| 2021-08-12 16:14:13 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | |
| | 1) THERE IS NO INDICATION OF WHAT THE PROPOSED USE OF |
| | THE PROPOSED CANOPY IS FOR. |
| | |
| | PLEASE PROVIDE A DETAILED NARRATIVE OF WHAT THIS CANOPY |
| | WILL BE USED FOR. |
| | |
| | |
| | 1A) THE SITE PLAN INDICATES THAT THE PROPOSED CANOPY IS |
| | LOCATED DIRECTLY OUTSIDE EXIT DOORS FROM THE HOTEL. |
| | |
| | BASED ON # 1 WHAT IS THE PROPOSED FLOOR PLAN UNDER THE |
| | CANOPY THAT ENSURES A CLEAR EXIT PATH. |
| | |
| | PROVIDE A DETAILED LIFE SAFETY PLAN, INCLUDING THE |
| | OCCUPANY LOEAD, EXIT TRAVEL PATHS AND |
| | EQUIPMENT/TABLE/SEATING PLAN. |
| | |
| | |
| | 1B) BASED ON # 1 & 2 ABOVE, WHAT IS THE PROPOSED |
| | ELECTIRCAL PLAN, LIGHTING, EMERGENCY LIGHTING, EXIT |
| | SIGNAGE, ETC. |
| | |
| | PLEASE PROVIDE ELECTRICAL DETAILS INCLUDING HOW THE |
| | CANOPY BE OPENED/CLOSED/OPERATE |
| | |
| | |
| | 2) THE COVER SHEET INDICATES THE 6TH ED OF THE FFPC |
| | WITH 2015 LSC. THE CURRENT ED IS THE 7TH WITH 2018 LSC. |
| | |
| | PLEASE REVIE, CORRECT AND ENSURE COMPLIANCE. |
| | |
| | |
| | |
| | 3) THERE IS AN INDICATION OF FIRE SPRINKLER TO BE |
| | SUBMITTED. |
| | |
| | ALL FS WORK INCLUDING DEMO SHALL BE SUBMITTED UNDER |
| | SEPARATE PERMIT AND SHOP DRAWINGS. |
| | |
| | PLEASE PROVIDE THIS ADDITIONAL NOTE. |
| | |
| | |
| | |
| | 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |