| Plan Review Notes For Permit 21070800 |
| Permit Number |
21070800 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-01-31 09:03:58 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A | | | DEMO PERMIT PER FLORIDA BUILDING | | | CODE, BUILDING 3303: | | | | | | 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER | | | DEPARTMENT, REQUEST FOR METER PULL, ON | | | THEIR FORM "DEMOLITION APPLICATION" | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | | UILDING-PERMIT-FORMS | | | WATERDOWN METHOD: | | | IF A BACKFLOW PREVENTER IS DESIRED, THEN A PARTIAL | | | RELEASE WILL BE NOTED | | | ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS | | | SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE | | | SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE | | | BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY | | | THE CITY?S UTILITIES DEPT, 561-822-2244. FAX THE | | | COMPLETED "DEMOLITION APPLICATION" FORM TO | | | 561-822-2183. | | | 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT | | | APPLICATION TO BUILDING DIVISION); | | | SCHEDULE A FINAL PLUMBING #703. | | | | | | |
|