| Date |
Text |
| 2021-06-29 17:40:03 | 06/29/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. THE TOTAL DYNAMIC HEAD CALCULATIONS FOR THE MAXIMUM |
| | SYSTEM FLOW HAVE A HEATER AND A CHLORINATOR. THE TDH |
| | CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS |
| | THAT ARE TO BE INSTALLED. PLEASE CORRECT PER THE WPB |
| | AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | 2. PLEASE SHOW ON THE POOL PUMP CURVE. IDENTIFY ON THE |
| | PUMP CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP |
| | BEING INSTALLED ON THIS POOL. THIS IS NEEDED TO CONFIRM |
| | THE MAXIMUM SYSTEM FLOW FROM THE TDH CALCULATIONS PER |
| | THE ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. |
| | INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR THE |
| | PUMP BEING INSTALLED ON THIS SYSTEM PER THE WPB AMEND. |
| | TO FBC SEC. 107.2.1. |
| | |
| | 3. PLEASE SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR |
| | THE HEATER AND CHLORINATOR IF USED PER THE WPB |
| | AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | 4. ON-PAGE ONE, UNDER THE NOTES, AN OVERFLOW LINE IS |
| | MENTIONED. IS THAT A POOL FILL, AND IF SO, IT WILL |
| | REQUIRE A PVB BACKFLOW. PLEASE CLARIFY PER THE WPB |
| | AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |