| 2021-07-14 06:45:42 | PROVISO ON PLAN PAGE A-1: SEPERATE GAS PERMIT REQUIRED. |
| | CT |
| | |
| | SEPARATE GAS PERMIT |
| | |
| | PLAN REVIEW / FUEL GAS |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/SFP306 |
| | INSPECTOR BN4338 |
| | BUILDING OFFICIAL BU1635 |
| | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | 2017 NEC |
| | |
| | PROVIDE THE FOLLOWING INFORMATION: |
| | |
| | |
| | 1.SUBMIT A GAS PLAN. SHOW THE LOCATION OF ALL PROPOSED |
| | GAS APPLIANCES. WPB AMENDMENTS TO THE FBC SEC. 107.2.1. |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 2. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2017 FBC FUEL GAS RES |
| | SECS. G2413.4.1, G2413.4.2. |
| | SHOW THE DISTANCE FROM THE GAS METER TO THE MOST REMOTE |
| | REGULATOR ON THE SYSTEM. |
| | (LONGEST RUN) |
| | |
| | 3. SUBMIT APPLICABLE GAS TABLES. G2413.3 (402.3)SIZING |
| | AND G2413.4 (402.4)SIZING TABLES AND EQUATIONS. |
| | |
| | 4. SUBMIT MANUFACTURERS SPECIFICATION |
| | SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH 2020 FBC FUEL GAS SEC.305.1 OR |
| | 2020 FBC FUEL GAS RES. SEC. G2408.1. |
| | |
| | 5. SUBMIT LOW PRESSURE GAS REGULATOR SPECIFICATIONS. |
| | 2020 FBC FUEL GAS SEC.305.1 OR 2020 FBC FUEL GAS RES. |
| | SEC. G2408.1. |
| | |
| | NOTICE: REGULATORS SHALL HAVE A UNION INSTALLED WITHIN |
| | 1 FOOT OF EITHER SIDE OF THE REGULATOR FBC FG 410.2 |
| | |
| | NOTICE: REGULATORS SHALL BE LOCATED PER 409.1.3. |
| | |
| | 7. SUBMIT COMBUSTION AIR CALCULATIONS, IF REQUIRED, FOR |
| | THE PROPOSED GAS APPLIANCES. WHERE IS COMBUSTION AIR |
| | PROVIDED BY THE BUILDINGS MECHANICAL VENTILATION |
| | SYSTEM, THE SYSTEM SHALL PROVIDE THE SPECIFIED |
| | COMBUSTION AIR RATE IN ADDITION TO THE REQUIRED |
| | VENTILATION AIR. 2017 FGC SEC.304.9.3 OR 2017 FBC R |
| | G2407.9.3. COMBINED COMBUSTION AIR AND VENTILATION AIR |
| | SYSTEM. |
| | |
| | 8. SUBMIT A SITE PLAN IDENTIFYING THE LOCATION OF THE |
| | PROPOSED GAS METER OR UNDERGROUND TANK. |
| | |
| | |
| | |