| Date |
Text |
| 2021-06-24 11:30:46 | 2ND REVIEW |
| | PLUMBING COMMENTS: DENIED |
| | 1.PER WPB FBC 107.2.1, PROVIDE INVERT ELEVATIONS IN |
| | FEET AND INCHES ABOVE THE THIRD FLOOR FINISH FLOOR OF |
| | NEW HORIZONTAL SANITARY BRANCH AT NEW SINK AND AT |
| | CONNECTION TO EXISTING SANITARY. PROVIDE DEVELOPED |
| | LENGTH OF THE SAME (IT APPEARS TO BE APPROXIMATELY 100 |
| | FEET). AT 1/4 INCH PER FOOT FALL/2% SLOPE AS REQUIRED |
| | BY FBC PL 704.1 AND TABLE 704.1 FOR 2 INCH HORIZONTAL |
| | DRAINAGE PIPE, THIS WOULD AMOUNT TO TWO (2) FEET OF |
| | UNIFORM SLOPE. |
| | RESPONSE PROVIDED INDICATES ONE (1) FOOT OF UNIFORM |
| | SLOPE WHICH AMOUNTS TO 1/8 INCH PER FOOT FALL/1% SLOPE. |
| | PER FBC PL 704.1 AND TABLE 704.1, HORIZONTAL DRAINAGE |
| | PIPE SHALL BE 3 INCH SIZE. |
| | |
| | 2. PER WPB FBC 107.2.1, PROVIDE A UL ASSEMBLY FOR NEW |
| | WALL PENETRATION(S) FROM COMMON AREA(S) TO TENANT |
| | SPACE(S). COMPLY WITH FBC CHAPTER 7. |
| | RESPONDED: THE UL ASSEMBLY PROVIDED FOR THE FOR NEW |
| | WALL PENETRATION(S) FROM COMMON AREA(S) TO TENANT |
| | SPACE(S) ON P4.2 IS FOR A CONCRETE WALL. |
| | AD1.1 DEMO PLAN KEY-NOTE 3 DESCRIPTION OF DEMO |
| | INDICATES THE WALL IN QUESTION IS A FRAMED WALL. |
| | A5.1 DETAIL 1 PROVIDES FOR A FRAMED 1 HOUR RATED WALL. |
| | DETAIL 4 INDICATES AN EXISTING CMU WALL. |
| | PER WPB FBC 107.2.1, CLARIFY AND PROVIDE THE ASSEMBLY |
| | THAT ADDRESSES THE WALL IN QUESTION. |
| | |
| | 3.P2.1; NOTE 2: PER WPB FBC 107.2.1, |
| | A) PROVIDE MANUFACTURER SPECIFICATION/INSTALLATION |
| | MANUAL FOR THE ICE MAKER, FILTRATION SYSTEM, COFFEE |
| | MAKER WHICH WOULD INDICATE THEY ARE PROVIDED WITH |
| | INTERNAL BACKFLOW PREVENTION DEVICES. IF EQUIPMENT DOES |
| | NOT MEET THE CRITERIA NOTED, THEN PROVIDE LEAD FREE |
| | BACKFLOW PREVENTION DEVICES TO COMPLY WITH FBC PL |
| | SECTION 608. ADDITIONALLY, IF ANY OF THE EQUIPMENT |
| | REQUIRES DRAINS THEN PROVISION COMPLYING WITH FBC PL |
| | CHAPTERS 7,8,9 AND 10 SHALL BE MADE AND DETAILS |
| | PROVIDED. |
| | B) COMPLIED |
| | |
| | 4. NOT REQUIRED; SEE IBC PLUMBING COMMENTARY DOWN-FEED |
| | PIPES 606.1(5) PROVIDED BY DESIGNER. ALSO SEE FBC PL |
| | CHAPTER 2 DEFINITIONS "WATER PIPE; RISER" |
| | |
| | |
| | 5.COMPLIED |
| | |
| | 6. PER FBC PL 606.2, PROVIDE SEPARATE SHUT OFF VALVE |
| | FOR HOT AND COLD TO FIXTURE AND TO THE TANKLESS WATER |
| | HEATER |
| | RESPONDED: NOT COMPLIANT; SEE REDLINED P4.1 FOR |
| | CLARIFICATION |
| | |