| Date |
Text |
| 2021-08-06 09:45:54 | 1ST REVIEW FBC-2020 PLUMBING |
| | PERMIT- 21060251 |
| | 8/5/2021 |
| | |
| | CODES IN EFFECT: |
| | FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020 |
| | FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION |
| | 2020 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) A1.0, A2.2, P1.1: PROVIDE PLUMBING FIXTURE |
| | CALCULATIONS IN ACCORDANCE WITH TABLE 403.1. PROVIDE A |
| | SCHEDULE THAT INDICATES THE REQUIRED AND PROVIDED |
| | NUMBER OF PLUMBING FIXTURES FOR A BUSINESS OCCUPANCY. |
| | THE CALCULATIONS SHALL INCLUDE THE OCCUPANT LOADS OF |
| | ALL AREAS OUTSIDE OF THE BUILDING THAT ARE USED AS PART |
| | OF THE BUILDING?S DESIGNATED OCCUPANCY INCLUDING THE |
| | VACUUM AREA- SECTION 403.1.4 FBC P. PLEASE NOTE THAT |
| | PLUMBING FIXTURES SHALL BE PROVIDED FOR PATRONS AND |
| | EMPLOYEES OF THE BUSINESS. EMPLOYEE TOILET FACILITIES |
| | SHALL BE SEPARATE OR COMBINED EMPLOYEE AND PUBLIC |
| | FACILITIES- SECTION 403.3 FBC P. PLEASE INCLUDE THE |
| | NUMBER OF PATRONS AND EMPLOYEES IN THE CALCULATIONS. |
| | REVIEW THE FOLLOWING APPLICABLE CODE SECTIONS: |
| | |
| | A) TABLE 403.1 REQUIRES DRINKING FOUNTAINS AND A |
| | SERVICE SINK FOR B OCCUPANCIES WHICH DO NOT APPEAR TO |
| | BE SHOWN ON THE PLUMBING PLANS. |
| | |
| | B) SEPARATE PLUMBING FIXTURES AND FACILITIES SHALL BE |
| | PROVIDED FOR EACH SEX UNLESS THE MAXIMUM OCCUPANT LOAD |
| | IS 25 OR FEWER- SECTION 403.2 (4) FBC P. |
| | |
| | 2) PLEASE NOTE THAT SEPARATE PERMITS ARE REQUIRED FOR |
| | THE POTABLE WATER SERVICE BACKFLOW PREVENTER, |
| | IRRIGATION SYSTEM, AND OIL/WATER SEPARATOR- SECTIONS |
| | 105.1 & 107.2.1 WPB. |
| | |
| | 3) OIL/WATER SEPARATOR: A SEPARATE PERMIT IS REQUIRED |
| | HOWEVER A REVIEW OF THE SYSTEM UNDER THE MAIN PERMIT IS |
| | ALSO REQUIRED. A) PROVIDE AN ENLARGED PIPING DIAGRAM |
| | SHOWING THE LOCATIONS OF CLEANOUTS AND VENTS AS |
| | REQUIRED BY THE MANUFACTURER AND SECTION 1003.9. B) |
| | PROVIDE AN EQUIPMENT SCHEDULE FOR THE INTERCEPTOR ON |
| | THE PLAN AND SUBMIT MANUFACTURER'S SPECIFICATIONS THAT |
| | INDICATE THE LISTING AND LABELING OF THE UNIT- SECTION |
| | 1003.4.2 FBC P. C) PROVIDE SIZING CALCULATIONS PER THE |
| | MANUFACTURER IN ACCORDANCE WITH SECTION 1003.4.2.2- NOT |
| | LESS THAN 6 CU. FT. FOR THE FIRST 100 SQ. FT. OF AREA |
| | TO BE DRAINED PLUS 1 CU. FT. FOR EACH ADDITIONAL 100 |
| | SQ. FT. D) PROVIDE A SITE SPECIFIC, DIMENSIONED |
| | INSTALLATION DIAGRAM SHOWING THE BURIAL DEPTH AND INLET |
| | AND OUTLET LOCATIONS, CLEAN OUT AND SAMPLING PORT |
| | LOCATIONS AND SIZES. PLEASE NOTE A SAMPLING PORT |
| | CONSISTING OF A 4-INCH TWO-WAY CLEANOUT TO BE USED AS A |
| | SAMPLING PORT MAY BE REQUIRED. PLEASE CONTACT THE CITY |
