| Date |
Text |
| 2021-07-02 09:40:02 | CONDO REMODEL |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected]. |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) DOCUMENT LABELED "TRUMP PLAZA GHP4 CALCS |
| | (06.21.2021) - SS.PDF" WINDOW / DOOR CALCULATIONS SHOW |
| | THAT SOME OF THE PRODUCT APPROVALS PROVIDED DO NOT MEET |
| | THE REQUIRED PRESSURES. A COMMENT ON THE CALCULATIONS |
| | SAY THAT IT IS OK TO BE WITHIN 5% OF THE DESIGN |
| | PRESSURE - PLEASE HAVE THE ENGINEER EXPLAIN IN WRITING |
| | WHERE THAT IS ALLOWED PER THE FBC |
| | 2) PRODUCT APPROVALS NEED TO MEET THE REQUIRED DESIGN |
| | LOADS FBC 1609.1.1 |
| | 3) WINDOW AND DOOR PRODUCT APPROVALS MAY BE DEFERRED |
| | SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON THE |
| | CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT |
| | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |