIEW
 PRIOR TO INSTALLATION TO AVOID CONFLICTS/DELAYS. ALL
 PRODUCT APPROVALS NEED TO BE APPROVED IN WRITING BY
 DESIGNER OF RECORD PRIOR TO SUBMITTAL):
  
 A)OK.
  
 ORIGINAL COMMENT:
 B)HIP & RIDGE METAL SUPPORT TO BE USED. AND, CLEARLY
 MARK SPECIFIC METAL CHANNEL TO BE INSTALLED. SEE
 PERFORMANCE LIMITATIONS TABLES ON PRODUCT APPROVAL
 SUBMITTED.
  
 RESPONSE:
 NOT SUBMITTED.
  
 ORIGINAL COMMENT:
 C)ROOF UNDERLAYMENT FL14317-R12 SUBMITTED: CLEARLY MARK
 WHICH TESTED ASSEMBLY IS GOING TO BE INSTALLED. SEE
 SEC. 5.8.2 AND SEC. 5.8.3 OF PRODUCT APPROVAL
 SUBMITTED.
 THERE ARE 6 ASSEMBLIES. SPECIFY WHICH ASSEMBLY FROM
 SEC. 5.8.3.1 IS GOING TO BE INSTALLED.
  
 RESPONSE:
 STILL NOT CLEAR WHICH ASSEMBLY TO BE USED. TABLE 2 ON
 PAGE 4 OF 6 OF PRODUCT APPROVAL WAS MARKED, BUT IT
 DOESN'T CLARIFY IF USING ASTM D226 TYPE II FELT OR
 CITADEL PLUS AS THE SUBSTRATE. I F USING ASTM D226 FELT
 , THEN PROVIDE FRSA/TRI PRESCRIPTIVE METHOD USED. IF
 USING CITADEL PLUS , THEN CIRCLE WHICH ASSEMBLY IS
 GOING TO BE USED. SEE SEC. 5.8.2 OF PRODUCT APPROVAL
 SUBMITTED.
  
 6- OK.
 7- OK.
 8- OK.
  
 WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved