| Date |
Text |
| 2021-10-05 15:39:17 | NEW BUILDING - CONVENIENCE STORE |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected]. |
| | CODE USED FOR REVIEW - 2020 FBC WITH 2017 WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | 1) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE |
| | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE EXTERIOR WINDOW, DOOR AND |
| | ROOFING SYSTEM LISTED ON THE PLANS. |
| | 2) PLEASE PROVIDE A SOIL REPORT (GEOTECHNICAL REPORT). |
| | FBC 1803.1 |
| | 3) PLEASE SHOW RESTROOM WALL FINISH TO COMPLY WITH - |
| | FBC 1210.2.2 WALLS AND PARTITIONS. |
| | WALLS AND PARTITIONS WITHIN 2 FEET (610 MM) OF SERVICE |
| | SINKS, URINALS AND WATER CLOSETS SHALL HAVE A SMOOTH, |
| | HARD, NONABSORBENT SURFACE, TO A HEIGHT OF NOT LESS |
| | THAN 4 FEET (1219 MM) ABOVE THE FLOOR, AND EXCEPT FOR |
| | STRUCTURAL ELEMENTS, THE MATERIALS USED IN SUCH WALLS |
| | SHALL BE OF A TYPE THAT IS NOT ADVERSELY AFFECTED BY |
| | MOISTURE. (DRYWALL IS NOT CONSIDERED A HARD SURFACE). |
| | 4) DRAWINGS S1.1, S2.2 AND CV-B SHOW THE WIND SPEED |
| | USED FOR WIND DESIGN AS 168MPH - RISK CATEGORY II WIND |
| | SPEED SHOULD BE 170MPH PER FBC WPB SECTION 120. |
| | 5) SEPARATE PERMITS ARE REQUIRED FOR DUMPSTER |
| | ENCLOSURE, EXISTING BUILDING DEMO, PARKING LOT, FUEL |
| | PUMPS AND FUEL PUMP CANOPIES - PLEASE ACKNOWLEDGE THIS. |
| | 6) PLEASE SHOW THE SALES COUNTER HEIGHT TO COMPLY WITH |
| | FBC 904.4 |
| | 7) PLEASE SHOW THE GRAB BAR MAX. HEIGHT ABOVE THE |
| | FINISHED FLOOR TO THE TOP OF THE GRIPPIONG SURFACE FBC |
| | 609.4 POSITION OF GRAB BARS. |
| | GRAB BARS SHALL BE INSTALLED IN A HORIZONTAL POSITION, |
| | 33 INCHES (840 MM) MINIMUM AND 36 INCHES (915 MM) |
| | MAXIMUM ABOVE THE FINISH FLOOR MEASURED TO THE TOP OF |
| | THE GRIPPING SURFACE, |
| | 8) SURVEY PROVIDED SHOWS THE PROPERTY IN A FLOOD ZONE |
| | "X" - PALM BEACH COUNTY FLOOD MAP SHOWS THE PROPERTY IN |
| | FLOOD ZONE "X" AND "A" - PLEASE SHOW THE PROPOSED |
| | BUILDING ON THE SURVEY AND THE FLOOD ZONE DELENIATION |
| | LINES TO DETERMINE IF THE BUILDING IS IN THE FLOOD ZONE |
| | "A". |
| | |