| Date |
Text |
| 2023-03-06 15:27:08 | BUILDING REVIEW APPROVED WITH PROVISO: |
| | 1- REVISE ENERGY CALCULATIONS: (A)COMPLETE TOP OF FORM, |
| | INCLUDING OWNER'S NAME, BUILDER'S NAME, PERMIT OFFICE |
| | AND JURISDICTION NUMBER (THIS JURISDICTION IS 604700). |
| | (B)REVISE ITEM #1. THIS IS NOT NEW CONSTRUCTION. |
| | (C)REVISE ITEM #11. CEILING INSULATION IS REQUIRED. |
| | SEC. R405.2.1 FBC-ENERGY CONSERVATION. (D)PROVIDE HOT |
| | WATER INFORMATION. (E)ITEM #16 IS TAKING THE CEILING |
| | FAN CREDIT. REVISE AS REQUIRED TO MATCH PLANS. |
| | (F)REVISE DOORS INFORMATION. WINDOW/DOOR PERMIT |
| | #22031558 AND #22031203 THERE ARE NOT WOOD DOORS. NOTE: |
| | GLAZING IN DOORS NEEDS TO BE INCLUDED IN THE WINDOW |
| | GLAZING AREA. (G)REVISE THE WINDOWS INFORMATION ON PAGE |
| | 3 TO MATCH PLANS. ALSO, INCLUDE DOORS WITH GLAZING. |
| | 2- REVISE WINDOW/DOOR DESIGN PRESSURES AS REQUIRED TO |
| | CORRESPOND TO EXPOSURE ???D???. |
| | 3- SHEET S102: ENGINEER OF RECORD TO PROVIDE |
| | SPECIFICATIONS FOR THE CONCRETE SLAB VAPOR BARRIER. |
| | 4- SHEET S103: SECTION 1: SPECIFY HOW IS THE 2X P.T. |
| | RAFTER ATTACHED TO THE BEAM?. |
| | 5- SHEET S104: ENGINEER TO PROVIDE SPECIFICATIONS FOR |
| | WELDING AT THE BASE AND TOP PLATES OF STEEL COLUMNS. |
| | ALSO, CLARIFY WHERE THE STEEL COLUMNS AND BEAMS ARE |
| | GOING TO BE INSTALLED. |
| | |
| | |
| | 03/06/23 TALKED TO MARK DONNELLY. GO WITH PROVISO. |
| | |
| | RESPONSE FROM MARK DONNELLY: |
| | PLEASE GO WITH PROVISO. |
| | ON THU, MAR 2, 2023 AT 2:15???PM JULIO C. GOMEZ |
| | WROTE: |
| | GOOD AFTERNOON MARK, |
| | |
| | |