| | OF WEST PALM BEACH UTILITIES DEPT. FOR ADDITIONAL |
| | REQUIRED INSPECTION AND TEST SAMPLING INFORMATION AND |
| | GUIDELINES: FOG COMPLIANCE SPECIALISTS AT 561-822-2065 |
| | OR 561-822-2274 OR EMAIL [email protected]. E) HEAVY DUTY |
| | TRAFFIC LIDS ARE REQUIRED FOR TANK ACCESS OPENINGS- |
| | SECTIONS 305.7 & 1003.10.PLEASE SUBMIT SPECS FOR THE |
| | LIDS. F) ALL SUBMITTALS SHALL BE APPROVED AND STAMP BY |
| | THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE- SECTION |
| | 107.2.1, 107.3.4. WPB. SUBMITTALS MAY BE DEFERRED IN |
| | ACCORDANCE WITH SECTION 107.3.4.1 WPB. |
| | |
| | 4) RECLAIMED WATER SYSTEM- SECTION 107.2.1 WPB AND |
| | 1301.1 & 1304.3 FBC P: A) PROVIDE A COMPLETE PIPING |
| | DIAGRAM THAT SHOWS THE PIPE RUNS FROM THE TANKS TO THE |
| | EQUIPMENT ROOM AND TO THE CONVEYOR. INCLUDE THE |
| | LOCATIONS OF TANK CLEANOUTS, VENTS AND OTHER |
| | APPURTENANCES WHERE REQUIRED BY MANUFACTURER'S |
| | SPECIFICATIONS. B) PROVIDE EQUIPMENT SCHEDULES ON THE |
| | PLANS FOR THE TANKS, AND SUBMIT MANUFACTURER'S |
| | SPECIFICATIONS FOR THE TANKS, THE RECLAIM UNIT, AND THE |
| | PIPING- SECTIONS 1301.9.2, & 1304.3- 1304.1.3. C) |
| | INDICATE HOW THE TANKS WERE SIZED AND PROVIDE |
| | CALCULATIONS. D) PROVIDE SITE SPECIFIC, DIMENSIONED |
| | TANK AND TANK INSTALLATION DIAGRAMS SHOWING ALL |
| | COMPONENTS IF THE TANKS AND BURIAL DEPTHS, WATER INLET |
| | AND OUTLET LOCATIONS ETC.- SECTIONS 1309.3- 1309.7. E) |
| | HEAVY DUTY TRAFFIC LIDS ARE REQUIRED FOR TANK ACCESS |
| | OPENINGS- SECTIONS 305.7 & 1309.6. PLEASE SUBMIT SPECS |
| | FOR THE LIDS. F) ALL SUBMITTALS SHALL BE APPROVED AND |
| | STAMP BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE- |
| | SECTIONS 107.2.1 & 107.3.4. WPB. SUBMITTALS MAY BE |
| | DEFERRED IN ACCORDANCE WITH SECTION 107.3.4.1 WPB. |
| | |
| | 5) CAR WASH SYSTEM: SUBMIT MANUFACTURER'S |
| | SPECIFICATIONS FOR ALL EQUIPMENT LISTED ON SHEET PR7.1 |
| | IN THE EQUIPMENT ROOM AND TUNNEL. PLEASE SUBMIT SHOP |
| | DRAWINGS FOR THE TUNNEL EQUIPMENT INSTALLATIONS- |
| | SECTIONS 107.2.1 AND 107.3.4 WPB. SUBMITTALS MAY BE |
| | DEFERRED IN ACCORDANCE WITH SECTION 107.3.4.1 WPB. A) |
| | PROVIDE A COMPLETE WATER PIPING DIAGRAM OR RISER |
| | DRAWING FOR THE EQUIPMENT ROOM AND WASH TUNNEL. SHOW |
| | LOCATIONS OF POTABLE WATER CONNECTIONS, BACKFLOW |
| | PREVENTERS, VALVES, AND SHUTOFFS FOR WASH EQUIPMENT- |
| | SECTION 107.2.1 & 107.3.5.1.3 WPB. |
| | |
| | 6) VACUUM SYSTEM- SECTION 107.2.1 WPB: A) SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS AND INSTALL MANUALS FOR |
| | ALL EQUIPMENT AND PIPING. B) PROVIDE A PIPING LAYOUT |
| | PLAN THAT SHOWS THE TYPE OF PIPING, PIPE SIZES, AND |
| | PIPING RUNS FROM THE VACUUM ENCLOSURE TO THE STATIONS. |
| | |
| | 7) AIR COMPRESSOR- SECTION 107.2.1 WPB: A) SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS AND INSTALL MANUALS FOR |
| | ALL EQUIPMENT AND PIPING. B) PROVIDE A PIPING LAYOUT |
| | PLAN THAT SHOWS THE TYPE OF PIPING, PIPE SIZES, AND |
| | PIPING RUNS FROM THE COMPRESSOR TO THE EQUIPMENT. |
| | |
| | 8) A4.0- MISSING DETAILS PER FBC ACC: |
| | |
| | A) CLEAR FLOOR SPACE DIAGRAM AND DIMENSION FOR THE |
| | WATER CLOSET- SECTION 604.3. |
| | |
| | B) CLEAR FLOOR SPACE DIAGRAM AND DIMENSION FOR THE |
| | LAVATORY- SECTION 606.2. ADVISORY: PLEASE NOTE THAT |
| | DOORS SHALL NOT SWING INTO THE CLEAR FLOOR SPACES |
| | REQUIRED FOR ACCESSIBLE BATHROOM FIXTURES- SECTION |
| | 603.2.3 EXCEPTION 2. |
| | |
| | C) TURNING SPACE DIAMETER- SECTION 304.3. |
| | |
| | D) SHOW THE HEIGHT OF THE MIRROR FROM THE FINISHED |
| | FLOOR TO THE REFLECTIVE SURFACES SECTION 603.3 |
| | |
| | E) SHOW THE HEIGHTS OF THE GRAB BARS FOR THE FINISHED |
| | FLOORS TO THE TOPS OF THE GRIPPING SURFACES- SECTION |
| | 609.4. |
| | |
| | F) SHOW THE DIMENSIONS FOR THE TOILET REAR GRAB BAR |
| | FROM THE CENTER OF THE TOILET PER FBC 604.5.2 REAR |
| | WALL. THE REAR WALL GRAB BAR SHALL BE 36 INCHES (915 |
| | MM) LONG MINIMUM AND EXTEND FROM THE CENTERLINE OF THE |
| | WATER CLOSET 12 INCHES (305 MM) MINIMUM ON ONE SIDE AND |
| | 24 INCHES (610 MM) MINIMUM ON THE OTHER SIDE. |
| | |
| | G) KNEE AND TOE CLEARANCES FOR THE LAVATORIES- SECTION |
| | 606.2 & FIGURES 306.2 & 306.3. |
| | |
| | H) SHOW THE LOCATIONS OF THE DRINKING FOUNTAINS AND |
| | INDICATE COMPLIANCE WITH SECTION 307.2 PROTRUSION |
| | LIMITS. |
| | |
| | 9) P1.1: PROVIDE A LINE SYMBOL FOR THE RECLAIMED WATER |
| | PIPING AND SHOW THE PIPE RUNS INTO THE EQUIPMENT ROOM- |
| | SECTION 107.2.1 WPB. |
| | |
| | 10) P1.1: PROVIDE THE PIPE SLOPES- TABLE 704.1 FBC P. |
| | |
| | 11) P1.1 & P4.1: THE PLANS SHOW ONLY ONE OF THE TWO |
| | DRAIN LINES FROM THE TUNNEL PITS DISCHARGING INTO THE |
| | OIL/WATER SEPARATOR- SECTION 1003.4.2 FBC P. |
| | |
| | 12) P1.1 & P4.1: SHOW THE PIPING RUN FROM THE TRENCH |
| | DRAIN BY THE TUNNEL EXIT. PROVIDE A SYMBOL TO IDENTIFY |
| | THE TYPE OF PIPING- SANITARY, STORM, OR RECLAIMED- |
| | SECTION 107.2.1 WPB. |
| | |
| | 13) P1.1 & P4.1: A MINIMUM OF ONE VENT THROUGH THE ROOF |
| | SHALL BE PROVIDED FOR THE EQUIPMENT TRENCH DRAIN/PIT |
| | DRAIN SYSTEM- SECTION 904.1 FBC P. REFER TO SECTION |
| | 915.2.5 THE FIXTURE BRANCH OR FIXTURE DRAIN SHALL |
| | CONNECT TO THE COMBINATION WASTE AND VENT WITHIN A |
| | DISTANCE SPECIFIED IN TABLE 909.1- NOT TO EXCEED 12 FT |
| | FOR A 3-INCH DRAIN. |
| | |
| | 14) P1.1 & P4.1: REVISIONS TO THE PLAN BASED ON COMMENT |
| | #1 WILL REQUIRED REVISED DRAINAGE SYSTEM DRAWINGS- |
| | SECTIONS 107.2.1 & 107.3.5.1.3 WPB. |
| | |
| | 15) P2.1, P5.1 & P6.1 WATER HEATER: PLEASE SHOW THE |
