2021-10-08 13:20:142ND REVIEW FBC-2020 FUEL GAS
 PERMIT- 21070675
 10/8/2021
  
 CODES IN EFFECT:
 FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION
 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED. FAILED COMMENTS FROM THE
 1ST REVIEW ARE LISTED BELOW WITH ADDITONAL NOTES IN CAP
 LETTERS.
  
 1) FAILED. SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION MANUALS FOR THE WATER HEATERS AND DIRECT
 VENT SYSTEM, COOKING APPLIANCES, DRYERS, REGULATORS,
 SOLENOID VALVES- SECTION 305.1, 623.1, & 624.1 FBC FG,
 AND 107.2.1 WPB. BASED ON THE NARRATIVE RESPONSE PLEASE
 ADD THE ITEMS TO THE DEFERRED SUBMITALL LIST- SECTION
 107.3.4.1 WPB.
  
 4) FAILED. P4.01 & P7.05: THE GAS SUPPLY PIPE TO THE
 GENERATOR SHALL BE CONNECTED ON THE SUPPLY SIDE OF THE
 MAIN GAS SHUTOFF VALVE TO THE BUILDING AND BE MARKED AS
 SUPPLYING AN EMERGENCY GENERATOR- SECTION 7.9.7 NFPA
 110. THE DRAWINGS WERE NOT CORRECTED.
  
 6) FAILED. P4.01, P4.02 & P7.05: PLACE NOTES TO
 INDICATE ALL SHUTOFF VALVES INCLUDING THE SOLENOID
 VALVES WITH MANUAL RESETS ARE IN ACCESSIBLE LOCATIONS-
 SECTION 409.1.3 FBC FG. IT APPEARS THAT ONE AUTO VALVE
 WILL SERVE BOTH COOKING LINES WHICH APPEARS TO NOT MEET
 THE INTENT OF THE CODE. THERE ARE TWO HOOD EXHAUST
 SYSTEMS WHICH WILL TYPICALLY HAVE TWO SEPARATE FIRE
 SUPPRESSION SYSTEMS. CLARIFY IF THE INTENTION IS TO
 HAVE GAS SUPPLY SHUT DOWN TO BOTH COOKING LINES IF AN
 INCIDENT OCCURS AT ONLY ONE OF THE TWO COOKING LINES
 AND SUPPRESSION SYSTEMS. PLEASE ENSURE THAT THE FIRE
 SUPPRESSION SYSTEMS WILL CORRELATE TO THIS DESIGN-
 SECTION 107.2.1 WPB.
  
 7) FAILED. P4.01 & P7.05: PLACE A NOTE TO INDICATE THE
 SOLENOID VALVE SHOWN AT THE COOKING LINE MEETS
 COMPLIANCE WITH SECTION 10.4.1 NFPA 96: AN AUTOMATIC
 GAS SHUTOFF VALVE IS REQUIRED TO BE CONNECTED TO THE
 HOOD FIRE SUPPRESSION SYSTEM. PLEASE SEE COMMENT #6
 NOTES.
  
 8) FAILED. P4.01 & P7.05: SHOW THE LOCATION OF THE
 AUTOMATIC GAS VALVE FOR THE GAS LINE SERVICE COOKING
 APPLIANCES PK39, PK40 & PK41- SECTION 10.4.1 NFPA 96.
 PLEASE SEE COMMENT #6 NOTES.
  
 10) FAILED. P7.05: SHOW THE BRANCH LENGTHS AND CUT PIPE
 LENGTH MEASUREMENTS ON THE RISER INCLUDING BRANCH AND
 TOTAL LENGTHS FROM SECONDARY REGULATORS TO APPLIANCE
 AND EQUIPMENT OUTLETS- SECTIONS 402.4.1 & 402.4.2 FBC
 FG. A) THE MEASUREMENTS SHOWN ON THE RISER INDICATE THE
 5 PSI LINE FROM THE METER TO THE LOW PRESSURE REGULATOR
 FOR THE DRYERS HAS A TDL OF 103 FT. THE LENGTH TO THE
 LOW PRESSURE REGULATOR SERVING THE COOKING LINES IS 91
 FT. NOTE #1 ON THE PLAN INDICATES 202 FT. WHICH APPEARS
 INCORRECT.
  
 11) FAILED. P7.05: PROVIDE REGULATORS AT THE GAS DRYER
 AND GENERATOR LOCATIONS- SECTIONS 410.2 FBC FG.
 REGULATOR/NOTE NOT PROVIDED AT THE GENERATOR. PLEASE
 SEE PAGE 57- 60 OF THE ALLIANCE LAUNDRY SYSTEM
 INSTALLATION MANUAL AND PROVIDE THE INPUT PRESSURES
 RATING OF THE DRYERS AND VERIFY COMPLIANCE WITH THE
 PRESSURE DROP TABLES SHOWN.
  
