| 2022-01-04 16:51:57 | NEW COMMERCIAL BUILDING R2 |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) PLEASE PROVIDE A NOTE THAT THE FIRE SERVICE ACCESS |
| | ELEVATOR LOBBY DOORS COMPLY WITH FBC 3007.6.3 THE FIRE |
| | DOOR ASSEMBLY SHALL COMPLY WITH THE SMOKE AND DRAFT |
| | CONTROL DOOR ASSEMBLY REQUIREMENTS OF SECTION |
| | 716.5.3.1, AND BE TESTED IN ACCORDANCE WITH UL 1784 |
| | WITHOUT AN ARTIFICIAL BOTTOM SEAL. |
| | |
| | 2) EXIT ACCESS DOORS FROM THE 2ND FLOOR POOL DECK |
| | SHOULD SWING IN THE DIRECTION OF EGRESS FBC 1010.1.2.1 |
| | |
| | 3) STAIR "C" - DOORS IN A SERIES = FBC 1010.1.8 DOOR |
| | ARRANGEMENT. |
| | SPACE BETWEEN TWO DOORS IN A SERIES SHALL BE 48 INCHES |
| | (1219 MM) MINIMUM PLUS THE WIDTH OF A DOOR SWINGING |
| | INTO THE SPACE. |
| | |
| | 4) PLEASE SHOW THE POOL BARRIER FOR DECK LEVEL 2 POOL |
| | AND THE PENTHOUSE POOL FBC 454.1.3.1.9 |
| | |
| | 5) PLEASE SHOW THE SPA STEAM SHOWER AND SAUNA TO BE |
| | ACCESSIBLE PER - FBC FHA REQUIREMENT 2. (14) |
| | |
| | 6) PLEASE SHOW THE MEN'S RESTROOM IN THE MEN'S SPA AREA |
| | TO BE ACCESSIBLE - FBC FHA REQUIREMENT 2. (11) |
| | |
| | 7) PLEASE SHOW A CLEAR DOOR WIDTH OF 32" FOR WALK-IN |
| | CLOSETS, WALK-IN PANTRYS, WALK-IN WINE CELLARS, SPA |
| | STEAM SHOWER AND SPA SAUNA ETC. - FBC FHA REQUIREMENT |
| | 3. (2) |
| | |
| | 8) ALL FLOOR PLANS NEED TO SHOW THE DOOR DESIGNATION |
| | NUMBER PER THE DOOR SCHEDULE - SOME ARE SHOWN BUT NOT |
| | ALL - FBC WPB 107.2.1 |
| | |
| | 9) PLEASE SHOW THE CLEAR FLOOR SPACE FOR THE TOILET IN |
| | THE TOILET ROOMS WHICH ARE IN THE MASTER BATHROOMS - |
| | FBC FHA REQUIREMENT 7. (2) |
| | |
| | 10) PLEASE SHOW ON THE FLOOR PLANS THAT EACH UNIT |
| | BATHROOM COMPLIES WITH SPEC. A OR B - FBC FHA |
| | REQUIREMENT 7. (2) |
| | |
| | 11) PLEASE SHOW THE UNIT FLOOR FINISHES - FOR OTHER |
| | THAN CARPET AND PROVIDE THE FOLLOWING ACOUSTICAL TEST |
| | REPORTS - |
| | |
| | MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO |
| | DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST |
| | REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE |
| | MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT) |
| | |
| | A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING |
| | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR |
| | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS |
| | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR |
| | BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.. |
| | PROVIDE A COPY OF THE TEST REPORT. (A DROP CEILING |
| | SHOULD NOT BE INCLUDED IN THE FLOOR/CEILING ASSEMBLY |
| | DESCRIPTION UNLESS THE UNIT MATCHES THE TESTED DROP |
| | CEILING DESCRIPTION) |
| | |
| | B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN |
| | DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC |
| | OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN |
| | IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN |
| | 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH |
| | ASTM E 492. PROVIDE A COPY OF THE TEST REPORT. (A DROP |
| | CEILING SHOULD NOT BE INCLUDED IN THE FLOOR/CEILING |
| | ASSEMBLY DESCRIPTION UNLESS THE UNIT MATCHES THE TESTED |
| | DROP CEILING DESCRIPTION) |
| | |
| | C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE |
| | BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL |
| | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID |
| | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED |
| | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE |
| | 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84 |
| | OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS |
| | ATTACHED TO THE FLOORING) |
| | |
| | 12) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE |
| | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS, EXTERIOR |
| | DOORS, ROOFING SYSTEMS, EXTERIOR LOUVERS, EXTERIOR |
| | CLADDING - ETC. - ALL PRODUCT APPROVALS NEED TO BE |
| | REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER |
| | OF RECORD FBC WPB 107.3.4 |
| | |
| | 13) ITEMS SUCH AS WINDOW, DOOR AND ROOFING PRODUCT |
| | APPROVALS, FLOORING/UNDERLAYMENT ACOUSTICAL TEST |
| | REPORTS - ETC. MAY BE DEFERRED SUBMITTALS BY LISTING |
| | ITEMS TO BE DEFERRED ON THE CONSTRUCTION DOCUMENTS - |
| | 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| | DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| | IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| | THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| | UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| | APPROVED BY THE BUILDING OFFICIAL. |
| | |
| | 14) A SEPARATE PERMIT SHALL BE REQUIRED FOR - EXISTING |
| | BUILDING DEMO., SITE PAVING, SITE WALKWAYS, SITE |
| | LIGHTING, WATER FALLS, FENCING, SIGNS ETC.. |
| | |
| | 15) TO VERIFY THAT THE BUILDING IS NOT IN A FLOOD ZONE |
| | - PLEASE SHOW THE BUILDING FOOT PRINT (B1 AND B2) ON A |
| | DRAWING WITH THE FLOOD ZONE - SUCH AS DRAWING C5.00 |