| | LOCATIONS OF THE THERMAL EXPANSION TANK, RECIRCULATION |
| | PUMP, CHECK VALVES, DRAIN PAN, PAN DRAIN LINE RUN AND |
| | DISCHARGE LOCATION- SECTIONS 502, 607.2 & 607.3 FBC P. |
| | INDICATE THE EFFICIENCY RATING OF THE UNIT PER TABLE |
| | C404.1 FBC EC AND SUBMIT MANUFACTURERS SPECIFICATIONS |
| | AND INSTALLATION MANUAL- SECTION 502.1. |
| | |
| | 16) P2.1, P5.1, PR7.2: PROVIDE THE TYPE OF BACKFLOW |
| | PREVENTER TO BE INSTALLED AT THE WATER DISTRIBUTION |
| | ENTRANCE TO THE EQUIPMENT ROOM- SECTION 608.3 FBC P. |
| | REVISE SHEETS P2.1 & P5.1 TO SHOW THE EXACT LOCATION OF |
| | THE POTABLE WATER LINE CONNECTION TO THE WASH EQUIPMENT |
| | AS SHOWN ON PR7.2. PROVIDE A BACKFLOW PREVENTER |
| | ASSEMBLY AT THIS LOCATION AND INDICATE THE TYPE- |
| | SECTION 608.3. THIS SYSTEM SHALL BE COMPLETELY ISOLATED |
| | FOR THE POTABLE WATER SUPPLY AND THE WATER SUPPLY TO |
| | THE PLUMBING FIXTURES IN THE EQUIPMENT ROOM. SHEET |
| | PR7.2 SHOWS INDIVIDUAL BACKUP POTABLE WATER LINES TO |
| | EQUIPMENT. BACKFLOW PREVENTERS WILL BE REQUIRED ON EACH |
| | LINE- SECTION 608.3. |
| | |
| | 17) P2.1, P5.1: HOT WATER IS BEING SUPPLIED TO THE |
| | PUBLIC LAVATORY. PLEASE REFER TO SECTIONS 419.5 AND |
| | 607.1.2 AND INDICATE HOW TEMPERED WATER WILL BE |
| | SUPPLIED TO THE FIXTURE. |
| | |
| | 18) P2.1 & P5.1: REFER TO TABLE C404.5.1 FBC EC- THE |
| | 1/2 -INCH HOT WATER PIPE TO THE LAVATORY SHALL NOT |
| | EXCEED 2FT. FROM THE HOT WATER SOURCE. |
| | |
| | 19) P2.1 & P5.1: INDICATE THE TYPE AND THICKNESS OF HOT |
| | WATER PIPE INSULATION- TABLE C403.2.10 FBC EC. |
| | |
| | 20) P2.1, P5.1 & PR7.2: HOT WATER IS REQUIRED FOR |
| | CLEANSING PURPOSES IN ACCORDANCE WITH SECTION 607.1. |
| | PLEASE CLARIFY HOW HOT WATER IS BEING SUPPLIED TO THE |
| | CAR WASH SYSTEM. |
| | |
| | 20) PR7.2: PLEASE PROVIDE PLUMBING KEY LINE SYMBOLS TO |
| | IDENTIFY THE PIPING IN THE ROOM- SECTION 107.2.1 WPB. |
| | |
| | 21) P3.1 ROOF DRAINAGE- SECTION 1101 FBC P: |
| | |
| | A) PROVIDE THE RAINFALL RATE USED FOR THE CALCULATIONS- |
| | 1106.1. |
| | |
| | B) PROVIDE A BREAKDOWN OF THE CALCULATIONS THAT |
| | INCLUDES THE PARAPET AREAS- 1106.4. |
| | |
| | C) PROVIDE AN ISOMETRIC DRAWING- 1101.2- 1101.8. |
| | |
| | D) VERIFY COMPLIANCE WITH 1107.1 ROOF DESIGN- ROOFS |
| | SHALL BE DESIGNED FOR THE MAXIMUM POSSIBLE DEPTH OF |
| | WATER THAT WILL POND THEREON AS DETERMINED BY THE |
| | RELATIVE LEVELS OF ROOF DECK AND OVERFLOW WEIRS, |
| | SCUPPERS, EDGES OR SERVICEABLE DRAINS IN COMBINATION |
| | WITH THE DEFLECTED STRUCTURAL ELEMENTS. IN DETERMINING |
| | THE MAXIMUM POSSIBLE DEPTH OF WATER, ALL PRIMARY ROOF |
| | DRAINAGE MEANS SHALL BE ASSUMED TO BE BLOCKED. THE |
| | MAXIMUM POSSIBLE DEPTH OF WATER ON THE ROOF SHALL |
| | INCLUDE THE HEIGHT OF THE WATER REQUIRED ABOVE THE |
| | INLET OF THE SECONDARY ROOF DRAINAGE MEANS TO ACHIEVE |
| | THE REQUIRED FLOW RATE OF THE SECONDARY DRAINAGE MEANS |
| | TO ACCOMMODATE THE DESIGN RAINFALL RATE AS REQUIRED BY |
| | SECTION 1106. |
| | |
| | E) IT APPEARS THE EMERGENCY OVERFLOW SCUPPERS HAVE NOT |
| | PLACED IN LOCATIONS THAT WILL ACCOMMODATE ALL AREAS OF |
| | THE ROOF- SECTION 1106.5 FBC P, AND 1503.4.1 & 1503.4.2 |
| | FBC B. |
| | |
| | 22) NUMEROUS REFERENCES TO CIVIL DRAWINGS HAVE BEEN |
| | MADE ON THE PLUMBING PLANS FOR PIPE CONTINUATIONS. |
| | PLEASE PROVIDE THE APPLICABLE WATER, SEWER, AND STORM |
| | DRAINAGE CIVIL PLANS FOR REVIEW- SECTION 107.2.1 WPB. |
| | |
| | 23) NON-POTABLE WATER SIGNAGHE IS REQUIRED IN THE |
| | EQUIPMENT ROOM, HOSE BIB LOCATIONS, AND AT ALL |
| | COMPONENTS OF THE RECLAIMED WATER SYSTEM- SECTIONS |
| | 1301.3 & 13091.9.9 FBC P. PLEASE SHOW SIGN LOCATIONS |
| | AND PROVIDE SIGNAGE DETAILS. |
| | |
| | 24) PLEASE NOTE THAT THE BUILDING PLANS EXAMINER HAS |
| | DETERMINED THAT THE PROPOSED BUILDING IS A FLOOD ZONE |
| | AE12. PLEASE REFER TO SECTION 309.2 FBC P- FOR |
| | STRUCTURES LOCATED IN FLOOD HAZARD AREAS, THE FOLLOWING |
| | SYSTEMS AND EQUIPMENT SHALL BE LOCATED AND INSTALLED AS |
| | REQUIRED BY SECTION 1612 OF THE FLORIDA BUILDING CODE, |
| | BUILDING. PLEASE REFER TO SECTION 1301.9.3.1 FOR |
| | RECLAIMED WATER TANK BALLASTING REQUIREMENT. |
| | 1. WATER SERVICE PIPES. |
| | 2. PUMP SEALS IN INDIVIDUAL WATER SUPPLY SYSTEMS WHERE |
| | THE PUMP IS LOCATED BELOW THE DESIGN FLOOD ELEVATION. |
| | 3. COVERS ON POTABLE WATER WELLS SHALL BE SEALED, |
| | EXCEPT WHERE THE TOP OF THE CASING WELL OR PIPE SLEEVE |
| | IS ELEVATED TO NOT LESS THAN 1 FOOT (305 MM) ABOVE THE |
| | DESIGN FLOOD ELEVATION. |
| | 4. SANITARY DRAINAGE PIPING. |
| | 5. STORM DRAINAGE PIPING. |
| | 6. MANHOLE COVERS SHALL BE SEALED, EXCEPT WHERE |
| | ELEVATED TO OR ABOVE THE DESIGN FLOOD ELEVATION. |
| | 7. OTHER PLUMBING FIXTURES, FAUCETS, FIXTURE FITTINGS, |
| | PIPING SYSTEMS AND EQUIPMENT. |
| | 8. WATER HEATERS. |
| | 9. VENTS AND VENT SYSTEMS. |
| | |
| | EXCEPTION: THE SYSTEMS LISTED IN THIS SECTION ARE |
| | PERMITTED TO BE LOCATED BELOW THE ELEVATION REQUIRED BY |
| | SECTION 1612 OF THE FLORIDA BUILDING CODE, BUILDING FOR |
| | UTILITIES AND ATTENDANT EQUIPMENT, PROVIDED THAT THE |
| | SYSTEMS ARE DESIGNED AND INSTALLED TO PREVENT WATER |
| | FROM ENTERING OR ACCUMULATING WITHIN THEIR COMPONENTS |
| | AND THE SYSTEMS ARE CONSTRUCTED TO RESIST HYDROSTATIC |
| | AND HYDRODYNAMIC LOADS AND STRESSES, INCLUDING THE |
| | EFFECTS OF BUOYANCY, DURING THE OCCURRENCE OF FLOODING |
| | UP TO SUCH ELEVATION. |
| | PLEASE SEE SECTION |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |