| 2021-10-25 07:05:46 | 1ST REVIEW FBC-2020 PLUMBING |
| | PERMIT-21070798 |
| | 10/25/2021 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC P- FLORIDA PLUMBING CODE SEVENTH EDITION 2020 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE SEVENTH EDITION |
| | 2020 |
| | FBC FG- FLORIDA FUEL GAS CODE SEVENTH EDITION 2020 |
| | FBC B- FLORIDA BUILDING CODE SEVENTH EDITION 2020 |
| | FBC M- FLORIDA MECHANICAL CODE SEVENTH EDITION 2020 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SEVENTH |
| | EDITION 2020 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SEVENTH EDITION |
| | 2020 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SEVENTH |
| | EDITION 2020 |
| | |
| | PLAN REVIEW RESULTS: DENIED |
| | |
| | 1) CLEARLY, INDICATE ON THE PLAN IF THE LP TANK IS |
| | ABOVE GROUND OR BELOW GROUND, AND SHOW THE METHOD OF |
| | REQUIRED PROTECTION FOR THE LP TANK AND APPURTENANCES |
| | PER NFPA 58. IF THE TANK IS BELOW GROUND IT SHALL BE |
| | ANCHORED PER NFPA 58 SEC.3-2.2.7 (H). IF ABOVE GROUND, |
| | THE TANK SHALL BE SECURELY ANCHORED TO WITHSTAND 170 |
| | MPH ULT WIND LOAD PER THE FLORIDA BUILDING CODE. WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | 2) THE SUBMITTED GAS PERMIT APPLICATION STATES INSTALL |
| | 500 GALLON LP TANK AND GAS LINES TO POOL HEATER, FIRE |
| | PIT, AND FIRE BOWLS. PLEASE SHOW THE GAS LINES |
| | EXTENDING TO THE FIRE BOWLS.WPB AMENDMENTS TO THE FBC |
| | SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 3) A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED PER |
| | NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE |
| | MONITORED PER NFPA 58 SEC.6.6.6.1 (J). SUBMIT DETAILS |
| | ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS.) & A |
| | NUMBER OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE CABLE. |
| | |
| | 4) THE SUBMITTED SHEET FOR THE LOCATION OF UNDERGROUND |
| | LP TANK INSTALLATION IS FOR ILLUSTRATIVE PURPOSES ONLY. |
| | THE LOCATION OF THE UNDERGROUND LP TANK SHALL COMPLY |
| | WITH TABLE 6.3.1 OF NFPA 58-11. SHOW THE DISTANCE OF |
| | THE LP TANK FROM THE EXTERIOR WALL OF THE STRUCTURE. |
| | |
| | 5) SHOW THE DEPTH OF THE CONTAINER BELOW GRADE. COMPLY |
| | WITH NFPA 58 SEC. 6.6.6.1. |
| | |
| | 6) THE GAS HAS BEEN SUBMITTED THAT IS DRAWN IN PENCIL |
| | ON THE SURVEY ARE ILLEGIBLE, AND DO NOT SHOW ALL OF THE |
| | GAS LINES TO BE INSTALLED. PLANS DONE IN PENCIL ARE |
| | UNACCEPTABLE AS THE DRAWING CAN BE MODIFIED/CHANGED. |
| | WPB AMENDMENTS TO THE FBC SEC. 107.2.1.4 QUALITY OF |
| | BUILDING PLANS. |
| | |
| | 7) THE ADDRESS OF THE PROJECT OR RESIDENCE MUST BE ON |
| | PLAN. WPB AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION |
| | ON CONSTRUCTION DOCUMENTS. |
| | |
| | 8) A GAS GRILL IS LABELED FOR OUTSIDE USE AND IT SEEMS |
| | TO BE IN A COVERED PATIO, IF SO PLEASE PROVIDE |
| | MANUFACTURES RECOMMENDATION FOR A VENTILATION HOOD, |
| | 2017 FBC FG SEC.G2408.1. |
| | |
| | 9) SUBMIT MANUFACTURES SPECIFICATIONS FOR THE GRIL AND |
| | ALL GAS FIXTURES/ APPLIANCES TO BE INSTALLED. FGC |
| | SEC.305.1, FBC-RES. SEC.G2408.1. |
| | |
| | 10) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. 2017 FBC FUEL GAS SEC. |
| | 409.4, FBC FUEL GAS RES. SEC. G2420.4. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | ATELYO BELISLE |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6695 |
| | |