| Date |
Text |
| 2021-07-27 15:07:08 | CONCRETE PAD FOR TEMPORARY TRAILER |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected]. |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - |
| | 1) PLEASE PROVIDE MORE INFORMATION ON THE TRAILER. WILL |
| | THE TRAILER REMAIN MOBILE (NOT STRUCTURALLY TIED |
| | DOWN?). CLEARLY SHOW THE THE TRAILER USE. |
| | 2) PLEASE SHOW THE ACCESSIBLE ROUTE TO COMPLY WITH FBC |
| | 402 |
| | 3) PLEASE PROVIDE THE ACCESSIBLE LIFT DETAILS TO COMPLY |
| | WITH FBC 410 |
| | 4) PLEASE SHOW THE TRAILER DISTANCE FROM THE EXISTING |
| | BUILDING. FBC WPB 107.2.5 |
| | 5) PLEASE PROVIDE CANOPY DETAILS TO COMPLY WITH FBC |
| | 3105 |
| | 6) FBC WPB 107.3.4.1 DEFERRED SUBMITTALS. FOR THE |
| | PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE |
| | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| | SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE |
| | TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | |