Plan Review Notes
Plan Review Notes For Permit 21061171
Permit Number 21061171
Review Stop P
Sequence Number 2
Notes
Date Text
2021-11-09 17:09:3211/09/21 2ND COMMERCIAL POOL REVIEW**DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
  
 1. DONE AND CLEAR
  
 2. UNDER LS-03, WOULD YOU PLEASE PROVIDE THE DISTANCE
 FOR THE ENTRY DOORS OF THE RESTROOMS THAT SHALL BE
 LOCATED WITHIN A 200-FOOT HORIZONTAL RADIUS OF THE
 NEAREST WATER'S EDGE PER THE 2020 FBC SEC. B
 454.1.6.1SANITARY FACILITIES (EXCEPTION).
  
 3. DONE AND CLEAR
  
 4. DONE AND CLEAR
  
 5. DONE AND CLEAR
  
 6.SECOND REQUEST; SP-102: PROVIDE COMPLETE PLANS AND
 SPECIFICATIONS FOR INSTALLATION OF THE RINSE SHOWER
 (MDF MODEL 500)- SECTION 107.2.1 WPB & 606.2 FBC P.
  
 NEW COMMENTS;
 A. ON SHEET P-102A SHOWS A DIFFERENT LAYOUT FOR THE
 SHOWER IN S DIFFERENT LOCATION THAN A-102A. WOULD YOU
 PLEASE CLARIFY PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 B. COULD NOT FIND THE SPECIFICATIONS FOR MDF MODEL 500.
 WOULD YOU PLEASE RESUBMIT PER THE WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 C. ON SHEET P-102A, A FLOOR DRAIN IS SHOWN, BUT IF IT
 IS EXPOSED TO THE OUTSIDE, IT CANNOT GO INTO THE
 SANITARY SYSTEM PER CITY ORDNANCE SEC. 90-126(5). -
 PROHIBITIONS AND LIMITATIONS OF DISCHARGE.
  
 D. THE RUNOFF OF THE SHOWER NEEDS TO GO INTO A LOCATION
 THAT CAN BE COLLECTED AND DISPOSED OF. WOULD YOU PLEASE
 PROVIDE A DRAIN TO THE STORM DRAIN OR A SAFE DRAINING
 PLACE WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 C. FAIR HOUSING ACT MANUAL COMPLIANCE: SHOW THE
 ACCESSIBLE ROUTE TO THE RINSE SHOWER AND PROVIDE
 ENLARGED DRAWINGS AND CUTS SHOWING THE LOCATIONS AND
 HEIGHTS OF SHOWERHEADS AND CONTROLS, AND COMPLIANCE
 DETAILS FOR SPACE ALLOWANCE, REACH RANGES, AND CONTROLS
 AND OPERATING MECHANISMS- REFER TO PAGES 2.10- 2.12 OF
 THE MANUAL.
  
 THE MDF MODEL 500 IS NOT THE ONE SHOWN IN DETAIL # 2 ON
 SHEET A-253. WOULD YOU PLEASE PROVIDE A DETAIL THAT HAS
 THE INFORMATION REQUESTED PER THE WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 7. ON THE DETAIL, SP-108 SHOWS WHAT APPEARS TO BE THE
 REQUIRED MAKEUP WATER CONTROLLER (AUTO-FILL) AT THE
 COLLECTOR TANK. WOULD YOU PLEASE NOTE THAT SEPARATE
 PERMITS ARE NEEDED TO INSTALL THE DEVICES- SECTION
 105.1 WPB?
  
 8. ON SHEET SP-105, IT SHOWS NO LOCATIONS OF ALL ITEMS
 IN THE PIPING LEGEND- E, F, G, H, I, J, K, & L. WOULD
 YOU PLEASE REMOVE PER THE WPB AMENDMENTS TO THE FBC
 SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 9. DONE AND CLEAR
  
 10. DONE AND CLEAR
  
 11. DONE AND CLEAR
  
 12. DONE AND CLEAR
  
 13. DINE AND CLEAR
  
 14. DONE AND CLEAR
  
 15. SP-108 & 301: ON THE PUMP CURVE FOR THE SELECTED
 PUMP AND SUBMIT MANUFACTURER'S SPECIFICATIONS- SECTION
 454.1.6.5.4 FBC B.
  
 NEW COMMENT; WOULD YOU PLEASE IDENTIFY ON THE PUMP
 CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP BEING
 INSTALLED ON THIS POOL, THIS IS NEEDED TO CONFIRM THE
 MAXIMUM SYSTEM FLOW FROM THE TDH CALCULATIONS PER THE
 ANSI/APSP/ICC 7 - 2015 SECS. 4.4.9, 4.4.9.1.
  
 16. SECOND REQUEST; WOULD YOU PLEASE SUBMIT THE
 MANUFACTURER'S SPECIFICATIONS FOR RECIRCULATION AND
 TREATMENT EQUIPMENT, INCLUDING THE SAND FILTER,
 CHEMICAL STORAGE TANKS, CHEMICAL CONTROLLER, AND
 FEEDERS SHOWING THE EQUIPMENT CONFORMS WITH REQUIRED
 STANDARDS NSF/ANSI STANDARD 50, CIRCULATION SYSTEM
 COMPONENTS, AND RELATED MATERIALS FOR SWIMMING POOL,
 SPAS/HOT TUBS, DATED APRIL 2007- SECTION 454.1.6.5.1
 FBC B.
  
 17. THE GRATE SUBMITTAL SUPPLIED DOES NOT COMPLY WITH
 THE 2017 FBC SEC 454.1.6.5.10.2. MAIN DRAIN
 COVERS/GRATES SHALL COMPLY WITH THE REQUIREMENTS OF
 ANSI/APSP 16 AND THE WATER VELOCITY OF THIS SECTION.
 18. SP-301: INCLUDE THE HOSE BIB IN THE EQUIPMENT
 SCHEDULE- SECTION 608.15.4.2 FBC P.
  
 IT SAYS TO REFER TO P-601 ON RESPONSE, AND THIS SHEET
 IS NOT PROVIDED. WOULD YOU PLEASE PROVIDE PER THE WPB
 AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS?
  
 19) SP-108, 301: THE GAS WATER HEATER INSTALLATIONS,
 INCLUDING THE GAS PIPING, COMBUSTION AND VENTING PLANS,
 AND EQUIPMENT ROOM VENTILATION SYSTEM, SHALL BE
 REVIEWED UNDER SEPARATE PERMITS AND PLAN SUBMITTALS-
 SECTION 105.1, 107.2.1, AND 107.3.5.3.1 WPB. PLEASE
 NOTE THAT THE EQUIPMENT ROOM VENTILATION SHALL COMPLY
 WITH THE FBC BUILDING AND MECHANICAL CODES.
  
 PER THE RESPONSE, P-101A HAS NO VERBIAGE OF A SEPARATE
 PERMIT REQUIRED FOR GAS AND SHEET M-101A, NOT SUPPLIES.
 WOULD YOU PLEASE PROVIDE PER THE WPB AMENDMENTS TO THE
 FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 20. DONE AND CLEAR
  
 21. DONE AND CLEAR
  
 22. NEW COMMENT: ON SHEET SP-103 THE ACCESSIBLE REST
 ROOM SHOWS NO ELEVATION TO ENTER THE RESTROOM BUT ON
 SP-1.01. SP-1.02, A-1.02A, A-1.02B IT SHOWS TWO STEPS.
 WOULD YOU PLEASE CLARIFY PER THE WPB AMENDMENTS TO THE
 FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  
  