| Plan Review Notes For Permit 21070162 |
| Permit Number |
21070162 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-09-21 10:43:09 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | | THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT | | | BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND | | | PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | | FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC | | | SEC. 105.1. | | | | | | 67. NOTE: YOU MAY CHOOSE TO HAVE A GAS REVIEW DONE THIS | | | TIME AND PROVIDE AN ISOMETIC WITH SPECIFICATION OF NEW | | | EQUIPMET, PIPE SIZES, REGUATOR SPECIFICATIONS. THIS | | | WILL HAVE THE GAS APPROVE FOR A SUB PERMIT, OR IF YOU | | | DECIDED NOT TO ADDRESS THESE COMMENTS, A NOTE HAS BEEN | | | PUT ON THE PLANS FOR A GAS HEATER (A SEPARATE PERMIT BY | | | A LICENSED CONTRACTOR FOR THE GAS SYSTEM). AN N WILL BE | | | PUT ON THIS REVIEW, WHICH STANDS FOR NOT REQUIRED, BUT | | | A SUB PERMIT WON'T BE ISSUED ONCE A REVIEW IS DONE FOR | | | THAT SUB PERMIT, SO PLEASE BE ADVISED ON THIS | | | PROCEDURE. | | | |
|