 14) FAILED. P7.05 & P.1.1.1: BASED ON SHEET P1.1.1 IT
 APPEARS THE GAS PIPING TO THE GENERATOR MAY BE RUNNING
 UNDERGROUND. P1.1.1 SHOWS THE PIPING CROSSING IN FRONT
 OF THE ENTRY DOOR TO THE WATER ROOM. PLEASE PLACE NOTES
 ON THE RISER TO CLARIFY AND PROVIDE COMPLIANCE DETAILS
 FOR UNDERGROUND PIPING- SECTIONS 404.6 & 404.11 FBC FG.
 IF THE PIPING IS PE PLEASE PROVIDE INSTALLATION AND
 RISER DETAILS, AND THE PIPE SIZING TABLE TO BE USED-
 SECTION 402.4 FBC FG. THE METALLIC PIPING RUNNING
 UNDERGROUND SHALL BE PROTECTED AGAINST CORROSION-
 SECTIONS 404.11- 404.11.2 FBC FG. PLEASE INDICATE THE
 METHOD OF PROTECTION.
  
 15) FAILED. PROVIDE COMBUSTION AIR CALCULATIONS FOR THE
 GAS-FIRED COOKING APPLIANCES AND INDICATE HOW THE AIR
 WILL BE PROVIDED- SECTION 304.1 FBC FG. BASED ON THE
 NARRATIVE RESPONSE, REVIEW OF SHEET M6.0.1 INDICATES
 RTU 6 FOR THE KITCHEN HAS AN EXCESS SUPPLY OF 267 CFMS
 OF O/A AND THE CALCULATIONS INDICATE 435 CFMS IS
 REQUIRED. PLEASE NOTE THAT SECTION 304.9.3 REQUIRES THE
 SYSTEM SHALL PROVIDE THE SPECIFIED RATE IN ADDITION TO
 THE VENTILATION AIR RATE.
  
 16) FAILED. PROVIDE COMBUSTION AIR CALCULATIONS FOR THE
 GAS-FIRED DRYERS AND INDICATE HOW THE AIR WILL BE
 PROVIDED- SECTION 304.1 FBC FG. REFER TO SECTION
 304.6.2 FG FOR COMBUSTION AIR USING THE ONE
 PERMANENT-OPENING METHOD. THE OPENING IN THE DOOR DOES
 NOT MEET COMPLIANCE FOR SIZE AND LOCATION. THE OPENING
 SHALL BE WITHIN 12 INCHES TO THE TOP OF THE ENCLOSURE
 AND COMMUNICATING DIRECTLY WITH THE OUTDOORS. IN
 ADDTION, PLEASE REFER TO SECTION 404.3 FBC M WHICH
 REQUIRES ROOMS ADJACENT TO PARKING GARAGES TO BE
 MAINTAINED AT A POSITIVE PRESSURE. A) PLEASE SEE PAGE
 21 OF THE SUBMITTED ALLIANCE LAUNDRY SYSTEM SPECS AND
 INDICATE THE MODEL NUMBER OF THE DRYER. B) PLEASE SEE
 PAGE 52 OF THE ALLIANCE LAUNDRY SYSTEM SPECIFICATIONS
 AND SHOW COMPLIANCE FOR MAKEUP AIR OPENINGS.
  
 17) FAILED. PROVIDE A GAS DRYER EXHAUST DIAGRAM
 INDICATING THE TYPE AND SIZE OF EXHAUST DUCT, TOTAL RUN
 LENGTH AND TERMINATION LOCATION- SECTION 614.1 FBC FG.
 SHOW THE LOCATION OF REQUIRED CLEANOUTS- 614.3 AND
 PROVIDE TERMINATION CAP DETAILS- 614.4. PLEASE PROVIDE
 A SITE-SPECIFIC EXHAUST DUCT DIAGRAM BASED ON THE
 MANUFACTURER'S RECOMMENDATIONS SHOWN ON PAGES 52-56 OF
 THE SUBMITTED ALLIANCE LAUNDRY SYSTEMS SPECS. REFER TO
 PAGE 4- THE MAXIMUM ALLOWABLE LENGTH IS 14 FT AND WITH
 TWO 90 DEGREE ELBOWS OR EQUIVALENT FOR AN INDIVIDUAL
 VENT. SEE THE TABLE ON PAGE 54 FOR DUCT DIAMETERS AND
 ELBOW LENGTHS.
  
 18) FAILED. PLEASE NOTE THAT ALL REQUESTED
 MANUFACTURER'S SPECIFICATIONS AND INSTALLATION MANUALS
 FOR FIXTURES, APPLIANCES, AND EQUIPMENT MAY BE DEFERRED
 IN ACCORDANCE WITH SECTION 107.3.4.1 WPB. ALL DEFERRED
 SUBMITTALS SHALL BE LISTED ON THE PLAN. PLEASE PROVIDE
 A LIST OF DEFERRED SUBMITTALS THAT INCLUDE THE WATER
 HEATERS, COOKING APPLIANCES, REGULATORS, SOLENOID VALVE
 ETC.
 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE
 DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT
 SUBMITTED AT THE TIME OF THE APPLICATION
 AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL
 WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY
 SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE
 BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW
 THEM AND FORWARD THEM TO THE BUILDING
 OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED
 AND FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF
 THE BUILDING. THE DEFERRED
 SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE
 DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN
 APPROVED BY THE BUILDING OFFICIAL.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved