| Date |
Text |
| 2021-09-11 12:08:11 | PLAN REVIEW / NFIP |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/SFP306 |
| | INSPECTOR BN4338 |
| | BUILDING OFFICIAL BU1635 |
| | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | CITY ORDINANCE NO. 4658-16 |
| | |
| | 2ND REVIEW |
| | |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | 1. SECTION C2 (E) LOWEST ELEVATION OF MACHINERY OR |
| | EQUIPMENT SERVICING THE BUILDING SHALL BE AT OR ABOVE |
| | THE DESIGN FLOOD ELEVATION (DFE) OF 8.0' NAVD. |
| | |
| | 2. SECTION D-COMMENTS - THE INFORMATION PROVIDE IS NOT |
| | RELEVANT. SEE BELOW FOR THE TYPICAL NOTES ENTERED IN |
| | THE COMMENTS SECTION: |
| | |
| | 2A. PER EC INSTRUCTIONS FOR SECTION A5 - "THE METHOD |
| | USED TO DETERMINE THE LATITUDE AND LONGITUDE WAS |
| | OBTAINED USING GOOGLE EARTH" |
| | |
| | 2B. PER SECTION D COMMENTS "THE LOWEST ELEVATION OF |
| | EQUIPMENT HVAC CU-1 AND CU-2 SHALL COMPLY WITH |
| | SECTIONC2(E)" |
| | |
| | 2C. "THE TOP OF SLAB FOR THE PROPOSED GENERATOR ON SITE |
| | PLAN A-0.1 SHALL COMPLY WITH SECTION C2(E)" |
| | |
| | TBD - SEE EC INSTRUCTIONS FOR SECTION A9.B-D FLOOD |
| | OPENINGS "IF THE INTERIOR GRADE ELEVATION IS USED, NOTE |
| | THIS IN THE COMMENTS SECTION" |
| | |
| | 3. PER EC INSTRUCTIONS FOR A9.B-D - ENGINEERED FLOOD |
| | VENTS - PROVIDE A COPY OF THE INDIVIDUAL ENGINEERED |
| | FLOOD OPENING CERTFICATION (PRODUCT APPROVAL) OR |
| | PROVIDE A COPY OF THE EVALUATION REPORT FROM THE |
| | INTERNATIONAL CODE COUNCIL EVALUATION SERVICE (ICC-ES). |
| | |
| | |
| | NOTICE: |
| | |
| | PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARD AREA |
| | (SFHA). IT IS LOCATED IN ZONE AE WITH BASE FLOOD |
| | ELEVATIONS OF 6.0 FEET NAVD. DESIGN FLOOD ELEVATION |
| | SHALL BE NOT LESS THAN 8.0 FEET NAVD. |
| | |
| | 3 ELEVATION CERTIFICATES (EC) ARE REQUIRED |
| | |
| | A CONSTRUCTION DRAWING ELEVATION CERTIFICATE IS |
| | REQUIRED AT TIME OF PERMIT APPLICATION. |
| | |
| | A BUILDING UNDER CONSTRUCTION ELEVATION CERTIFICATE IS |
| | REQUIRED AT PLACEMENT OF 1ST FLOOR. |
| | SUBMIT TO BUILDING DEPARTMENT FOR REVIEW. |
| | |
| | A FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS |
| | REQUIRED AND SHALL BE SUBMITTED FOR REVIEW AND APPROVAL |
| | PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. |
| | NOTE: YOU MAY SUBMIT THIS EC FOR REVIEW AFTER FINAL |
| | GRADE AND PLACEMENT OF EQUIPMENT SERVICING THE |
| | BUILDING. |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |