| Date |
Text |
| 2021-11-08 12:14:56 | FAILED |
| | |
| | 1) IN ACCORDANCE WITH RESOLUTION NO. 362-19, THE |
| | FOLLOWING ITEMS ARE REQUIRED PRIOR TO ZONING APPROVAL |
| | OF THIS PERMIT: |
| | |
| | A. REPEAT COMMENT: THE AC UNITS AND THE MOUNTING RACKS |
| | ON THE WEST BUILDING WALL OF 477 SOUTH ROSEMARY MUST BE |
| | REMOVED. VERIFICATION OF THE REMOVAL MUST BE SUBMITTED |
| | WITH THE BUILDING PERMIT. **** THIS HAS NOT BEEN |
| | PROVIDED, AND IN FACT STAFF HAS REVIEWED A PERMIT FOR |
| | 477 SOUTH ROSEMARY WHICH CONTINUES TO SHOW A MINI-SPLIT |
| | LOCATED ON THE WEST BUILDING WALL. **** |
| | B. THE ROOFTOP PLANS SUBMITTED WITH THE BUILDING PERMIT |
| | MUST SHOW COMPLIANCE WITH THE SOLAR OR GREEN ROOF |
| | REQUIREMENTS OF THE ROSEMARY SQUARE CENTER SUBAREA. |
| | **** THANK YOU FOR CALLING OUT THE LOCATION OF THE |
| | SOLAR INSTALLATION. STAFF HAS REVIEWED THE ROOF PLANS |
| | AND IT APPEARS THAT THERE ARE ADDITIONAL AREAS THAT |
| | COULD INCORPORATE A PASSIVE GREEN ROOF SYSTEM OR EVEN |
| | POSSIBLY ADDITIONAL SOLAR. PLEASE HAVE YOUR LEED |
| | CONSULTANT CONTACT ERIC SCHNEIDER, PRINCIPAL PLANNER, |
| | AT (561) 822-1446 TO DISCUSS THIS REQUIREMENT. **** |
| | C. REPEAT COMMENT: PROVIDE VERIFICATION OF THE PROGRAM |
| | TO ENSURE THAT THE JOB SITE WORKERS WILL BE PAID NOT |
| | LESS THAN THE PALM BEACH COUNTY LIVING WAGE STANDARD |
| | AND THAT NO LESS THAN 15% OF ALL CONSTRUCTION SERVICES |
| | ARE FROM SMALL BUSINESS ENTERPRISE (SBE) FIRMS LOCATED |
| | IN PALM BEACH COUNTY. **** NO INFORMATION HAS BEEN |
| | PROVIDED. **** |
| | |
| | 2) REPEAT COMMENT: THERE ARE CHANGES TO THE LAYOUT OF |
| | THE PRIVATE OPEN SPACE AREAS AS COMPARED TO THE LATEST |
| | SITE PLAN APPROVAL. PRIOR TO ZONING APPROVAL OF THIS |
| | PERMIT, THE LANDSCAPE PERMIT, SHOWING COMPLIANCE WITH |
| | THE PRIVATE OPEN SPACE REQUIREMENTS FOR THE PROJECT, |
| | NEEDS TO BE SUBMITTED AND APPROVED. THE GROUND LEVEL |
| | LANDSCAPE MUST BE INCLUDED WITH THE LANDSCAPE PERMIT. |
| | **** THE PLANS SUBMITTED WITH THE PERMIT HAVE BEEN |
| | CHANGED FROM THE MINOR AMENDMENT APPROVED ON FEBRUARY |
| | 25, 2021. NO LANDSCAPE PERMIT SUBMITTED. **** |
| | |
| | 3) REPEAT COMMENT: PROVIDE THE ZONING CODE COMPLIANCE |
| | INFORMATION FOR THE PROJECT, INCLUDING THE SITE AND |
| | PROJECT DATA, THE FACADE ARTICULATION INFORMATION, THE |
| | OPEN SPACE DIAGRAMS AND CALCULATIONS, THE ACTIVE USE |
| | DIAGRAMS, THE FAR SPACE DIAGRAMS, THE GROSS BUILDING |
| | USE CALCULATIONS. THESE MUST COMPLY WITH THE CHANGES |
