| 2021-07-01 17:06:50 | 05/26/21 2ND GAS REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. ON SHEET P0.1, UNDER PLUMBING SHEET INDEX, IT HAS A |
| | P2.2 SECOND FLOOR PLUMBING PLAN - DOMESTIC WATER & |
| | NATURAL GAS. NO SUCH PAGE WAS FOUND. PLEASE PROVIDE OR |
| | REMOVE FROM INDEX PER THE WPB AMENDMENTS TO THE FBC |
| | SEC. 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 2. ON SHEET P3.1; |
| | A. PLEASE SHOW THE LOCATION OF THE TANK-LESS WATER |
| | HEATER AND THE LOCATION AND DISTANCE OF ANY OPERABLE |
| | DOORS OR WINDOWS IN RELATION TO THE WATER HEATER. THE |
| | LOCATION OF THE WATER HEATER SHALL COMPLY WITH THE |
| | MANUFACTURER'S INSTALLATION INSTRUCTIONS PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | B. PLEASE PROVIDE MANUFACTURER'S SPECIFICATION |
| | SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH 2020 FBC RES. SEC. G2408.1. |
| | |
| | C. PLEASE LIST THE BTU LOAD OF EACH APPLIANCE IN LEGEND |
| | TYPE AND THE TOTAL BTU LOAD ON THE SYSTEM PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | D. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, GAS |
| | METER TO THE MOST REMOTE OUTLET IN THE BUILDING AND |
| | SYSTEM PER THE 2020 FBC RES. SEC. G2413.4.1. |
| | |
| | E. PLEASE SUBMIT CALCULATIONS FOR COMBUSTION AIR PER |
| | THE 2020 FBC RES. SEC. G2407.1 AND G2439.4 (CLOTHES |
| | DRYERS AND RANGE). IF PROVIDED BY SUPPLIED BY A LOUVER, |
| | PLEASE SHOW LOCATION. |
| | |
| | F. PLEASE PROVIDE THE SIZING TABLE USED IN THE DESIGN |
| | FOR THE GAS SYSTEM OR PLACE A NOTE ON BOTH SETS OF |
| | PLANS LISTING THE SIZING TABLES FROM GAS CODES OR |
| | ANOTHER STANDARD USED IN THE DESIGN OF THIS SYSTEM PER |
| | THE 2020 FBC RES. SEC. G2413.3. |
| | |
| | G. PLEASE SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR |
| | THE PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION PER THE 2020 FBC RES. SEC. G2421.1. |
| | |
| | H. GAS P. E. SHOWN UNDER-SLAB IN A SLEEVE AND PIPING |
| | INSTALLED UNDERGROUND BENEATH BUILDINGS IS PROHIBITED |
| | PER THE 2020 FBC SEC. G2415.14 PIPING UNDERGROUND |
| | BENEATH BUILDINGS. THE AJH DOES NOT ALLOW THIS UNLESS |
| | IT IS APPROVED FOR AN ISLAND. |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION, |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |