| 2021-08-19 14:34:05 | 1) SUBMIT COPIES OF THE MANUFACTURER'S SPECIFICATION |
| | SHEETS / INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC- FUEL GAS CODE SEC. 402.2, AND 301.3.GAS APPLIANCES |
| | SHALL BE LISTED AND LABELED. THE INSTALLATION MANUALS |
| | FOR ALL GAS APPLIANCES / EQUIPMENT SHALL BE ONSITE AT |
| | THE TIME OF INSPECTION. FBC-FUEL GAS CODE SEC.305.1. |
| | 2) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| | FBC-FUEL GAS CODE SEC.304.1. WHERE COMBUSTION AIR IS |
| | PROVIDED BY THE BUILDING?S MECHANICAL VENTILATION |
| | SYSTEM, THE SYSTEM SHALL PROVIDE THE SPECIFIED |
| | COMBUSTION AIR RATE IN ADDITION TO THE REQUIRED |
| | VENTILATION AIR. FBC-FUEL GAS SEC.304.9.3 OR FBCR |
| | G2407.9.3. |
| | 3) SUBMIT COPIES OF THE APPLICABLE SIZING TABLES USED |
| | TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| | PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| | THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| | DESIGN OF THIS GAS SYSTEM. REFER TO THE FBC-FUEL GAS |
| | SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1) THRU |
| | 402.4 (37). |
| | 4) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED & ALL |
| | PIPE SIZES ON THE GAS RISER .WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 5) EMERGENCY HOOD SHUT DOWN SHUT OFF VALVE SHALL BE |
| | BELOW THE CEILING. THE MANUAL SHUTOFF VALVE SHALL BE |
| | UPSTREAM. UNION TO BE DOWN STREAM OF MANUAL VALVE. NFPA |
| | 96-14. SECS. 10.4.1, 10.4.3, 10.4.4, 10.5.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |