Plan Review Notes
Plan Review Notes For Permit 21050545
Permit Number 21050545
Review Stop B
Sequence Number 3
Notes
Date Text
2022-07-05 11:21:26NEW SINGLE FAMILY RESIDENCE (R3), THIRD BUILDING REVIEW
 COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #21050545
  
 NOTE:
 BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO
 MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER
 THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID
 CONFLICTS/DELAYS. REVISION FEES MAY APPLY.
 CONTRACTOR TO ADVICE IF PROVISO OPTION IS PREFERRED AT
 THIS TIME OR IF RE-SUBMITTING REQUIRED INFORMATION
 BEFORE PERMIT ISSUANCE.
  
  
  
 ORIGINAL COMMENT:
 1-PROVIDE ENERGY CALCULATIONS AS REQUIRED BY SEC.
 R101.5.1 FBC-ENERGY CONSERVATION.
 NOTE: NEED TWO SEPARATE ENERGY CALCULATIONS. ONE FOR
 THE MAIN HOUSE AND ONE FOR THE REAR STRUCTURE.
 PLEASE MAKE SURE CALCULATIONS ARE SIGNED BY ALL THE
 REQUIRED PARTIES, INCLUDING THE OWNER OR AUTHORIZED
 AGENT TO AVOID CONFLICT/DELAYS.
 BUILDER TO SIGN AND COMPLETE THE ENERGY PERFORMANCE
 LEVEL (EPL) DISPLAY CARD SUBMITTED. SEC. R405.4.3 FBC-
 ENERGY CONSERVATION.
  
 RESPONSE:
 REVISE MAIN HOUSE ENERGY CALCULATIONS:
 A)PROVIDE COMPLETE INFORMATION ON TOP OF FORM,
 INCLUDING OWNER NAME, BUILDER NAME, PERMIT OFFICE AND
 JURISDICTION NUMBER (THIS JURISDICTION IS 604700). SEC.
 R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 B)CEILING INFORMATION ON ITEM #11 OF PAGE 1 DOESN'T
 MATCH PLANS. COORDINATE WITH ARCHITECT TO AVOID MORE
 CONFLICTS/DELAYS AND REVISE AS REQUIRED.
 NOTE: COORDINATE WITH ITEM #9 BELOW. ARCHITECT IS NOT
 SPECIFYING UNVENTED ATTIC. ARCHITECT NEEDS TO SPECIFY
 ATTIC VENTILATION AS REQUIRED BY SEC. R806.1
 FBC-RESIDENTIAL.
  
 C)PROJECT INFORMATION ON PAGE 2 IS INCORRECT. THE MAIN
 HOUSE IS ONE STORY NOT TWO STORY. REVISE AS REQUIRED.
 SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 D) REVISE/CLARIFY NUMBER OF OCCUPANTS SPECIFIED ON PAGE
 TWO UNDER SPACES.
 THIS IS A 3 BEDROOM HOUSE. CLARIFY WHY LIMITING THE USE
 OF THIS HOUSE TO ONLY TWO OCCUPANTS?. SEC. R101.5.1.1.2
 FBC-ENERGY CONSERVATION.
  
 E)REVISE WINDOWS AREA AND OVERHANG DEPTH & SEPARATION
 TO MATCH PLANS.
 NOTE: DOORS WITH GLAZING NEED TO BE CONSIDERED IN THE
 WINDOWS GLAZING SECTION.
  
 REVISE REAR STRUCTURE ENERGY CALCULATIONS:
 A)PROVIDE COMPLETE INFORMATION ON TOP OF FORM,
 INCLUDING OWNER NAME, BUILDER NAME, PERMIT OFFICE AND
 JURISDICTION NUMBER (THIS JURISDICTION IS 604700). SEC.
 R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 B)FLOOR INFORMATION ON ITEM #9 ON PAGE ONE DOESN'T
 MATCH PLANS. NEED INSULATION BETWEEN A/C AND NON A/C
 AREAS. ALSO, REVISE A/C SQUARE FOOTAGES. SEE PLANS AND
 REVISE AS REQUIRED. SEC. R101.5.1.1.2 FBC-ENERGY
 CONSERVATION.
  
 C)CEILING INFORMATION ON ITEM #11 OF PAGE 1 DOESN'T
 MATCH PLANS. COORDINATE WITH ARCHITECT TO AVOID MORE
 CONFLICTS/DELAYS AND REVISE AS REQUIRED.
 NOTE: ARCHITECT IS NOT SPECIFYING UNVENTED ATTIC.
 ARCHITECT NEEDS TO SPECIFY ATTIC VENTILATION AS
 REQUIRED BY SEC. R806.1 FBC-RESIDENTIAL.
  
 D)THERE IS NOT KITCHEN IN THIS STRUCTURE. SEE PLANS AND
 REVISE AS REQUIRED.
 SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 E)DOORS INFORMATION IS INCORRECT. THERE ARE NO SOLID
 WOOD DOORS IN THE REAR STRUCTURE. SEE PLANS AND REVISE
 AS REQUIRED. SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 F)REVISE WINDOWS AREA AND OVERHANG DEPTH & SEPARATION
 TO MATCH PLANS. ALSO, MAKE SURE ALL WINDOWS ARE
 INCLUDED IN THE CALCULATIONS. SEE PLANS.
 NOTE: DOORS WITH GLAZING NEED TO BE CONSIDERED IN THE
 WINDOWS GLAZING SECTION.
  
 2- OK.
 3- OK.
 4- OK.
 5- OK.
  
 6- DEFERRED SUBMITTAL:
 PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC 61G20-3.001
 FOR
 A)ALL WINDOWS AS SPECIFIED ON PLANS.
 B)ALL EXTERIOR DOORS AS SPECIFIED ON PLANS.
 C)ENTRY DOOR (SOLID WOOD AS SHOWN ON PLANS).
 D)OVERHEAD GARAGE DOOR.
 E)HURRICANE SHUTTERS IF DOORS AND WINDOWS DON'T HAVE
 IMPACT GLAZING. AND, PROVIDE COMPLETE INSTALLATION
 SCHEDULE. SEE CITY SAMPLE.
 F) FLAT ROOF. AND, CLEARLY MARK WHICH APPROVED ASSEMBLY
 IS GOING TO BE INSTALLED TO VERIFY COMPLIANCE WITH THE
 DESIGN PRESSURES OF SEC. R301.1 FBC-RESIDENTIAL.
 NOTE: IF THE SELECTED ASSEMBLY DOESN'T MEET THE DESIGN
 PRESSURES FOR ALL ROOF ZONES, THEN SIGNED AND SEALED
 RAS 117 CALCULATIONS ARE REQUIRED.
  
 7- OK.
 8- OK.
  
 9- ARCHITECT IS NOT DESIGNING AN UNVENTED ATTIC.
 COORDINATE WITH ENERGY CALCULATIONS COMMENTS. ARCHITECT
 NEEDS TO SPECIFY ATTIC/ROOF VENTILATION AS REQUIRED BY
 SEC. R806.1 FBC-RESIDENTIAL.
 NOTE: FIRST FLOOR PLAN ON SHEET A-1 SPECIFIES R-20
 ICYNENE INSULATION ABOVE GARAGE. IF ARCHITECT IS
 DESIGNING AN UNVENTED ATTIC, THEN ICYNENE INSULATION
 MAY BE USED ON MAIN HOUSE AND SECOND FLOOR ROOF ALSO.
 IF SO, REVISE PLANS/SECTIONS ACCORDINGLY.
  
 10- DRAWINGS M1, M2, E1 NEED ARCHITECT'S ORIGINAL
 DIGITAL SIGNATURE. DRAWINGS S1 THRU S9 NEED ENGINEER'S
 ORIGINAL DIGITAL SIGNATURE.
 ALSO, THE GEOTECHNICAL REPORT AND SURVEY NEED THE
 DESIGN PROFESSIONAL ORIGINAL SEAL/SIGNATURE.
 CHAPTER 481, CHAPTER 471 FLORIDA STATUTES.
  
  
 WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved