| Date |
Text |
| 2022-04-25 17:18:03 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 2ND REVIEW: FBC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) NOT RESOLVED. [SUBMIT DETAILED SPECIFICATIONS FOR |
| | THE GENERATOR MODEL THAT WILL BE INSTALLED.] SUBMIT THE |
| | MANUFACTURER'S SPECIFICATIONS FOR THE NEW GENERATOR. |
| | SPECIFY THE MODEL NUMBER AND KW OF THE NEW GENERATOR. |
| | FBC AMENDMENTS 107.2.1 |
| | |
| | 2) NOT RESOLVED. PROVIDE DETAILS OF THE EXISTING |
| | GENERATOR SLAB AND SPECIFY THE NUMBER, TYPE AND SIZE OF |
| | THE FASTENERS THAT WILL BE USED TO ANCHOR THE GENERATOR |
| | TO THE SLAB TO RESIST WIND LOADS. FBC AMENDMENTS |
| | 107.2.1 |
| | |
| | 3) NOT RESOLVED. SHOW THAT THE GENERATOR IS LOCATED 5 |
| | FEET FROM THE WALLS OF ANY BUILDING. FBC- FUEL GAS |
| | 616.1 POWERED EQUIPMENT. PERMANENTLY INSTALLED |
| | EQUIPMENT POWERED BY INTERNAL COMBUSTION ENGINES AND |
| | TURBINES SHALL BE INSTALLED IN ACCORDANCE WITH THE |
| | MANUFACTURER'S INSTRUCTIONS AND NFPA 37. STATIONARY |
| | ENGINE GENERATOR ASSEMBLIES SHALL MEET THE REQUIREMENTS |
| | OF UL 2200. |
| | |
| | 4) NOT RESOLVED. SHOW THAT THE GENERATOR EXHAUST IS AT |
| | LEAST 10 FEET FROM ANY OPENINGS INTO A BUILDING. |
| | FBC-R303.5.1 INTAKE OPENINGS. MECHANICAL AND GRAVITY |
| | OUTDOOR AIR INTAKE OPENINGS SHALL BE LOCATED NOT LESS |
| | THAN 10 FEET (3048 MM) FROM ANY HAZARDOUS OR NOXIOUS |
| | CONTAMINANT, SUCH AS VENTS, CHIMNEYS, PLUMBING VENTS, |
| | STREETS, ALLEYS, PARKING LOTS AND LOADING DOCKS. |
| | |
| | 5) NOT RESOLVED. THE VALUE FOR THIS PROJECT OF $2350.00 |
| | APPEARS TO BE LOW. FOR PERMITTING PURPOSES THE |
| | VALUATION IS REQUIRED TO INCLUDE THE COSTS OF THE |
| | LABOR, MATERIALS, OVERHEAD AND PROFIT AS WOULD BE |
| | CHARGED BY A CONTRACTOR. PROVIDE A COMPLETE SCOPE OF |
| | WORK WITH A COST BREAKDOWN. FBC AMENDMENTS 109.3 |
| | BUILDING PERMIT VALUATION. FOR PERMITTING PURPOSES, |
| | VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL |
| | REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC, |
| | PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE |
| | WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 6) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| | CITY RE-SUBMITTAL FORM. |
| | |