| | MADE TO THE FACADES. **** NOT PROVIDED. THESE MUST BE |
| | INCLUDED WITH THE PERMIT PLANS. **** |
| | |
| | 4) THANK YOU FOR PROVIDING UPDATED WINDOW GLAZING |
| | DETAILS. UPON SUBMITTAL OF THE ZONING CODE COMPLIANCE |
| | INFORMATION, STAFF WILL VERIFY THAT THE GLAZING DETAILS |
| | COMPLY WITH THE CODE REQUIREMENTS. |
| | |
| | 5) ADDITIONAL PERMITS, WITH PLANS ARE REQUIRED FOR THE |
| | FOLLOWING: |
| | |
| | A. LANDSCAPE |
| | B. IRRIGATION |
| | C. EXTERIOR BICYCLE RACKS |
| | D. HARDSCAPE |
| | E. SITE LIGHTING - THE PERMIT NEEDS TO INCLUDE A |
| | PHOTOMETRIC PLAN, AS WELL AS THE SPEC SHEETS FOR ALL OF |
| | THE LIGHTING TYPES. |
| | F. AWNINGS NOT INCLUDED WITH THIS PERMIT |
| | G. MODIFICATIONS TO THE GARAGE, INCLUDING THE EV |
| | CHARGERS. |
| | |
| | |
| | 6) PLEASE REMEMBER THAT PRIOR TO THE ISSUANCE OF THE |
| | FIRST CERTIFICATE OF OCCUPANCY FOR THE NEW BUILDING AT |
| | 575 SOUTH ROSEMARY AVENUE, THE FOLLOWING ARE REQUIRED: |
| | |
| | A. VERIFICATION OF COMPLIANCE WITH THE WORKFORCE |
| | HOUSING REQUIREMENTS OF THE ROSEMARY SQUARE CENTER |
| | SUBAREA BY THE CITY'S HOUSING AND COMMUNITY DEVELOPMENT |
| | DEPARTMENT. |
| | B. VERIFICATION THAT THE BUILDING HAS BEEN CONSTRUCTED |
| | TO A LEED SILVER STANDARD OR EQUIVALENT RATING SYSTEM. |
| | C. VERIFICATION THAT THE CHARGING STATIONS AND THE RIDE |
| | SHARE SPACE HAVE BEEN INSTALLED WITHIN THE D GARAGE. |
| | D. WAYFINDING SIGNS MUST BE INSTALLED TO DIRECT |
| | PEDESTRIANS FROM THE D GARAGE TO THE OFFICE, |
| | RESIDENTIAL AND RETAIL ENTRANCES. |
| | E. PROVIDE VERIFICATION OF THE BICYCLE SHARE DISCOUNT |
| | MEMBERSHIP PROGRAM. |
| | |
| | 7) ADDITIONALLY, PRIOR TO THE APPROVAL OF THE FINAL |
| | INSPECTION (104) FOR THE GROUND FLOOR SPACE THAT FRONTS |
| | THE ACCESS EASEMENT AT THE NORTH END TO THE SITE, A |
| | PUBLIC ACCESS EASEMENT, IN A FORM ACCEPTABLE TO THE |
| | CITY ATTORNEY'S OFFICE, FOR THE PUBLIC SPACE |
| | TERMINATING THE PUBLIC OPEN SPACE - PASSAGE, MUST BE |
| | RECORDED. |
| | |
| | 8) STAFF HAS NOTED THAT THE PROPOSED DEVELOPMENT IS NOW |
| | ON A SEPARATE PARCEL, WHICH INCLUDES PORTIONS OF TRACTS |
| | D AND D-1 OF CITYPLACE PLAT 1, THAT IS OWNED BY 575 |
| | ROSEMARY APARTMENTS LLC, INSTEAD OF CITYPLACE RETAIL |
| | LLC. PRIOR TO THE CERTIFICATE OF OCCUPANCY FOR THE |
| | BUILDING, A MINOR SUBDIVISION (REPLAT) APPLICATION MUST |
| | BE FILED WITH THE CITY'S PLANNING DIVISION AND APPROVED |
| | BY THE CITY COMMISSION. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| | [email protected] |
| | |