Plan Review Notes
Plan Review Notes For Permit 21040258
Permit Number 21040258
Review Stop M
Sequence Number 2
Notes
Date Text
2021-05-06 12:50:242ND REVIEW FBC-2020 MECHANICAL
 PERMIT-21040258
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE
 FBC M- FLORIDA MECHANICAL CODE
 FBC EC- FLORIDA ENERGY CONSERVATION
 FBC FG- FLORIDA FUEL GAS
 FBC EX- FLORIDA EXISTING BUILDING CODE
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) IN RESPONSE TO COMMENT #1: THIS DUCT ORIGINATES AT
 THE TYPE I HOOD ABOVE THE PIZZA OVEN. THE SUBMITTED
 DRAWING SHOWS THE ENTIRE DUCT IS ENCLOSED FROM THE HOOD
 TO THE IN-LINE EXHAUST FAN, THEN ENCLOSED AGAIN FROM
 THE OTHER SIDE OF THE IN-LINE FAN TO THE TERMINATION
 LOCATION. ACCORDING TO MASTER PERMIT # 17020796 SHEET
 A-1.2.01 THIS DUCT PASSES THROUGH A 2 HOUR RATED WALL
 SEPARATING THE KITCHEN FROM THE MANICURE/PEDICURE ROOM
 ONCE THE DUCT PENETRATES THE 2 HOUR RATED WALL IT WOULD
 BE REQUIRED TO BE EITHER IN AN ENCLOSURE OR A FIELD
 APPLIED ENCLOSURE (FBC M 506.3.11 LAST SENTENCE STATES
 ? FIRE DAMPERS AND SMOKE DAMPERS
 SHALL NOT BE INSTALLED IN GREASE DUCTS. THE CODE
 SECTION YOU REFERENCED (FBC M 506.3.11) EXCEPTION: A
 DUCT ENCLOSURE SHALL NOT BE REQUIRED FOR A GREASE DUCT
 THAT PENETRATES ONLY A NON-FIRE-RESISTANCE RATED
 ROOF/CEILING ASSEMBLY DOES NOT APPLY TO THIS DUCT AS
 THIS DUCT DOES NOT PENETRATE A NON-FIRE RESISTANCE
 RATED ROOF/CEILING ASSEMBLY BUT DOES PENETRATE A 2-HOUR
 FIRE RATED WALL. THE CODE SECTION I REFERENCED ON THE
 ORIGINAL REVIEW WOULD APPLY AND IS COPIED BELOW FOR
 YOUR REFERENCE.
 506.5.1.2 IN-LINE FAN LOCATION. WHERE ENCLOSED DUCT
 SYSTEMS ARE CONNECTED TO IN-LINE FANS NOT LOCATED
 OUTDOORS, THE FAN SHALL BE LOCATED IN A ROOM OR SPACE
 HAVING THE SAME FIRE-RESISTANCE RATING AS THE DUCT
 ENCLOSURE. ACCESS SHALL BE PROVIDED FOR SERVICING AND
 CLEANING OF FAN COMPONENTS. SUCH ROOMS OR SPACES SHALL
 BE VENTILATED IN ACCORDANCE WITH THE FAN MANUFACTURER?S
 INSTALLATION INSTRUCTIONS.
  
 2) IN RESPONSE TO QUESTION #2: PLEASE SHOW THE KEF-4
 MEETS ALL OF SECTION ? 506.3.13.2 TERMINATION THROUGH
 AN EXTERIOR WALL?.
  
 ? EXHAUST OUTLETS SHALL BE PERMITTED TO TERMINATE
 THROUGH EXTERIOR WALLS WHERE THE SMOKE, GREASE, GASES,
 VAPORS AND ODORS IN THE DISCHARGE FROM SUCH
 TERMINATIONS DO NOT CREATE A PUBLIC
 NUISANCE OR A FIRE HAZARD. ?
  
 3) IN RESPONSE TO COMMENT #3: IN REFERENCE OF SHEET
 A-1.2.01 OF THE MASTER DRAWINGS IT APPEARS THAT THE
 DUCT WORK FOR HOODS 1, HOOD 2 AND HOOD 3 PENETRATE THE
 2-HOUR FIRE WALL THAT SEPARATES THE KITCHEN FROM HSKP
 BEFORE TURNING UP AND PENETRATING THE SHAFT AND EXITING
 THE SHAFT ON THE 4TH FLOOR IN THE MECHANICAL ROOM. THIS
 DUCT MUST EACH BE ENCLOSED FROM THE HOOD TO THE
 TERMINATION LOCATION AT THE EXTERIOR OF THE BUILDING.
 FBC M 506.3.11 & 506.3.11.2 SEE BELOW.
  
 506.3.11.2 FIELD-APPLIED GREASE DUCT ENCLOSURE.
 GREASE DUCTS CONSTRUCTED IN ACCORDANCE WITH SECTION
 506.3.1 SHALL BE ENCLOSED BY A LISTED AND LABELED FIELD
 APPLIED GREASE DUCT ENCLOSURE MATERIAL, SYSTEMS,
 PRODUCT, OR METHOD OF CONSTRUCTION SPECIFICALLY
 EVALUATED FOR SUCH PURPOSE IN ACCORDANCE WITH ASTM
 E2336. THE SURFACE OF THE DUCT SHALL BE CONTINUOUSLY
 COVERED ON ALL SIDES FROM THE POINT AT WHICH THE DUCT
 ORIGINATES TO THE OUTLET TERMINAL. DUCT PENETRATIONS
 SHALL BE PROTECTED WITH A THROUGH-PENETRATION FIRESTOP
 SYSTEM TESTED AND LISTED IN ACCORDANCE WITH ASTM E814
 OR UL 1479 AND HAVING A ?F? AND ?T? RATING EQUAL TO THE
 FIRE-RESISTANCE RATING OF THE ASSEMBLY BEING
 PENETRATED. THE GREASE DUCT ENCLOSURE AND FIRESTOP
 SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE
 LISTING AND THE MANUFACTURER?S
 INSTRUCTIONS. PARTIAL APPLICATION OF A FIELD APPLIED
 GREASE DUCT ENCLOSURE SHALL NOT BE INSTALLED FOR THE
 SOLE PURPOSE OF REDUCING CLEARANCES TO COMBUSTIBLES AT
 ISOLATED SECTIONS OF GREASE DUCT. EXPOSED DUCT-WRAP
 SYSTEMS SHALL BE PROTECTED WHERE SUBJECT TO PHYSICAL
 DAMAGE.
  
 4) IN RESPONSE TO COMMENT 4: THE RATED ROOM THAT THE
 IN-LINE FANS ARE LOCATED MUST BE VENTILATED IN
 ACCORDANCE WITH THE FAN MANUFACTURER?S INSTALLATION
 INSTRUCTIONS, PLEASE SHOW THIS ON THE DRAWINGS. FBC M
 506.5.1.2
  
 5) IN RESPONSE TO COMMENT #5, 6 AND 7: THE EOR MUST
 SUBMIT REVISED DRAWINGS FOR THE ORIGINALLY APPROVED
 DRAWINGS SHOWING THE REQUIRED FIRE RATED WALL AND THE
 REQUIRED PROTECTION AT ALL DUCT PENETRATIONS. FBC
 107.2.1
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved