2021-12-13 15:35:3012/10/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. ON SHEET A0.04;
  
 A. UNDER CODE REFERENCES, THE FAIR HOUSING GUIDELINE IS
 MOTIONED, BUT ON PAGE A6.51, IT SHOWS THAT REUSING THE
 DESIGN MANUAL, WOULD YOU PLEASE ADD THE MANUAL TO THE
 CODE REFERENCE PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 B. WE DO NOT GO BY THE ADA 2010 OR THE INTERNATIONAL
 2018 CODE. WOULD YOU PLEASE REMOVE PER THE WPB
 AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS?
  
 C. WOULD YOU PLEASE PROVIDE THE ANSI STANDARD AND YEAR
 FOR COMMON IN CONJUNCTION WITH THE HUD REGULATION FOR
 THE SAFE HARBOR BEING IMPLEMENTED IN THESE PLANS PER
 THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION
 ON CONSTRUCTION DOCUMENTS.
  
 2. ON SHEET A0.11;
  
 A. THE GRAB BAR SHALL BE INSTALLED IN A HORIZONTAL
 POSITION PER THE 2020 FBC ACC SEC. 609.4.
  
 B. THE BOTTOM ON THE LAV SHALL BE A MINIMUM OF 27" KNEE
 CLEARANCE PER THE 2020 FBC SEC. 306.3.
  
 C. ON DETAIL FOUR, THE PARTITIONS TO PROVIDE PRIVACY
 SHALL EXTEND NOT LESS THAN 60 INCHES ABOVE THE FINISHED
 FLOOR SURFACE PER THE 2020 FBC SEC. P 405.3.5 URINAL
 PARTITIONS.
  
 D. THERE IS A NOTE FOR THE RESIDENTIAL UNITS, AND IT
 SEEMS THAT THE FHA AND ACC ARE MENTIONED ON THIS PAGE.
 WOULD YOU PLEASE CORRECT AND CLARIFY WHICH SAFE HARBOR
 IS BEING DESIGNED ON THE ADA PAGES PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 3. ON SHEETS A0.11-13, IT SAYS ADA. WE GO BY THE
 FLORIDA ACCESSIBLY CODE; FOR CLARITY, PLEASE CONSIDER
 RENAMING THE ADA ACCESSIBILITY PER WPB AMENDMENTS TO
 THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 4. ON SHEET, A0.13;
  
 A. THERE IS INFORMATION ON THE SHOWER THAT IS NOT BEING
 USED. WOULD YOU PLEASE DELETE OR STARCH A LINE THROUGH
 THEM FOR FIELD CLARITY PER THE WPB AMENDMENTS TO THE
 FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 B. ON THE TOILET, IT HAS SIX INCHES FROM THE WALL, AND
 ON THE FLORIDA ACCESSIBILITY CODE, IT IS MEASURED FROM
 THE CENTER OF THE WATER CLOSET, AND THE DIMENSION FOR
 THE TOILET MAY VARY 2" PER THE 2020 FBC SEC. FIGURE
 604.5.2REAR WALL GRAB BAR WATER CLOSETS.
  
 C. GRAB BARS SHALL BE MEASURED TO THE TOP OF THE
 GRIPPING SURFACE PER THE 2020 FBC ACC SEC. 609.4.
  
 D. THE GRAB BAR SHALL BE INSTALLED IN A HORIZONTAL
 POSITION PER THE 2020 FBC ACC SEC. 609.4.
  
 E. FLUSH CONTROLS ARE SHOWN ON THE WRONG SIDE AND SHALL
 BE LOCATED ON THE OPEN SIDE OF THE WATER CLOSET PER THE
 2020 ACC SEC. 604.6 FLUSH CONTROLS.
  
 5. ON SHEET A2.40 FOR UNITS 4.4.S-1.M AND 4.11.A-1C.M,
 IT DOES NOT SHOW THE CLEAR FLOOR SPACE LIKE ON A A2.40,
 4.4.S-1.M FOR THE ACCESSIBILITY UNIT. WOULD YOU PLEASE
 CORRECT PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 6. ON SHEET A6.01, .02, .03 .04, .05, .11, .12, .13,
 .14, .15, .16, .17, 18, .21, .22, .31, .32, .33, .34,
 .35, .36, .37 AND .38 WOULD YOU LABEL AS TO THE
 CORRESPONDING FHA TYPE A OR B PER THE DESIGN MANUAL IF
 APPLICABLE, CLARIFY PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 7. ON SHEETS A6.03, .04, .21, .22, AND .36, THE DOOR IS
 SWINGING INTO THE CLEAR FLOOR SPACE, AND DOES THIS DOOR
 NEED TO SWING OUT OF THE RESTROOM. WOULD YOU PLEASE
 CLARIFY PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 8. ON SHEETS A6.06, .07, .19, AND .39, THEY ARE
 ACCESSIBLE UNITS, BUT THERE IS A NOT FOR FHA LEGEND.
 WOULD YOU PLEASE CORRECT PER THE WPB AMENDMENTS TO THE
 FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 9. ON SHEET A6.32, IT HAS A SHOWER, AND A THIRD WALL IS
 NOT PRESENT. WOULD YOU PLEASE CLARIFY IF IT IS NEEDED
 FOR GRAB BARS ON THE FHA STANDARDS PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 10. ON SHEET A7.10 AND A 7.11 19;
  
 A. THE BARS SHALL BE INSTALLED IN A HORIZONTAL POSITION
 PER THE 2020 FBC ACC SEC. 609.4.
  
 B. THE TOILET PAPER DISPENSERS SHALL BE 7" INCHES
 MINIMUM AND 9" INCHES MAXIMUM IN FRONT OF THE WATER
 CLOSET MEASURED TO THE CENTERLINE OF THE DISPENSER PER
 THE 2020 FBC ACC SEC. 604.7.
  
