| Plan Review Notes For Permit 21071625 |
| Permit Number |
21071625 |
|
| Review Stop |
R |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2022-03-28 12:41:39 | SEE BUILDING PLAN REVIEW - IF THE ROOFING SYSTEM | | | PRODUCT APPROVALS ARE TO BE DEFERRED - PLEASE ADD | | | ROOFING SYSTEM TO THE DEFERRED LIST ON THE DRAWINGS. | | | | | | FBC WPB 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES | | | OF THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS | | | THOSE PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT | | | THE TIME OF THE APPLICATION AND THAT ARE TO BE | | | SUBMITTED TO THE BUILDING OFFICIAL WITHIN A SPECIFIED | | | PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE | | | PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED | | | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST | | | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS | | | FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR | | | DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE | | | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE | | | WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING | | | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED | | | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE | | | IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. | | | THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED | | | UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN | | | APPROVED BY THE BUILDING OFFICIAL. |
|