| Date |
Text |
| 2021-05-06 12:50:24 | 2ND REVIEW FBC-2020 MECHANICAL |
| | PERMIT-21040258 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE |
| | FBC M- FLORIDA MECHANICAL CODE |
| | FBC EC- FLORIDA ENERGY CONSERVATION |
| | FBC FG- FLORIDA FUEL GAS |
| | FBC EX- FLORIDA EXISTING BUILDING CODE |
| | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) IN RESPONSE TO COMMENT #1: THIS DUCT ORIGINATES AT |
| | THE TYPE I HOOD ABOVE THE PIZZA OVEN. THE SUBMITTED |
| | DRAWING SHOWS THE ENTIRE DUCT IS ENCLOSED FROM THE HOOD |
| | TO THE IN-LINE EXHAUST FAN, THEN ENCLOSED AGAIN FROM |
| | THE OTHER SIDE OF THE IN-LINE FAN TO THE TERMINATION |
| | LOCATION. ACCORDING TO MASTER PERMIT # 17020796 SHEET |
| | A-1.2.01 THIS DUCT PASSES THROUGH A 2 HOUR RATED WALL |
| | SEPARATING THE KITCHEN FROM THE MANICURE/PEDICURE ROOM |
| | ONCE THE DUCT PENETRATES THE 2 HOUR RATED WALL IT WOULD |
| | BE REQUIRED TO BE EITHER IN AN ENCLOSURE OR A FIELD |
| | APPLIED ENCLOSURE (FBC M 506.3.11 LAST SENTENCE STATES |
| | ? FIRE DAMPERS AND SMOKE DAMPERS |
| | SHALL NOT BE INSTALLED IN GREASE DUCTS. THE CODE |
| | SECTION YOU REFERENCED (FBC M 506.3.11) EXCEPTION: A |
| | DUCT ENCLOSURE SHALL NOT BE REQUIRED FOR A GREASE DUCT |
| | THAT PENETRATES ONLY A NON-FIRE-RESISTANCE RATED |
| | ROOF/CEILING ASSEMBLY DOES NOT APPLY TO THIS DUCT AS |
| | THIS DUCT DOES NOT PENETRATE A NON-FIRE RESISTANCE |
| | RATED ROOF/CEILING ASSEMBLY BUT DOES PENETRATE A 2-HOUR |
| | FIRE RATED WALL. THE CODE SECTION I REFERENCED ON THE |
| | ORIGINAL REVIEW WOULD APPLY AND IS COPIED BELOW FOR |
| | YOUR REFERENCE. |
| | 506.5.1.2 IN-LINE FAN LOCATION. WHERE ENCLOSED DUCT |
| | SYSTEMS ARE CONNECTED TO IN-LINE FANS NOT LOCATED |
| | OUTDOORS, THE FAN SHALL BE LOCATED IN A ROOM OR SPACE |
| | HAVING THE SAME FIRE-RESISTANCE RATING AS THE DUCT |
| | ENCLOSURE. ACCESS SHALL BE PROVIDED FOR SERVICING AND |
| | CLEANING OF FAN COMPONENTS. SUCH ROOMS OR SPACES SHALL |
| | BE VENTILATED IN ACCORDANCE WITH THE FAN MANUFACTURER?S |
| | INSTALLATION INSTRUCTIONS. |
| | |
| | 2) IN RESPONSE TO QUESTION #2: PLEASE SHOW THE KEF-4 |
| | MEETS ALL OF SECTION ? 506.3.13.2 TERMINATION THROUGH |
| | AN EXTERIOR WALL?. |
| | |
| | ? EXHAUST OUTLETS SHALL BE PERMITTED TO TERMINATE |
| | THROUGH EXTERIOR WALLS WHERE THE SMOKE, GREASE, GASES, |
| | VAPORS AND ODORS IN THE DISCHARGE FROM SUCH |
| | TERMINATIONS DO NOT CREATE A PUBLIC |
| | NUISANCE OR A FIRE HAZARD. ? |
| | |
| | 3) IN RESPONSE TO COMMENT #3: IN REFERENCE OF SHEET |
| | A-1.2.01 OF THE MASTER DRAWINGS IT APPEARS THAT THE |
| | DUCT WORK FOR HOODS 1, HOOD 2 AND HOOD 3 PENETRATE THE |
| | 2-HOUR FIRE WALL THAT SEPARATES THE KITCHEN FROM HSKP |
| | BEFORE TURNING UP AND PENETRATING THE SHAFT AND EXITING |
| | THE SHAFT ON THE 4TH FLOOR IN THE MECHANICAL ROOM. THIS |
| | DUCT MUST EACH BE ENCLOSED FROM THE HOOD TO THE |
| | TERMINATION LOCATION AT THE EXTERIOR OF THE BUILDING. |
| | FBC M 506.3.11 & 506.3.11.2 SEE BELOW. |
| | |
| | 506.3.11.2 FIELD-APPLIED GREASE DUCT ENCLOSURE. |
| | GREASE DUCTS CONSTRUCTED IN ACCORDANCE WITH SECTION |
| | 506.3.1 SHALL BE ENCLOSED BY A LISTED AND LABELED FIELD |
| | APPLIED GREASE DUCT ENCLOSURE MATERIAL, SYSTEMS, |
| | PRODUCT, OR METHOD OF CONSTRUCTION SPECIFICALLY |
| | EVALUATED FOR SUCH PURPOSE IN ACCORDANCE WITH ASTM |
| | E2336. THE SURFACE OF THE DUCT SHALL BE CONTINUOUSLY |
| | COVERED ON ALL SIDES FROM THE POINT AT WHICH THE DUCT |
| | ORIGINATES TO THE OUTLET TERMINAL. DUCT PENETRATIONS |
| | SHALL BE PROTECTED WITH A THROUGH-PENETRATION FIRESTOP |
| | SYSTEM TESTED AND LISTED IN ACCORDANCE WITH ASTM E814 |
| | OR UL 1479 AND HAVING A ?F? AND ?T? RATING EQUAL TO THE |
| | FIRE-RESISTANCE RATING OF THE ASSEMBLY BEING |
| | PENETRATED. THE GREASE DUCT ENCLOSURE AND FIRESTOP |
| | SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE |
| | LISTING AND THE MANUFACTURER?S |
| | INSTRUCTIONS. PARTIAL APPLICATION OF A FIELD APPLIED |
| | GREASE DUCT ENCLOSURE SHALL NOT BE INSTALLED FOR THE |
| | SOLE PURPOSE OF REDUCING CLEARANCES TO COMBUSTIBLES AT |
| | ISOLATED SECTIONS OF GREASE DUCT. EXPOSED DUCT-WRAP |
| | SYSTEMS SHALL BE PROTECTED WHERE SUBJECT TO PHYSICAL |
| | DAMAGE. |
| | |
| | 4) IN RESPONSE TO COMMENT 4: THE RATED ROOM THAT THE |
| | IN-LINE FANS ARE LOCATED MUST BE VENTILATED IN |
| | ACCORDANCE WITH THE FAN MANUFACTURER?S INSTALLATION |
| | INSTRUCTIONS, PLEASE SHOW THIS ON THE DRAWINGS. FBC M |
| | 506.5.1.2 |
| | |
| | 5) IN RESPONSE TO COMMENT #5, 6 AND 7: THE EOR MUST |
| | SUBMIT REVISED DRAWINGS FOR THE ORIGINALLY APPROVED |
| | DRAWINGS SHOWING THE REQUIRED FIRE RATED WALL AND THE |
| | REQUIRED PROTECTION AT ALL DUCT PENETRATIONS. FBC |
| | 107.2.1 |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM. |
| | |
| | MICHAEL EDWARDS |
| | MECHANICAL EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL. 33401 |
| | 561-805-6728 |
| | [email protected] |
| | |