| 2021-03-24 14:46:09 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) CIRCLE OR HI-LIGHT THE WIDOW, DOOR AND MULLION |
| | SIZES/SPANS, GLASS TYPE AND THEIR DESIGN PRESSURES FOR |
| | THE SPECIFIC ITEMS THAT WILL BE INSTALLED ON THE |
| | PRODUCT APPROVALS. FBC AMENDMENTS 107.2.1 |
| | |
| | 2) SUBMIT A WINDOW, MULLION AND DOOR SCHEDULE THAT |
| | IDENTIFIES EACH WINDOW AND DOOR TYPE. SPECIFY THE SIZE, |
| | THE REQUIRED DESIGN PRESSURE, THE WALL ZONE, THE |
| | PRODUCT APPROVAL NUMBER AND THE MAXIMUM DESIGN PRESSURE |
| | FOR THE ITEM FROM IT'S PRODUCT APPROVAL. FBC AMENDMENTS |
| | 107.2.1.2 |
| | |
| | 3) 107.3.4 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. |
| | WHEN IT IS REQUIRED THAT DOCUMENTS BE PREPARED BY A |
| | REGISTERED DESIGN PROFESSIONAL, THE BUILDING OFFICIAL |
| | SHALL BE AUTHORIZED TO REQUIRE THE OWNER TO ENGAGE AND |
| | DESIGNATE ON THE BUILDING PERMIT APPLICATION A |
| | REGISTERED DESIGN PROFESSIONAL WHO SHALL ACT AS THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. |
| | IF THE CIRCUMSTANCES REQUIRE, THE OWNER SHALL DESIGNATE |
| | A SUBSTITUTE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL PERFORM THE DUTIES |
| | REQUIRED OF THE ORIGINAL REGISTERED DESIGN PROFESSIONAL |
| | IN RESPONSIBLE CHARGE. THE BUILDING OFFICIAL SHALL BE |
| | NOTIFIED IN WRITING BY THE OWNER IF THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE IS CHANGED OR |
| | IS UNABLE TO CONTINUE TO PERFORM THE DUTIES. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL BE RESPONSIBLE FOR REVIEWING AND COORDINATING |
| | SUBMITTAL DOCUMENTS PREPARED BY OTHERS, INCLUDING |
| | PHASED AND DEFERRED SUBMITTAL ITEMS, FOR COMPATIBILITY |
| | WITH THE DESIGN OF THE BUILDING. THOSE PRODUCTS WHICH |
| | ARE REGULATED BY FAC RULE 61G20 SHALL BE REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO |
| | SUBMITTAL FOR JURISDICTIONAL APPROVAL. |
| | |
| | 4) 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF |
| | THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| | DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| | IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| | THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| | UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| | APPROVED BY THE BUILDING OFFICIAL. |
| | |
| | 5) SHOW HOW THE SLIDING GLASS DOORS IN WALL ZONE 5 MEET |
| | THE REQUIRED +55.7 PSF, -101.2 PSF COMPONENT AND |
| | CLADDING PRESSURES. FBC CHAPTER 16. |
| | |
| | 6) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| | CITY RE-SUBMITTAL FORM. |