| Date |
Text |
| 2021-09-03 06:54:58 | BUILDING PLAN REVIEW |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/RPX306 |
| | INSPECTOR BN4338 |
| | BUILDING OFFICIAL BU1635 |
| | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | 2017 NEC |
| | |
| | 1ST REVIEW |
| | |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | REF. OPENING #5 ON SHUTTER SCHEDULE AND FL31658-R2 FOR |
| | THE FOLLOWING COMMENTS: |
| | |
| | 1. PER PRODUCT APPROVAL, NOTE #6. THIS IS A MOTOR |
| | DRIVEN ROLL-UP SHUTTER. AN ELECTRICAL PERMIT IS |
| | REQUIRED. SEE COMMENTS UNDER ELECTRICAL REVIEW. |
| | PERMITS - 105.1 REQUIRED. |
| | |
| | 2. PROVIDE PRODUCT APPROVAL FOR ROLL-UP MECHANISM AND |
| | HOOD ASSEMBLY. |
| | FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE |
| | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED |
| | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| | |
| | 3. PER PRODUCT APPROVAL, PAGE 7, FASTENER SCHEDULE, |
| | FASTENERS SHALL BE 1/4" ALL-POINTS SOLID SET. |
| | |
| | REF. OPENINGS 1 THRU 4 AND 6 THRU 10 ON SHUTTER |
| | SCHEDULE AND FL1850-R13 FOR THE FOLLOWING COMMENT: |
| | |
| | 4. SEE PRODUCT APPROVAL, PAGE 12, FASTENER SCHEDULE, |
| | FASTENERS SHALL BE TAPCONS W/ADVANCED THREAD FORM |
| | TECHNOLOGY. |
| | |
| | REF. SHUTTER SCHEDULE FOR THE FOLLOWING COMMENT: |
| | |
| | 5. TYPE OF ANCHOR SPECIFIED. WHEN MORE THAN ONE TYPE OF |
| | DEVICE IS INSTALLED, INCLUDE ALL TYPES OF ANCHORS USED. |
| | ANCHORS SHALL BE SPECIFIC PER NOTE #1 ON SHUTTER |
| | SCHEDULE. |
| | |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |