| Date |
Text |
| 2021-10-04 11:03:16 | THE SECOND REVIEW WAS ACCIDENTALLY LOCKED. |
| | |
| | PLAN REVIEW COMMENTS |
| | |
| | 3RD REVIEW: FBC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO, CFM |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE APPRAISAL THAT WAS SUBMITTED DOES NOT SEPARATE |
| | THE IMPROVEMENT VALUE OF THE DETACHED GARAGE APARTMENT |
| | FROM THE MAIN HOUSE. THEY WILL NEED TO BE SEPARATED IN |
| | ORDER TO DOCUMENT THAT THE IMPROVEMENTS TO THE GARAGE |
| | APARTMENT ARE A SUBSTANTIAL IMPROVEMENT OR NOT. |
| | (PREVIOUS COMMENT.) A PORTION OF THE PROPERTY IS |
| | LOCATED IN A SPECIAL FLOOD HAZARD AREA. THE FLOOD MAPS |
| | INDICATE THIS AS AN "AE" FLOOD ZONE WITH A 6' BFE. IF |
| | THIS IS A SUBSTANTIAL IMPROVEMENT THE STRUCTURE WILL BE |
| | REQUIRED TO BE BROUGHT INTO COMPLIANCE WITH THE CITY OF |
| | WEST PALM BEACH'S FLOOD ORDINANCE. A SUBSTANTIAL |
| | IMPROVEMENT IS ANY IMPROVEMENTS OR REPAIRS TO A |
| | BUILDING OR STRUCTURE FOR WHICH THE CUMULATIVE COST IN |
| | ANY FIVE YEAR PERIOD EQUALS OR EXCEEDS 50 PERCENT OF |
| | THE MARKET VALUE OF THE BUILDING OR STRUCTURE AT THE |
| | END OF THE FIVE YEAR PERIOD AND BEFORE THE IMPROVEMENTS |
| | OR REPAIRS ARE STARTED. THE PROPERTY HAS THE |
| | IMPROVEMENT VALUE AS $706,079.00. FIFTY PERCENT OF THIS |
| | IS $393,039.50. THE CUMULATIVE TOTAL FOR WORK OVER THE |
| | PAST FIVE YEARS IS $114,296.00 AND THE VALUE SPECIFIED |
| | FOR THE PROPOSED WORK IS $100,000.00 WHICH TOTALS |
| | $214,296.00 WHICH IS LESS THAN THE FIFTY PERCENT |
| | NUMBER. HOWEVER, I SEE THAT YOU DO NOT HAVE A |
| | CONTRACTOR AT THIS TIME AND I WILL NEED A FIRM NUMBER |
| | FOR THE COST OF THE PROPOSED WORK BEFORE I CAN APPROVE |
| | THE PROJECT. |
| | |
| | 2) THE COST ESTIMATE FROM THE CONTRACTOR FOR THE GARAGE |
| | APARTMENT IS MISSING THE WORK FOR THE PROPOSED |
| | CANTILEVER BALCONY. FBC AMENDMENTS 107.2.1 |
| | |
| | 3) THE COST ESTIMATE FROM THE CONTRACTOR FOR THE GARAGE |
| | APARTMENT IS NOT SIGNED BY THE CONTRACTOR. FBC |
| | AMENDMENTS 107.2.1 |
| | |
| | 4) SUBMIT AN ELEVATION CERTIFICATE FOR THE DETACHED |
| | GARAGE APARTMENT THAT IS LOCATED IN THE SPECIAL FLOOD |
| | HAZARD AREA. |
| | |
| | 5) PROVISO. [PRODUCT APPROVALS WILL BE DEFERRED. THE |
| | PRODUCT APPROVALS ARE REQUIRED TO BE SUBMITTED AND |
| | APPROVED BY THE BUILDING DEPARTMENT BEFORE THEY ARE |
| | INSTALLED.] (PREVIOUS COMMENT) SUBMIT PRODUCT APPROVALS |
| | FOR THE TRANSOM WINDOWS AND FRENCH DOORS THAT HAVE BEEN |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD. FBC |
| | AMEND. 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS |
| | FOR THOSE PRODUCTS WHICH ARE REGULATED BY FAC |
| | 61G20-3.001 PER FLORIDA STATUTE 553.842 (5) THAT HAVE |
| | BEEN REVIEWED AND APPROVED IN WRITING BY THE DESIGNER |
| | OF RECORD. PROVIDE TWO COMPLETE PRODUCT APPROVALS WITH |
| | FL OR NOA NUMBERS INCLUDING INSTALLATION INSTRUCTIONS |
| | AND MAXIMUM DESIGN PRESSURES FOR EACH OF THE DIFFERENT |
| | ROOFING MATERIALS, WINDOW (GLASS TYPES), STRUCTURAL |
| | MULLIONS AND EXTERIOR DOOR TYPES. THESE ITEMS CAN BE |
| | DEFERRED IF REQUESTED, HOWEVER, THE DOCUMENTS MUST BE |
| | SUBMITTED AND APPROVED BY THE BUILDING DEPARTMENT |
| | BEFORE THEY CAN BE INSTALLED. ONLY ONE SET IS REQUIRED |
| | TO BE UPLOADED FOR ELECTRONICALLY SUBMITTED DOCUMENTS. |
| | |
| | 6) PROVISO. (NEW COMMENT). FENCES AND GATES ARE |
| | REQUIRED TO HAVE A SEPARATE PERMIT. |
| | |
| | |
| | |