 C. WOULD YOU PLEASE IDENTIFY THE RESTROOM AS ACCESSIBLE
 PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 11. ON SHEET P100 UNDER PLUMBING EQUIPMENT SCHEDULE, IT
 HAS AN ASSE, AND THE TEMP OF 110 IS MISSING. WOULD YOU
 PLEASE ADD PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 12. ON SHEET P3.01.
  
 A. THE TUB AND TOILET ARE NOT VENTED CORRECTLY AND OVER
 EIGHT FEET TO THE POINT OF VENT PER THE 2020 FBC TABLE
 909.1MAXIMUM DISTANCE OF FIXTURE TRAP FROM VENT.
  
 B. THE KITCHEN SINS HAVE NO DRAIN CONNECTION. WOULD YOU
 PLEASE PROVIDE PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 13. ON SHEET P3.03;
  
 A. PLEASE PROVIDE HOW THE PIPE ON THE 1ST FLOOR WILL BE
 PROTECTED FROM VEHICULAR TRAFFIC PER THE 2020 FBC P
 305.6PROTECTION AGAINST PHYSICAL DAMAGE.
  
 B. THE PUMP IN THE ELEVATOR HAS NO DETAIL. WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 C. PUMPS CONNECTED TO THE DRAINAGE SYSTEM SHALL CONNECT
 TO A BUILDING SEWER, BUILDING DRAIN, SOIL STACK, WASTE
 STACK, OR HORIZONTAL BRANCH DRAIN PER THE 2020 FBC SEC.
 712.3.5 PUMP CONNECTION TO THE DRAINAGE SYSTEM.
  
 14. ON SHEET P3.04;
  
 A. THE GAS REQUIRES A SEPARATE PERMIT. WOULD YOU PLEASE
 PROVIDE PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS?
  
 B. PE PIPE IS ALLOWED UNDERGROUND. WOULD YOU PLEASE
 PROVIDE THE TYPE OF MATERIAL THAT COMPLIES WITH THE
 2020 FBC G 403.1?
  
 C. NEED A SHUTOFF VALVE AND HARD CAP FOR FUTURE RANGE
 SHOW ON GAS ISOMERIC P-1 APPLIANCE SHUTOFF 2020 FBC FG
 SEC. 409.5.
  
 D. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2020 FBC FG
 SECS. 402.4.1, 402.4.2.
  
 15. ON SHEET P3.08, THE DUAL CHECK VALVE WILL REQUIRE A
 REDUCED PRINCIPAL ZONE VALVE TO PREVENT CONTAMINATION
 FROM NONPOTABLE LIQUIDS PER 2020 FBC TABLE
 608.1APPLICATION OF BACKFLOW PREVENTERS.
  
 16. ON SHEETS P3.09 AND P3.10, THE NUMBER IS IN THE
 WRONG ORIENTATION. WOULD YOU PLEASE CORRECT PER THE WPB
 AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS?
  
 17. ON SHEETS P3.11 AND P3.12, THERE ARE HOSE BIBS IN
 THE CEILING. WOULD YOU PROVIDE A DETAIL SHOWING THE
 GATE VALVE, HOW IT IS SECURED, AND WHAT PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 18. ON SHEET P4.01 AND ANY THAT APPLY WHICH ARE
 SIMILAR,
  
 A. THE WASHING MACHINE SHUT-OFF VALVES SHALL BE
 ACCESSIBLE WITHOUT MOVING THE UNIT AND WITHIN REACH PER
 THE 2020 FBC SEC. P 606.3 ACCESS TO VALVES.
  
 B. THE COMPLETE OPEN VALVE IS NOT SHOWN ON THE WATER
 HEATER HOT SIDE, SHOW IT OR GIVE REFERENCE TO THE PAGE
 THAT CORRESPONDS TO THAT DETAIL PER THE WPB AMENDMENTS
 TO THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 19. ON SHEET P4.05 AND ANY THAT APPLY WHICH ARE
 SIMILAR, THE ICEBOX IS IN A FIRE-RATED WALL. WOULD YOU
 PROVIDE OR NOT ON PLANS WHAT TYPE OR WHAT WILL BE USED
 PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 20. WOULD YOU PLEASE PROVIDE AN ISOMETRIC DRAWING OF
 THE MAIN SANITARY LINES AND THEIR CONNECTIONS PER THE
 WPB AMENDMENTS TO THE FBC SEC. 107.5.1.3 (13)
 COMMERCIAL PLUMBING.
  
 21. WOULD YOU PLEASE PROVIDE AN ISOMETRIC DRAWING OF
 ALL CONDENSATE LINES AND THEIR CONNECTIONS PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.5.1.3 (13) COMMERCIAL
 PLUMBING.
  
 22. WOULD YOU PLEASE PROVIDE AN ISOMETRIC DRAWING OF
 ALL STORM LINES AND THEIR CONNECTIONS PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.5.1.3 (13) COMMERCIAL
 PLUMBING.
  
 23. ON SHEET C4.12, THE BACKFLOW REQUIRES A SEPARATE
 PERMIT. WOULD YOU PLEASE PROVIDE PER THE WPB AMENDMENTS
 TO THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS?
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 WEST PALM BEACH AMENDMENTS 2017 FBC CHAPTER; UPON
 REQUEST.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved