| Date |
Text |
| 2021-04-20 10:22:18 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE APPROVED PERMIT FOR THIS REVISION WAS APPLIED |
| | FOR ON JAN. 28, 2021. THE BOAT LIFT DRAWINGS HAVE |
| | SEVERAL REFERENCES TO THE FBC SIXTH EDITION (2017) AND |
| | ASCE 7-10. THE FBC SEVENTH EDITION (2020) WENT INTO |
| | EFFECT ON DECEMBER 31, 2020. ALL NEW PERMITS APPLIED |
| | FOR ON OR AFTER THAT DATE ARE REQUIRED TO COMPLY WITH |
| | AND REFERENCE THE 2020 FBC SEVENTH EDITION AND ASCE |
| | 7-16. FS CHAPTER 553 |
| | |
| | 2) THE PERMIT THAT WAS APPROVED IS TO INSTALL FOUR |
| | PILINGS FOR A FUTURE BOAT LIFT. THE BOAT LIFT WAS NOT |
| | INCLUDED IN THE SCOPE OF WORK FOR THE APPROVED PERMIT. |
| | THE REVISION IS TO ADD THE INSTALLATION OF THE BOAT |
| | LIFT TO THE PREVIOUSLY APPROVED PERMIT. THE INCREASE IN |
| | VALUE FOR THIS ADDITIONAL SCOPE OF WORK IS SPECIFIED AS |
| | $0.00 ON THE REVISION FORM. THE VALUE FOR THE INCREASED |
| | WORK IS THE COST OF THE BOAT LIFT (EVEN IF OWNER |
| | SUPPLIED), THE COST OF ALL OTHER MATERIALS/SERVICES |
| | REQUIRED, THE COST OF LABOR, PLUS OVERHEAD AND PROFIT. |
| | PROVIDE AN ACCURATE VALUATION. BUILDING PERMIT |
| | VALUATION. FOR PERMITTING PURPOSES, VALUATION OF FBC |
| | 109.3 BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT |
| | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, |
| | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, |
| | ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 3) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| | CITY RE-SUBMITTAL FORM. |