| 2021-08-02 10:54:22 | 1) SUBMIT A GAS ISOMETRIC DRAWING THAT CLEARLY SHOWS |
| | THE LENGTH OF ALL CUT SECTIONS OF PIPE PER FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. |
| | 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, TYPE OF GAS (LP OR NATURAL).WPB AMEND. TO |
| | FBC SEC. 107.2.1. |
| | 3) LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE FBC-FUEL GAS |
| | SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 |
| | (37). |
| | 4) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR) TO THE MOST REMOTE OUTLET IN THE |
| | BUILDING AND / OR SYSTEM PER THE FBC-FUEL GAS |
| | SEC.402.4.1, 402.4.2. |
| | 5) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| | FBC-FUEL GAS CODE SEC.304.1. |
| | 6) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER FBC-FUEL GAS SEC.402.1, 402.4.3 THRU |
| | 402.6. |
| | 7) SUBMIT A DETAIL SHOWING THE TYPE OF VENT, LOCATION, |
| | SIZE, TERMINATION POINT, HEIGHT ABOVE THE ROOF AND |
| | ANCHORING DETAILS OF THE GAS VENT(S) PER FBC-FUEL GAS |
| | SECS. 502 THRU 505. |
| | 8) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, AND FBC- FUEL GAS |
| | CODE SEC. 402.2, AND 301.3. GAS APPLIANCES SHALL BE |
| | LISTED AND LABELED. THE INSTALLATION MANUALS FOR ALL |
| | GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME |
| | OF INSPECTION. FBC-FUEL GAS CODE SEC.305.1. |
| | 9) EMERGENCY HOOD SHUT DOWN SHUT OFF VALVE SHALL BE |
| | BELOW THE CEILING. THE MANUAL SHUTOFF VALVE SHALL BE |
| | UPSTREAM. UNION TO BE DOWN STREAM OF MANUAL VALVE. NFPA |
| | 96-14. SECS. 10.4.1, 10.4.3, 10.4.4, 10.5.1. |
| | 10) SUBMIT THE APPLICABLE SIZING TABLES USED TO SIZE |
| | THE GAS SYSTEM OR PLACE A NOTE ON THE PLANS/DRAWINGS |
| | SPECIFYING WHICH SIZING TABLE(S) FROM THE FBC-FUEL GAS |
| | CODE OR OTHER STANDARD THAT WERE USED IN THE DESIGN OF |
| | THIS GAS SYSTEM. REFER TO THE FBC-FUEL GAS SECS. 401.4, |
| | 401.8, 402.3, AND TABLES 402.4 (1) THRU 402.4 (37). |
| | 11) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS |
| | ( IF APPLICABLE). A LISTED SHUTOFF VALVE SHALL BE |
| | INSTALLED IMMEDIATELY AHEAD OF EACH MP REGULATOR AND A |
| | UNION SHALL BE INSTALLED WITHIN ONE FOOT UPSTREAM OR |
| | DOWNSTREAM OF EACH REGULATOR. FBC-FUEL GAS SEC.409.4, |
| | 410.2 (7). |
| | 12) ) SUBMIT MANUFACTURER?S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS |
| | (IF APPLICABLE). REGULATORS INSTALLED ON THE EXTERIOR |
| | OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. IDENTIFY ON THE SPECIFICATION SHEETS |
| | WHICH MODEL REGULATOR IS BEING INSTALLED AND THE |
| | ORIFICE SIZE TO ENSURE THE REGULATOR CAN ACCOMMODATE |
| | THE BTU LOAD THROUGH THE REGULATOR. FGC SEC.410.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |