| 2021-08-17 10:35:46 | ****CORRECTIONS**** |
| | |
| | PETER E VALENTI |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6673 |
| | |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC R = FBC RESIDENTIAL |
| | |
| | BUILDING REVIEW DENIED: |
| | |
| | 1) WPB AMENDMENTS TO FBC B 109.3, THE CONTRACT VALUE IS |
| | SHOWN AS $15,000.00 DOLLARS. |
| | PLEASE PROVIDE A SIGNED COPY OF THE CONTRACT BY THE |
| | OWNER. |
| | THE VALUE IS TO INCLUDE THE NEW FLOORING AND |
| | UNDERLAYMENT MATERIAL , LABOR REMOVAL OF OLD FLOOR AND |
| | DUMP FEES OVERHEAD AND PROFIT FOR THE WHOLE APARTMENT. |
| | PROVIDE COST BREAK DOWN FOR THE REMODELING OF THE 2 |
| | BATHROOMS, TO INCLUDE LABOR REMOVAL OF OLD FLOOR AND |
| | DUMP FEES OVERHEAD AND PROFIT. |
| | 2) IT APPEARS THE TUBS ARE BEING CHANGED INTO SHOWERS |
| | FOR BOTH BATHROOMS. |
| | 2A) POST TENSION SLAB/ NEW HOLES. THE PLAN IS SILENT AS |
| | IF THE LOCATION OF THE EXISTING TUB DRAIN IS GOING TO |
| | BE REUSED IN THE SAME LOCATION. IF NOT, THEN THE FLOOR |
| | SLAB WILL NEED TO BE X?RAYED TO FIND THE POST TENSION |
| | CHORD LOCATIONS. 107.2.1.2. ADDITIONAL INFORMATION IS |
| | REQUIRED. |
| | |
| | 2B) THROUGH?PENETRATIONS FIRESTOP SYSTEMS (HORIZONTAL |
| | ASSEMBLIES). IF A NEW FLOOR PENETRATION IS MADE FOR THE |
| | FUTURE SHOWER DRAIN, THEN YOU NEED TO SHOW COMPLIANCE |
| | WITH THE 2020 FBC?B SECTION 714.5.1.2. |
| | THROUGH?PENETRATIONS FIRESTOP SYSTEMS (HORIZONTAL |
| | ASSEMBLIES). THROUGH PENETRATIONS SHALL BE PROTECTED BY |
| | A THROUGH PENETRATION FIRESTOP SYSTEM INSTALLED IN |
| | ACCORDANCE WITH ASTM E814 OR UL 1479. THE SYSTEM SHALL |
| | HAVE AN F RATING / T RATING OF NOT LESS THAN 1 HOUR BUT |
| | NOT LESS THAN THE REQUIRED RATING OF THE FLOOR |
| | PENETRATED. |
| | |
| | 3) THE PROPOSED FLOOR PLAN STATES FOR ALL NEW FLOORING |
| | JUST CHANGE FLOOR, THE FLOOR FINISH IS NOT PROVIDED. |
| | 107.2.1.2 ADDITIONAL INFORMATION IS REQUIRED. |
| | |
| | 4) FLOOR INSULATION/ UNDERLAYMENT (FBC?B 2020) FOR |
| | TILE, STONE, MARBLE, VINYL AND WOOD FLOORING ALL NEED |
| | TO HAVE HAD THE SOUND UNDERLAYMENT TESTED FLOOR |
| | ASSEMBLIES TO THE FOLLOWING STANDARDS AND MEET THE |
| | QUALIFICATIONS LISTED UNDER EACH OF THE STANDARDS FOR A |
| | 6 INCH CONCRETE FLOOR ASSEMBLY/ NO DROPPED CEILING: |
| | PLEASE PROVIDE ALL THREE TEST REPORTS FOR TYPE I AND OR |
| | TYPE II BUILDINGS SHOWING COMPLIANCE WITH: |
| | |
| | 4A) FBC?B 2020 1207.3 STRUCTURE?BORNE SOUND. |
| | FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR |
| | BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA |
| | WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION |
| | CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD |
| | TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E?492. |
| | |
| | 4B) FBC?B 2020 1207.2 AIR?BORNE SOUND. WALLS, |
| | PARTITIONS AND FLOOR/CEILING ASSEMBLIES SEPARATING |
| | DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR |
| | SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS |
| | (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR |
| | AIR?BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E |
| | 90. |
| | |
| | 4C) FLAME SPREAD? FBC?B 2020 603.1. EXCEPTION 2. |
| | INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID |
| | DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED |
| | TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. |
| | |
| | FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS |
| | A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL |
| | MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A |
| | MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723. |
| | |
| | LVT & LPT LUXURY VINYL TILE. FLOOR FINISH |
| | CLASSIFICATION AS REQUIRED IN SECTION 804.2 |
| | CLASSIFICATION AND 804.3 TESTING AND IDENTIFICATION OF |
| | THE 2020 FBC?B. |
| | |
| | 5) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | PLEASE NOTE WITH THE LACK OF INFORMATION FOR THIS |
| | REVIEW, SUBSEQUENT REMARKS MAYBE MADE IN THE NEXT |
| | REVIEW CYCLE. |
| | |
| | |
| | |