2021-06-22 13:20:3805/12/21 1ST LP GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE PROVIDE A RISER DIAGRAM REQUIRED PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.3.5.3 (12) RESIDENTIAL
 GAS. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED,
 ALL PIPE SIZES, AND). IN ADDITION, SHOW ON THE
 ISOMETRIC DRAWING THE LENGTH OF ALL CUT SECTIONS OF
 PIPE PER 2020 FBC RES. SECS. G2413.4.1, G2413.4.2.
 PLEASE SHOW AND LABEL ALL UNIONS IN FRONT OF REGULATOR
 1? OF EITHER SIDE, DRIP LEG, AND SHUTOFF VALVE PER THE
 2020 FBC RES. SEC G2421.2. PROVIDE THE TYPE OF GAS AND
 PRESSURE PER THE WPB AMENDMENTS TO FBC SEC.107.2.1.
  
 2. PLEASE SUBMIT MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR THE GENERATORS TO VERIFY
 COMPLIANCE WITH 2017 FBC FG SEC.305.1 OR 2017 FBC RES.
 SEC. G2408.1.
  
 3. THE GENERATOR EXHAUST IS REQUIRED TO BE 10 FEET FROM
 OPENINGS INTO A BUILDING. FBC-R303.5.1 INTAKE OPENINGS.
 MECHANICAL AND GRAVITY OUTDOOR AIR INTAKE OPENINGS
 SHALL BE LOCATED NOT LESS THAN 10 FEET (3048 MM) FROM
 ANY HAZARDOUS OR NOXIOUS CONTAMINANTS, SUCH AS VENTS,
 CHIMNEYS, PLUMBING VENTS, STREETS, ALLEYS, PARKING
 LOTS, AND LOADING DOCKS. PLEASE SHOW ON PLANS PERT THE
 WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 4. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP
 TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF
 THE TANK FROM THE EXTERIOR BUILDING WALL AND ADJACENT
 PROPERTY LINES, THE DISTANCE OF THE TANK FROM ALL
 SOURCES OF IGNITION, OTHER CONTAINERS, BUILDINGS, AND
 THE LOCATION OF ANY BUILDING OPENINGS BELOW THE RELIEF
 VALVE OF THE TANK PER THE NFPA 58, TABLE 3-2.2.2.
  
 5. THE SUBMIT DETAILS FOR CATHODIC PROTECTION HAS SIZE
 (LBS.) BUT HOW MANY IN NUMBERS OF MAGNESIUM BAG(S),
 WIRE SIZE OF ANODE CABLE AMOUNT AND AMOUNT OF WATER TO
 ACTIVATE IT.
  
 6. THE LP TANK ANCHORING DETAIL IS SIGNED AND SEAL BUT
 THE CITY REQUIRES THE ORIGINAL OR A
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER TO BE
 USED IN ELECTRONIC PLAN REVIEW - OR - IF YOUR ENGINEER
 DOES NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE -
 PLEASE DROP OFF THE ORIGINAL SIGNED AND SEALED DOCUMENT
 ALONG WITH A "PLAN REVIEW REQUEST FORM" EXPLAINING THE
 REASON FOR SUBMITTING THE DOCUMENT OR DRAWINGS. THE
 PLAN REVIEW REQUEST FORM CAN BE OBTAINED BY EMAILING
 [email protected] AND ASKING FOR THE FORM.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved